IEEE 802.3 July 2011 Plenary Minutes

July 18-21, 2011
San Francisco, CA



Minutes

Approved Minutes, IEEE 802.3 CSMA/CD PLENARY, San Francisco, CA, July 18-21, 2011


Administrative attachments

Attachment A1
IEEE 802.3 Opening agenda

Attachment A2
IEEE 802.3 Closing agenda

Attachment A3
IEEE 802.3 Opening report

Attachment A4
IEEE 802.3 Closing report

Attachment A5
IEEE 802.3 Meeting attendance procedures

Attachment A6
IEEE 802.3 Voting member list

Attachment A7
IEEE 802.3 Potential voter list

Attachment A8
IEEE 802.3 Voters in peril

Attachment A9
IEEE 802.3 Attendance credit summary, March 2010  to May 2011

Attachment A10
IEEE 802.3 Attendance list

Attachment A11
IEEE 802.3 Treasury Report

Attachment A12
IEEE 802.3 Standards status

Attachment A13
IEEE 802.3 Room assignments

Attachment A14
IEEE 802.3 September 2011 interim meeting, Chicago, IL USA

Attachment A15
IEEE 802.3 Future Meetings opening report

Attachment A16
IEEE 802.3 Future Meetings closing report

Attachment A17
IEEE Registration Authority OUI Registry Tiers proposal

Attachment A18
IEEE Registration Authority Virtualization study

Task Force and Study Group attachments

Attachment B1
IEEE 802.3 Maintenance opening report

Attachment B2
IEEE 802.3 Maintenance closing report

Attachment B3
IEEE P802.3.1 MIB definitions for Ethernet Task Force opening report

Attachment B4
IEEE P802.3.1 MIB definitions for Ethernet Task Force closing report

Attachment B5
IEEE P802.3bf Ethernet Support for the IEEE P802.1AS Time Synchronization Protocol Task Force report

Attachment B6
IEEE P802.3bg 40Gb/s Ethernet Single-mode Fibre PMD Task Force Task Force report

Attachment B7
IEEE 802.3 100 Gb/s Backplane and Copper Cable Study Group opening report

Attachment B8
IEEE 802.3 100 Gb/s Backplane and Copper Cable Study Group closing report

Attachment B9
IEEE 802.3 Bandwidth Assessment Ad Hoc opening report

Attachment B10
IEEE 802.3 Bandwidth Assessment Ad Hoc closing report

Attachment B11
Call for Interest: Next generation 100 Gb/s Ethernet interfaces for optical fiber modules opening report

Attachment B12
Call for Interest: Next generation 100 Gb/s Ethernet interfaces for optical fiber modules closing report

Attachment B13
Call for Interest: Extended EPON PMDs opening report

Attachment B14
Call for Interest: Extended EPON PMDs closing report

Liaison Attachments (External and Internal)

Attachment C1
TIA TR-42 Liaison Report to 802.3

Attachment C2
ISO/IEC SC25/WG3 Liaison Report to 802.3

Attachment C3
IEEE P1904.1 SIEPON Liaison Report to 802.3

Attachment C4
Liaison letter COM5-LS76-E from ITU-T SG5 to IEEE 802.3 regarding Ethernet port isolation between ITU-T SG5 Home Networks Special Group and the IEEE 802.3 Group

Attachment C5
Liaison letter COM2-LS102-E from ITU-T SG2 to IEEE 802.3 regarding termination of the JCA-Mgt
Attachment (Password protected)

Attachment C6
Liaison letter COM15-LS303-E from ITU-T SG15 to IEEE 802.3 answering liaison on copper 10 Gbit/s PHY asymmetry

Attachment C7
Liaison letter COM15-LS304-E from ITU-T SG15 to IEEE 802.3 answering liaison on IEEE P802.3bf, Sponsor Ballot Draft 3.2

Attachment C8
Liaison letter from the OIF to IEEE 802.3 regarding the CEI-28G-SR and CEI-25G-LR implementation agreements
Attachment 1: CEI-28G-SR (Password protected)
Attachment 2: CEI-25G-LR (Password protected)
Attachment 3: CEI Test Methodologies (Password protected)

Attachment C9
Liaison letter from the OIF to IEEE 802.3 regarding the OIF Multi-Link Gearbox project
Attachment: MLG (Multi-Link Gearbox) Project Start Proposal (Password protected)

Attachment C10
IEEE 802.1 and 802.3 Packet Transmission Pre-emption Problem Statements: 802.1 Activity Report to 802.3

Attachment C11
DRAFT liaison reply from IEEE 802.3 to ITU-T SG5 regarding Ethernet port isolation

Attachment C12
Request to IANA for additions to IANA-MAU-MIB


Return to IEEE 802.3 Minutes page
Last Update: 18-Nov 13


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]