IEEE 802.3 July 2013 Plenary Minutes
July 15-18, 2013
Geneva, CH
Minutes
Approved Minutes, IEEE 802.3 Ethernet Working Group PLENARY, Geneva, CH, July 15-18, 2013
Administrative attachments
Attachment A1
IEEE 802.3 Opening agenda
Attachment A2
IEEE 802.3 Closing agenda
Attachment A3
IEEE 802.3 Opening report
Attachment A4
IEEE 802.3 Closing report
Attachment A5
IEEE 802.3 Meeting attendance procedures
Attachment A6
IEEE 802.3 Voting member list
Attachment A7
IEEE 802.3 Potential voter list
Attachment A8
IEEE 802.3 Voters in peril
Attachment A9
IEEE 802.3 Attendance credit summary, March 2012 to May 2013
Attachment A10
IEEE 802.3 Attendance list
Attachment A11
IEEE 802.3 Treasury Report
Attachment A12
IEEE-SA's IoT
Attachment A13
IEEE 802.3 Standards status
Attachment A14
IEEE 802.3 Future meetings opening report
Attachment A15
IEEE 802.3 Future meetings closing report
Attachment A16
IEEE 802.3 Room assignments
Attachment A17
Ethernet Alliance offer to host IEEE P802.1 and IEEE P802.3 Interim Joint Session
Attachment A18
Ericsson offer to host IEEE P802.1 and IEEE P802.3 Interim Joint Session
Task Force and Study Group attachments
Attachment B1
IEEE 802.3 Maintenance opening report
Attachment B2
IEEE 802.3 Maintenance closing report
Attachment B3
IEEE P802.3.1 (IEEE 802.3.1a) Ethernet MIBs (revision) Task Force report
Attachment B4
IEEE P802.3bj 100 Gb/s Backplane and Copper Cable Task Force opening report
Attachment B5
IEEE P802.3bj 100 Gb/s Backplane and Copper Cable Task Force closing report
Attachment B6
IEEE P802.3bk Extended EPON Task Force opening report
Attachment B7
IEEE P802.3bk Extended EPON Task Force closing report
Attachment B8
IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables Task Force opening report
Attachment B9
IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables Task Force closing report
Attachment B10
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force opening report
Attachment B11
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force closing report
Attachment B12
IEEE P802.3bp Reduced Twisted Pair Gigabit Ethernet PHY Task Force opening report
Attachment B13
IEEE P802.3bp Reduced Twisted Pair Gigabit Ethernet PHY Task Force closing report
Attachment B14
IEEE P802.3bq 40GBASE-T Task Force opening report
Attachment B15
IEEE P802.3bq 40GBASE-T Task Force closing report
Attachment B16
IEEE 802.3 Distinguished Minimum Latency Traffic in a Converged Traffic Environment Study Group opening report
Attachment B17
IEEE 802.3 Distinguished Minimum Latency Traffic in a Converged Traffic Environment Study Group closing report
Attachment B18
IEEE 802.3 400 Gb/s Ethernet Study Group opening report
Attachment B19
IEEE 802.3 400 Gb/s Ethernet Study Group closing report
Attachment B20
IEEE 802.3 4-pair Power over Ethernet Study Group opening report
Attachment B21
IEEE 802.3 4-pair Power over Ethernet Study Group closing report
Attachment B22
Call for Interest: Power over Data Lines opening report
Attachment B23
Call for Interest: Power over Data Lines closing report
Attachment B24
Proposed Industry Connections Activity: NG-EPON opening report
Attachment B25
Proposed Industry Connections Activity: NG-EPON closing report
Liaison Attachments (External and Internal)
Attachment C1
TIA TR-42 Liaison Report to IEEE 802.3
Attachment C2
OIF: Multi-link Gearbox (MLG) 2.0 Project
Attachment C3
OIF: CEI-28G-VSR and CEI-28G-MR projects
Attachment 1
(Password protected)
Attachment 2
(Password protected)
Attachment C4
ITU SG15: SG15 OTNT Standardization Work Plan
Attachment
(Password protected)
Attachment C5
ITU SG15: 400 Gb/s Ethernet Study Group
Attachment C6
OmniRAN EC SG July 2013 Liaison Report
Attachment C7
DRAFT liaison reply from IEEE 802.3 to IEEE P1904.1
Attachment C8
DRAFT liaison reply from IEEE 802.3 to China NB comment on IEEE Std 802.3-2012 pre-ballot during SC6
Attachment C9
DRAFT liaison reply from IEEE 802.3 to ISO IEC SC25 WG3 regarding a technical report for 40 Gbit/s cabling systems
Attachment C10
DRAFT liaison letter from IEEE 802.3 to TIA TR-47 regarding alignment between TIA TR-42.7 and ISO/IEC JTC 1/SC 25/WG 3
Attachment C11
DRAFT liaison letter from IEEE 802.3 to TIA TR-42.11 regarding harmonization of single-mode connection Return Loss
Attachment C12
Liaison reply from IEEE 802.3 to IEEE P1904.1
Attachment C13
Liaison reply from IEEE 802.3 to China NB comment on IEEE Std 802.3-2012 pre-ballot during SC6
Attachment C14
Liaison reply from IEEE 802.3 to ISO IEC SC25 WG3 regarding a technical report for 40 Gbit/s cabling systems
Attachment C15
Liaison letter from IEEE 802.3 to TIA TR-42 regarding alignment between TIA TR-42.7 and ISO/IEC JTC 1/SC 25/WG 3
Attachment C16
Liaison letter from IEEE 802.3 to TIA TR-42.11 regarding harmonization of single-mode connection Return Loss
Return to IEEE 802.3 Minutes page
Last Update: 06 Aug 13