IEEE 802.3 January 2025 Plenary Minutes

20 to 24 January, 2025



Minutes

Unconfirmed Minutes, IEEE 802.3 Ethernet Working Group Plenary 22 to 25 January, 2024, St. Petersburg, FL, USA

Administrative attachments

Attachment A1
IEEE 802.3 Working Group agenda

Attachment A2
IEEE 802.3 Working Group report

Attachment A3
IEEE 802.3 Meeting attendance procedures

Attachment A4
IEEE 802.3 Voters list (v1)

Attachment A5
IEEE 802.3 Membership list

Attachment A6
IEEE 802.3 Attendance list January 2025 Plenary

Attachment A7
IEEE 802.3 Future meetings closing report

Task Force and Study Group attachments

Working Group meeting reports

Attachment B1
As Needed

Liaison Attachments (External and Internal)

Attachment C1
OIF to IEEE 802.3: 800LR/800ZR IA Project updates
Attachment (Password protected)

Attachment C2
ITU-T SG15 to IEEE 802.3: LS/r on TQM and B400G (reply to SG15-LS139 and SG15-LS140)
Attachment (Password protected)

Attachment C3
ISO/IEC JTC 1/SC/WG 3 to IEEE 802.3: Liaison on ongoing activities

Attachment C4
ISO/IEC JTC 1/SC/WG 3 to IEEE 802.3: Liaison from ISO/IEC JTC 1/SC 25/WG 3 on the impact of optical return loss (ORL) on PON applications

Attachment C5
INCITS/Fibre Channel to IEEE 802.3: Fibre Channel request for liaison relationship

Attachment C6
ITU-T SG15 to IEEE 802.3: LS/r on FlexO payload type for 800GBASE-ER1


Draft Outgoing Liaison Letters and Liaison Contribution

Attachment D1
Draft Liaison - IEEE 802.3 to OIF: Reply to Liaison from OIF, ”800LR/800ZR IA Project updates”, dated 12 November 2024”

Attachment D2
Draft Liaison - IEEE 802.3 to UALink: “802.3 Ethernet Interconnect for AI” Assessment”

Attachment D3
Draft Liaison - IEEE 802.3 to SNIA: “802.3 Ethernet Interconnect for AI” Assessment”

Attachment D4
Draft Liaison - IEEE 802.3 to OCP: “802.3 Ethernet Interconnect for AI” Assessment”

Attachment D5
Draft Liaison - IEEE 802.3 to ITU-T SG15: “802.3 Ethernet Interconnect for AI” Assessment”

Attachment D6
Draft Liaison - IEEE 802.3 to EA: “802.3 Ethernet Interconnect for AI” Assessment”

Attachment D7
Draft Liaison - IEEE 802.3 to UEC: “802.3 Ethernet Interconnect for AI” Assessment”

Attachment D8
Draft Liaison - IEEE 802.3 to OIF: “802.3 Ethernet Interconnect for AI” Assessment”

Attachment D9
Draft Liaison - IEEE 802.3 to INCITS/Fibre Channel: Reply to INCITS/Fibre Channel liaison”

Attachment D10
Draft Liaison - IEEE 802.3 to ITU-T SG15: Reply to ITU-T SG15, SG15-TD4/WP2 ”

Attachment D11
Draft Liaison - IEEE 802.3 to ISO/IEC JTC1/SC25: Reply to ISO/IEC JTC 1/SC 25/WG 3 N 1398 on the impact of optical return loss (ORL) on passive optical network (PON) applications”

Final Outgoing Liaison Letters and Liaison Contribution

Attachment E1
Liaison - IEEE 802.3 to OIF: Reply to Liaison from OIF, ”800LR/800ZR IA Project updates”, dated 12 November 2024”

Attachment E2
Liaison - IEEE 802.3 to UALink: “802.3 Ethernet Interconnect for AI” Assessment”

Attachment E3
Liaison - IEEE 802.3 to SNIA: “802.3 Ethernet Interconnect for AI” Assessment”

Attachment E4
Liaison - IEEE 802.3 to OCP: “802.3 Ethernet Interconnect for AI” Assessment”

Attachment E5
Liaison - IEEE 802.3 to ITU-T SG15: “802.3 Ethernet Interconnect for AI” Assessment”

Attachment E6
Liaison - IEEE 802.3 to EA: “802.3 Ethernet Interconnect for AI” Assessment”

Attachment E7
Liaison - IEEE 802.3 to UEC: “802.3 Ethernet Interconnect for AI” Assessment”

Attachment E8
Liaison - IEEE 802.3 to OIF: “802.3 Ethernet Interconnect for AI” Assessment”

Attachment E9
Liaison - IEEE 802.3 to INCITS/Fibre Channel: Reply to INCITS/Fibre Channel liaison

Attachment E10
Liaison - IEEE 802.3 to ITU-T SG15: Reply to ITU-T SG15, SG15-TD4/WP2 ”

Attachment E11
Liaison - IEEE 802.3 to ISO/IEC JTC1/SC25: Reply to ISO/IEC JTC 1/SC 25/WG 3 N 1398 on the impact of optical return loss (ORL) on passive optical network (PON) applications


Return to IEEE 802.3 Minutes page
Last Update: 16-Feb-25


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]