IEEE 802.3 July 2012 Plenary Minutes

July 16-19, 2012
San Diego, CA, USA



Minutes

Approved Minutes, IEEE 802.3 Ethernet Working Group PLENARY, San Diego CA, July 16-19, 2012


Administrative attachments

Attachment A1
IEEE 802.3 Opening agenda

Attachment A2
IEEE 802.3 Closing agenda

Attachment A3
IEEE 802.3 Opening report

Attachment A4
IEEE 802.3 Closing report

Attachment A5
IEEE 802.3 Meeting attendance procedures

Attachment A6
IEEE 802.3 Voting member list

Attachment A7
IEEE 802.3 Potential voter list

Attachment A8
IEEE 802.3 Voters in peril

Attachment A9
IEEE 802.3 Attendance credit summary, March 2011 to May 2012

Attachment A10
IEEE 802.3 Attendance list

Attachment A11
IEEE 802.3 Treasury Report

Attachment A12
IEEE 802.3 Standards status

Attachment A13
IEEE 802.3 Joint Workshop with ITU-T opening report
Attachment 1 (Meeting framework)
Attachment 2 (Abstracts Submitted via 802.3 Process)

Attachment A14
IEEE 802.3 Joint Workshop with ITU-T closing report

Attachment A15
IEEE 802.1 / 802.3 Joint July Meeting Report to 802.3 Working Group

Attachment A16
IEEE 802.3 Future meetings opening report

Attachment A17
IEEE 802.3 Future meetings closing report

Attachment A18
IEEE 802.3 Room assignments

Task Force and Study Group attachments

Attachment B1
IEEE 802.3 Maintenance opening report

Attachment B2
IEEE 802.3 Maintenance closing report

Attachment B3
IEEE P802.3.1 (IEEE 802.3.1a) Ethernet MIBs (revision) Task Force opening report

Attachment B4
IEEE P802.3.1 (IEEE 802.3.1a) Ethernet MIBs (revision) Task Force closing report

Attachment B5
IEEE P802.3bj 100 Gb/s Backplane and Copper Task Force opening report

Attachment B6
IEEE P802.3bj 100 Gb/s Backplane and Copper Task Force closing report

Attachment B7
IEEE P802.3bk Extended EPON Task Force opening report

Attachment B8
IEEE P802.3bk Extended EPON Task Force closing report

Attachment B9
IEEE 802.3 Ethernet Bandwidth Assessment Ad Hoc opening report

Attachment B10
IEEE 802.3 Ethernet Bandwidth Assessment Ad Hoc closing report

Attachment B11
IEEE 802.3 Higher Speed Ethernet consensus industry connection activity opening report

Attachment B12
IEEE 802.3 Higher Speed Ethernet consensus industry connection activity closing report

Attachment B13
IEEE 802.3 Next Generation 40 Gb/s and 100 Gb/s Optical Ethernet Study Group opening report

Attachment B14
IEEE 802.3 Next Generation 40 Gb/s and 100 Gb/s Optical Ethernet Study Group closing report

Attachment B15
IEEE 802.3 EPON Protocol over a Coax (EPoC) PHY Study Group opening report

Attachment B16
IEEE 802.3 EPON Protocol over a Coax (EPoC) PHY Study Group closing report

Attachment B17
IEEE 802.3 Reduced Twisted Pair Gigabit Ethernet Study Group opening report

Attachment B18
IEEE 802.3 Reduced Twisted Pair Gigabit Ethernet Study Group closing report

Attachment B19
Call for interest: Next Generation BASE-T opening report

Attachment B20
Call for interest: Next Generation BASE-T closing report

Liaison Attachments (External and Internal)

Attachment C1
TIA TR-42 Liaison Report to 802.3

Attachment C2
Liaison letter from IEC SC 46C to IEEE 802.3 regarding specification for Twinax cables

Attachment C3
Liaison letter from ITU-T SG15 to IEEE 802.3 regarding the OTNT Standardization Work Plan
Attachment (Password protected)

Attachment C4
Liaison letter from the OIF to the IEEE 802.3 Next Generation 100 Gb/s Optical Ethernet Study Group regarding the OIF CEI-28G-VSR Project dated 19th March 2012
Attachment (Password protected)

Attachment C5
Liaison letter from the OIF to IEEE 802.3 regarding the OIF CEI-56G-VSR Project
Attachment (Password protected)

Attachment C6
Liaison letter from the OIF to IEEE 802.3 regarding the OIF MLG Project
Attachment (Password protected)

Attachment C7
Liaison letter from the OIF to the IEEE 802.3 Next Generation 100 Gb/s Optical Ethernet Study Group regarding the OIF CEI-28G-VSR Project dated 15th May 2012
Attachment (Password protected)

Attachment C8
Liaison letter from the OIF to IEEE 802.3 regarding the OIF MLG 2.0 Project
Attachment (Password protected)

Attachment C9
Liaison reply from IEEE 802.3 to IEC SC 46C regarding Twinax Cables to Support 10GBASE-CX4 and 40GBASE-CR4

Attachment C10
Liaison reply from IEEE 802.3 to OIF regarding multiple OIF liaison letters

Attachment C11
Liaison letter from IEEE 802.3 to ITU-T SG15 regarding completion of IEEE 802.3 Industry Connections Ethernet Bandwidth Assessment Ad hoc report

Attachment C12
Liaison letter from IEEE 802.3 to ITU-T SG15 regarding information on activities in the Access Network Transport area in IEEE 802.3 WG

Attachment C13
Liaison reply from IEEE 802.3 to ITU-T SG15 regarding the OTNT Standardization Work Plan


Return to IEEE 802.3 Minutes page
Last Update: 18-Nov 13


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]