IEEE 802.3 July 2011 Plenary Minutes
July 18-21, 2011
San Francisco, CA
Minutes
Approved Minutes, IEEE 802.3 CSMA/CD PLENARY, San Francisco, CA, July 18-21, 2011
Administrative attachments
Attachment A1
IEEE 802.3 Opening agenda
Attachment A2
IEEE 802.3 Closing agenda
Attachment A3
IEEE 802.3 Opening report
Attachment A4
IEEE 802.3 Closing report
Attachment A5
IEEE 802.3 Meeting attendance procedures
Attachment A6
IEEE 802.3 Voting member list
Attachment A7
IEEE 802.3 Potential voter list
Attachment A8
IEEE 802.3 Voters in peril
Attachment A9
IEEE 802.3 Attendance credit summary, March 2010 to May 2011
Attachment A10
IEEE 802.3 Attendance list
Attachment A11
IEEE 802.3 Treasury Report
Attachment A12
IEEE 802.3 Standards status
Attachment A13
IEEE 802.3 Room assignments
Attachment A14
IEEE 802.3 September 2011 interim meeting, Chicago, IL USA
Attachment A15
IEEE 802.3 Future Meetings opening report
Attachment A16
IEEE 802.3 Future Meetings closing report
Attachment A17
IEEE Registration Authority OUI Registry Tiers proposal
Attachment A18
IEEE Registration Authority Virtualization study
Task Force and Study Group attachments
Attachment B1
IEEE 802.3 Maintenance opening report
Attachment B2
IEEE 802.3 Maintenance closing report
Attachment B3
IEEE P802.3.1 MIB definitions for Ethernet Task Force opening report
Attachment B4
IEEE P802.3.1 MIB definitions for Ethernet Task Force closing report
Attachment B5
IEEE P802.3bf Ethernet Support for the IEEE P802.1AS Time Synchronization Protocol Task Force report
Attachment B6
IEEE P802.3bg 40Gb/s Ethernet Single-mode Fibre PMD Task Force Task Force report
Attachment B7
IEEE 802.3 100 Gb/s Backplane and Copper Cable Study Group opening report
Attachment B8
IEEE 802.3 100 Gb/s Backplane and Copper Cable Study Group closing report
Attachment B9
IEEE 802.3 Bandwidth Assessment Ad Hoc opening report
Attachment B10
IEEE 802.3 Bandwidth Assessment Ad Hoc closing report
Attachment B11
Call for Interest: Next generation 100 Gb/s Ethernet interfaces for optical fiber modules opening report
Attachment B12
Call for Interest: Next generation 100 Gb/s Ethernet interfaces for optical fiber modules closing report
Attachment B13
Call for Interest: Extended EPON PMDs opening report
Attachment B14
Call for Interest: Extended EPON PMDs closing report
Liaison Attachments (External and Internal)
Attachment C1
TIA TR-42 Liaison Report to 802.3
Attachment C2
ISO/IEC SC25/WG3 Liaison Report to 802.3
Attachment C3
IEEE P1904.1 SIEPON Liaison Report to 802.3
Attachment C4
Liaison letter COM5-LS76-E from ITU-T SG5 to IEEE 802.3 regarding Ethernet port isolation between ITU-T SG5 Home Networks Special Group and the IEEE 802.3 Group
Attachment C5
Liaison letter COM2-LS102-E from ITU-T SG2 to IEEE 802.3 regarding termination of the JCA-Mgt
Attachment
(Password protected)
Attachment C6
Liaison letter COM15-LS303-E from ITU-T SG15 to IEEE 802.3 answering liaison on copper 10 Gbit/s PHY asymmetry
Attachment C7
Liaison letter COM15-LS304-E from ITU-T SG15 to IEEE 802.3 answering liaison on IEEE P802.3bf, Sponsor Ballot Draft 3.2
Attachment C8
Liaison letter from the OIF to IEEE 802.3 regarding the CEI-28G-SR and CEI-25G-LR implementation agreements
Attachment 1: CEI-28G-SR
(Password protected)
Attachment 2: CEI-25G-LR
(Password protected)
Attachment 3: CEI Test Methodologies
(Password protected)
Attachment C9
Liaison letter from the OIF to IEEE 802.3 regarding the OIF Multi-Link Gearbox project
Attachment: MLG (Multi-Link Gearbox) Project Start Proposal
(Password protected)
Attachment C10
IEEE 802.1 and 802.3 Packet Transmission Pre-emption Problem Statements: 802.1 Activity Report to 802.3
Attachment C11
DRAFT liaison reply from IEEE 802.3 to ITU-T SG5 regarding Ethernet port isolation
Attachment C12
Request to IANA for additions to IANA-MAU-MIB
Return to IEEE 802.3 Minutes page
Last Update: 18-Nov 13