IEEE 802.3 July 2013 Plenary Minutes

July 15-18, 2013
Geneva, CH



Minutes

Approved Minutes, IEEE 802.3 Ethernet Working Group PLENARY, Geneva, CH, July 15-18, 2013


Administrative attachments

Attachment A1
IEEE 802.3 Opening agenda

Attachment A2
IEEE 802.3 Closing agenda

Attachment A3
IEEE 802.3 Opening report

Attachment A4
IEEE 802.3 Closing report

Attachment A5
IEEE 802.3 Meeting attendance procedures

Attachment A6
IEEE 802.3 Voting member list

Attachment A7
IEEE 802.3 Potential voter list

Attachment A8
IEEE 802.3 Voters in peril

Attachment A9
IEEE 802.3 Attendance credit summary, March 2012 to May 2013

Attachment A10
IEEE 802.3 Attendance list

Attachment A11
IEEE 802.3 Treasury Report

Attachment A12
IEEE-SA's IoT

Attachment A13
IEEE 802.3 Standards status

Attachment A14
IEEE 802.3 Future meetings opening report

Attachment A15
IEEE 802.3 Future meetings closing report

Attachment A16
IEEE 802.3 Room assignments

Attachment A17
Ethernet Alliance offer to host IEEE P802.1 and IEEE P802.3 Interim Joint Session

Attachment A18
Ericsson offer to host IEEE P802.1 and IEEE P802.3 Interim Joint Session

Task Force and Study Group attachments

Attachment B1
IEEE 802.3 Maintenance opening report

Attachment B2
IEEE 802.3 Maintenance closing report

Attachment B3
IEEE P802.3.1 (IEEE 802.3.1a) Ethernet MIBs (revision) Task Force report

Attachment B4
IEEE P802.3bj 100 Gb/s Backplane and Copper Cable Task Force opening report

Attachment B5
IEEE P802.3bj 100 Gb/s Backplane and Copper Cable Task Force closing report

Attachment B6
IEEE P802.3bk Extended EPON Task Force opening report

Attachment B7
IEEE P802.3bk Extended EPON Task Force closing report

Attachment B8
IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables Task Force opening report

Attachment B9
IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables Task Force closing report

Attachment B10
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force opening report

Attachment B11
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force closing report

Attachment B12
IEEE P802.3bp Reduced Twisted Pair Gigabit Ethernet PHY Task Force opening report

Attachment B13
IEEE P802.3bp Reduced Twisted Pair Gigabit Ethernet PHY Task Force closing report

Attachment B14
IEEE P802.3bq 40GBASE-T Task Force opening report

Attachment B15
IEEE P802.3bq 40GBASE-T Task Force closing report

Attachment B16
IEEE 802.3 Distinguished Minimum Latency Traffic in a Converged Traffic Environment Study Group opening report

Attachment B17
IEEE 802.3 Distinguished Minimum Latency Traffic in a Converged Traffic Environment Study Group closing report

Attachment B18
IEEE 802.3 400 Gb/s Ethernet Study Group opening report

Attachment B19
IEEE 802.3 400 Gb/s Ethernet Study Group closing report

Attachment B20
IEEE 802.3 4-pair Power over Ethernet Study Group opening report

Attachment B21
IEEE 802.3 4-pair Power over Ethernet Study Group closing report

Attachment B22
Call for Interest: Power over Data Lines opening report

Attachment B23
Call for Interest: Power over Data Lines closing report

Attachment B24
Proposed Industry Connections Activity: NG-EPON opening report

Attachment B25
Proposed Industry Connections Activity: NG-EPON closing report

Liaison Attachments (External and Internal)

Attachment C1
TIA TR-42 Liaison Report to IEEE 802.3

Attachment C2
OIF: Multi-link Gearbox (MLG) 2.0 Project

Attachment C3
OIF: CEI-28G-VSR and CEI-28G-MR projects
Attachment 1 (Password protected)
Attachment 2 (Password protected)

Attachment C4
ITU SG15: SG15 OTNT Standardization Work Plan
Attachment (Password protected)

Attachment C5
ITU SG15: 400 Gb/s Ethernet Study Group

Attachment C6
OmniRAN EC SG July 2013 Liaison Report

Attachment C7
DRAFT liaison reply from IEEE 802.3 to IEEE P1904.1

Attachment C8
DRAFT liaison reply from IEEE 802.3 to China NB comment on IEEE Std 802.3-2012 pre-ballot during SC6

Attachment C9
DRAFT liaison reply from IEEE 802.3 to ISO IEC SC25 WG3 regarding a technical report for 40 Gbit/s cabling systems

Attachment C10
DRAFT liaison letter from IEEE 802.3 to TIA TR-47 regarding alignment between TIA TR-42.7 and ISO/IEC JTC 1/SC 25/WG 3

Attachment C11
DRAFT liaison letter from IEEE 802.3 to TIA TR-42.11 regarding harmonization of single-mode connection Return Loss

Attachment C12
Liaison reply from IEEE 802.3 to IEEE P1904.1

Attachment C13
Liaison reply from IEEE 802.3 to China NB comment on IEEE Std 802.3-2012 pre-ballot during SC6

Attachment C14
Liaison reply from IEEE 802.3 to ISO IEC SC25 WG3 regarding a technical report for 40 Gbit/s cabling systems

Attachment C15
Liaison letter from IEEE 802.3 to TIA TR-42 regarding alignment between TIA TR-42.7 and ISO/IEC JTC 1/SC 25/WG 3

Attachment C16
Liaison letter from IEEE 802.3 to TIA TR-42.11 regarding harmonization of single-mode connection Return Loss


Return to IEEE 802.3 Minutes page
Last Update: 06 Aug 13


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]