IEEE 802.3 July 2014 Plenary Minutes
14 to 17 July, 2014
San Diego, CA, USA
Minutes
Approved Minutes, IEEE 802.3 Ethernet Working Group Plenary, San Diego, CA, USA, 14 to 17 July, 2014
Administrative attachments
Attachment A1
IEEE 802.3 Opening agenda
Attachment A2
IEEE 802.3 Closing agenda
Attachment A3
IEEE 802.3 Opening report
Attachment A4
IEEE 802.3 Closing report
Attachment A5
IEEE 802.3 Meeting attendance procedures
Attachment A6
IEEE 802.3 Voting member list
Attachment A7
IEEE 802.3 Potential voter list
Attachment A8
IEEE 802.3 Voters in peril
Attachment A9
IEEE 802.3 Attendance credit summary, March 2013 to May 2014
Attachment A10
IEEE 802.3 Attendance list Norfolk
Attachment A11
IEEE 802.3 Attendance list San Diego
Attachment A12
IEEE 802.3 Treasury Report
Attachment A13
IEEE 802.3 Standards status
Attachment A14
IEEE 802.3 Future meetings opening report
and
Sep 2015 host offer
Attachment A15
IEEE 802.3 Future meetings closing report
Attachment A16
IEEE 802.3 Rules opening report
Attachment A17
IEEE 802.3 Rules closing report
Task Force and Study Group attachments
Attachment B1
IEEE 802.3 Maintenance opening report
Attachment B2
IEEE 802.3 Maintenance closing report
Attachment B3
IEEE P802.3bj 100 Gb/s Backplane and Copper Cable Task Force opening report
Attachment B4
IEEE P802.3bm 40 Gb/s and 100 Gb/s Fiber Optic Task Force opening report
Attachment B5
IEEE P802.3bm 40 Gb/s and 100 Gb/s Fiber Optic Task Force closing report
Attachment B6
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force opening report
Attachment B7
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force closing report
Attachment B8
IEEE P802.3bp 1000BASE-T1 PHY Task Force opening report
Attachment B9
IEEE P802.3bp 1000BASE-T1 PHY Task Force closing report
Attachment B10
IEEE P802.3bq 40GBASE-T Task Force opening report
Attachment B11
IEEE P802.3bq 40GBASE-T Task Force closing report
Attachment B12
IEEE P802.3br Interspersing Express Traffic Task Force opening report
Attachment B13
IEEE P802.3br Interspersing Express Traffic Task Force closing report
Attachment B14
IEEE P802.3bs 400 Gb/s Ethernet Task Force opening report
Attachment B15
IEEE P802.3bs 400 Gb/s Ethernet Task Force closing report
Attachment B16
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force opening report
Attachment B17
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force closing report
Attachment B18
IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) Task Force opening report
Attachment B19
IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) Task Force closing report
Attachment B20
IEEE 802.3 Gigabit Plastic Optical Fibre (GPOF) Study Group opening report
Attachment B21
IEEE 802.3 Gigabit Plastic Optical Fibre (GPOF) Study Group closing report
Attachment B22
IEEE 802.3 100 Mb/s operation over a single twisted pair Study Group opening report
Attachment B23
IEEE 802.3 100 Mb/s operation over a single twisted pair Study Group closing report
Attachment B24
IEEE 802.3 Industry Connections NG-EPON Ad Hoc opening report
Attachment B25
Call for interest: 25 Gb/s Ethernet opening report
Attachment B26
Call for interest: 25 Gb/s Ethernet closing report
Liaison Attachments (External and Internal)
Attachment C1
TIA TR-42 Liaison Report to IEEE 802.3
Attachment C2
P1904 Liaison Report to IEEE 802.3
Attachment C3
ITU-T SG15 to IEEE 802.3 on ITU-T SG15 OTNT standardization work plan
Attachment 1
(Password protected)
Attachment C4
ITU-T SG15 to IEEE 802.3 regarding Ethernet preamble and mapping into GFP-F
Attachment C5
ITU-T SG15 to IEEE 802.3 regarding Generic Information Model for management
Attachment C6
ITU-T SG15 to IEEE 802.3 on ITU-T SG15 ANT standardization overview and work plan
Attachment C7
IEEE P1905.1 to IEEE 802.3 on the progress of P1905.1a
Attachment C8
OIF to IEEE P802.3bs on CEI 56G projects
Attachment C9
TIA TR-42 to IEEE 802.3 on the task group in support of HPSC applications
Attachment C10
TIA TR-42 to IEEE 802.3 on draft 2.0 of ANSI/TIA-568-C.2-1
Attachment 1
(Password protected)
Attachment C11
DRAFT liaison response to ITU-T SG15 on Ethernet preamble and mapping into GFP-F
Attachment C12
DRAFT liaison response to ITU-T SG15 on on Generic Information Model for management of transport NEs
Attachment C13
DRAFT liaison response to TIA TR-42 on the task group in support of HPSC applications
Attachment C14
Liaison response to ITU-T SG15 on Ethernet preamble and mapping into GFP-F
Attachment C15
Liaison response to ITU-T SG15 on on Generic Information Model for management of transport NEs
Attachment C16
Liaison response to TIA TR-42 on the task group in support of HPSC applications
Return to IEEE 802.3 Minutes page
Last Update: 3-Nov 2014