IEEE 802.3 July 2016 Plenary Minutes
25 to 28 July, 2016
San Diego
Minutes
Approved Minutes, IEEE 802.3 Ethernet Working Group Plenary, San Diego, CA, 25 to 28 July, 2016
Administrative attachments
Attachment A1
IEEE 802.3 Opening agenda
Attachment A2
IEEE 802.3 Closing agenda
Attachment A3
IEEE 802.3 Opening report
Attachment A4
IEEE 802.3 Closing report
Attachment A5
IEEE 802.3 Meeting attendance procedures
Attachment A6
IEEE 802.3 Voting member list
Attachment A7
IEEE 802.3 Potential voter list
Attachment A8
IEEE 802.3 Voters in peril
Attachment A9
IEEE 802.3 Attendance credit summary, March 2015 to June 2016
Attachment A10
IEEE 802.3 Attendance list San Diego
Attachment A11
IEEE 802.3 Treasury Report
Attachment A12
IEEE 802.3 Standards status
Attachment A13
Social event details
Attachment A14
IEEE 802.3 Future meetings closing report
and
Jan 2017 host offer
Task Force and Study Group attachments
Attachment B1
IEEE 802.3 Maintenance opening report
Attachment B2
IEEE 802.3 Maintenance closing report
Attachment B3
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force opening report
Attachment B4
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force closing report
Attachment B5
IEEE P802.3bp 1000BASE-T1 PHY Task Force opening report
Attachment B6
IEEE P802.3bq 40GBASE-T Task Force opening report
Attachment B7
IEEE P802.3br Interspersing Express Traffic Task Force opening report
Attachment B8
IEEE P802.3bs 200 Gb/s and 400 Gb/s Ethernet Task Force opening report
Attachment B9
IEEE P802.3bs 200 Gb/s and 400 Gb/s Ethernet Task Force closing report
Attachment B10
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force opening report
Attachment B11
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force closing report
Attachment B12
IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) Task Force opening report
Attachment B13
IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) Task Force closing report
Attachment B14
IEEE P802.3bv Gigabit Plastic Optical Fiber (GPOF) Task Force opening report
Attachment B15
IEEE P802.3bv Gigabit Plastic Optical Fiber (GPOF) Task Force closing report
Attachment B16
IEEE 802.3by 25 Gb/s Ethernet Task Force opening report
Attachment B17
IEEE P802.3bz 2.5GBASE-T and 5GBASE-T Task Force opening report
Attachment B18
IEEE P802.3bz 2.5GBASE-T and 5GBASE-T Task Force closing report
Attachment B19
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force opening report
Attachment B20
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force closing report
Attachment B21
IEEE P802.3cb 2.5 Gb/s and 5 Gb/s Backplane and Copper Cables Task Force opening report
Attachment B22
IEEE P802.3cb 2.5 Gb/s and 5 Gb/s Backplane and Copper Cables Task Force closing report
Attachment B23
IEEE P802.3cc 25 Gb/s Ethernet over single-mode fiber Task Force opening report
Attachment B24
IEEE P802.3cc 25 Gb/s Ethernet over single-mode fiber Task Force closing report
Attachment B25
IEEE P802.3cd 50Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force opening report
Attachment B26
IEEE P802.3cd 50Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force closing report
Attachment B27
IEEE 802.3 YANG data model(s) Study Group opening report
Attachment B28
IEEE 802.3 YANG data model(s) Study Group closing report
Attachment B29
Industry Connections Next Generation Enterprise/Campus/Data Center Ethernet opening report
Attachment B30
Industry Connections Next Generation Enterprise/Campus/Data Center Ethernet closing report
Attachment B31
Call for interest: 10Mb/s Extended reach single twisted pair Ethernet PHY opening report
Attachment B32
Call for interest: 10Mb/s Extended reach single twisted pair Ethernet PHY closing report
Liaison Attachments (External and Internal)
Attachment C1
TIA TR-42 Liaison Report to IEEE 802.3
Attachment C2
SCC-18 NFPA70/NEC Liaison Report to IEEE 802.3
Attachment C3
OIF to IEEE P802.3bs and P802.3cd regarding progress on OIF CEI-56G projects
Attachments
(Password protected)
Attachment C4
TIA TR-42 to IEEE 802.3 regarding single-mode return loss
Attachment C5
ITU-T SG15 to IEEE 802.3 on generation of YANG modules
Attachments
(Password protected)
Attachment C6
TIA TR-42 to IEEE P802.3bt on TSB-184-A Draft 7.1
Attachment
(Password protected)
Attachment C7
TIA TR-42 to IEEE P802.3bz on TSB-5021 Draft 1.1
Attachment
(Password protected)
Attachment C8
DRAFT liaison to ISO/IEC JTC1 SC6 on China NB comment on IEEE Std 802.3-2015
Attachment C9
DRAFT liaison to ITU-T SG15 on the status of the P802.3bs and P802.3cd Task Forces
Attachment C10
DRAFT liaison to TIA TR-42 on connector optical return loss
Attachment C11
DRAFT liaison to the Ethernet Alliance on power delivery over communications cabling
Attachment C12
DRAFT liaison to ISO/IEC SC25 WG3 on power delivery over communications cabling
Attachment C13
DRAFT liaison to NFPA on power delivery over communications cabling
Attachment C14
DRAFT liaison to IEC TC 64 on power delivery over communications cabling
Attachment C15
DRAFT liaison to TIA TR-42 on power delivery over communications cabling
Attachment C16
DRAFT liaison to ITU-T SG15 on YANG models
Attachment C17
Liaison to ISO/IEC JTC1 SC6 on China NB comment on IEEE Std 802.3-2015
Attachment C18
Liaison to ITU-T SG15 on the status of the P802.3bs and P802.3cd Task Forces
Attachment C19
Liaison to TIA TR-42 on connector optical return loss
Attachment C20
Liaison to the Ethernet Alliance on power delivery over communications cabling
Attachment C21
Liaison to ISO/IEC SC25 WG3 on power delivery over communications cabling
Attachment C22
Liaison to NFPA on power delivery over communications cabling
Attachment C23
Liaison to IEC TC 64 on power delivery over communications cabling
Attachment C24
Liaison to TIA TR-42 on power delivery over communications cabling
Attachment C25
Liaison to ITU-T SG15 on YANG models
Return to IEEE 802.3 Minutes page
Last Update: 11-Nov 2016