IEEE 802.3 July 2024 Plenary Minutes
15 to 18 July, 2024
Minutes
Unconfirmed Minutes, IEEE 802.3 Ethernet Working Group Plenary 15 to 18 July, 2024, Montreal, QC, Canada
Administrative attachments
Attachment A1
IEEE 802.3 Opening agenda
Attachment A2
IEEE 802.3 Closing agenda
Attachment A3
IEEE 802.3 Opening report
Attachment A4
IEEE 802.3 Closing report
Attachment A5
IEEE 802.3 Meeting attendance procedures
Attachment A6
IEEE 802.3 Voters list
Attachment A7
IEEE 802.3 Membership list
Attachment A8
IEEE 802.3 Potential voter list
Attachment A9
IEEE 802.3 Voters in peril
Attachment A10
IEEE 802.3 Attendance credit summary, March 2023 to May 2024
Attachment A11
IEEE 802.3 Attendance list July 2024 Plenary
Attachment A12
IEEE 802.3 Treasury Report
Attachment A13
IEEE 802.3 Future meetings closing report
Attachment A14
ITU-T SG15 Liaison report
Attachment A15
TIA TR-42 Liaison report
Task Force and Study Group attachments
Opening plenary meeting reports
Attachment B1
IEEE 802.3 Maintenance opening report
Attachment B2
IEEE P802.3da 10 Mb/s Single Pair Multidrop Segments Enhancement Task Force opening report
Attachment B3
IEEE P802.3dg 100 Mb/s Long-Reach Single Pair Ethernet Task Force opening report
Attachment B4
IEEE P802.3dj 200 Gb/s, 400 Gb/s, 800 Gb/s, and 1.6 Tb/s Ethernet Task Force opening report
Attachment B5
IEEE P802.3dk Greater than 50 Gb/s Bidirectional Optical Access PHYs Task Force opening report
Attachment B6
IEEE P802.3dm Asymmetrical Electrical Automotive Ethernet Task Force opening report
Attachment B7
IEEE Std 802.3-2022/Cor 1 (IEEE 802.3dn) Multi-Gigabit Automotive MDI Return Loss Task Force opening report
Attachment B8
IEEE P802.3.1 SMIv2 / P802.3.2 YANG Data Models Task Forces opening report
Attachment B9
IEEE 802.3 New Ethernet Applications Ad Hoc opening report
Attachment B10
IEEE 802.3 Power Delivery Coordinating Committee Ad Hoc opening report
Attachment B11
IEEE 802.3 Single-Pair Ethernet Powering Cabling Restrictions call for interest opening report
Closing plenary meeting reports
Attachment C1
IEEE 802.3 Maintenance closing report
Attachment C2
IEEE P802.3da 10 Mb/s Single Pair Multidrop Segments Enhancement Task Force closing report
Attachment C3
IEEE P802.3dg 100 Mb/s Long-Reach Single Pair Ethernet Task Force closing report
Attachment C4
IEEE P802.3dj 200 Gb/s, 400 Gb/s, 800 Gb/s, and 1.6 Tb/s Ethernet Task Force closing report
Attachment C5
IEEE P802.3dk Greater than 50 Gb/s Bidirectional Optical Access PHYs Task Force closing report
Attachment C6
IEEE P802.3dm Asymmetrical Electrical Automotive Ethernet Task Force closing report
Attachment C7
IEEE Std 802.3-2022/Cor 1 (IEEE 802.3dn) Multi-Gigabit Automotive MDI Return Loss Task Force closing report
Attachment C8
IEEE P802.3.1 SMIv2 / P802.3.2 YANG Data Models Task Forces closing report
Attachment C9
IEEE 802.3 Power Delivery Coordinating Committee Ad Hoc closing report
Attachment C10
IEEE 802.3 Single-Pair Ethernet Powering Cabling Restrictions call for interest closing report
Liaison Attachments (External and Internal)
Attachment D1
ASA to IEEE 802.3: Liaison of ASA Motion Link specification 2.0
Attachment
(Password protected)
Attachment D2
Confirmation of the establishment of a category C liaison with IEC IEC/TC 64/MT 2 and IEEE 802.3 WG
Attachment D3
BBF to IETF: Courtesy CC of Liaison to IETF Regarding Follow up on Management at Scale Projects
Attachment
(Password protected)
Attachment D4
TIA-TR42 to IEEE 802.3: Outbound (from TR-42) Liaison to IEEE 802.3 and Review of TIA-TSB-6000
Attachment D5
ITU-T SG15 to IEEE 802.3: LS/r on the latest version of Access Network Transport (ANT) and Home Network Transport (HNT) Standards Overviews and Work Plans
Attachment D6
ITU-T SG15 to IEEE 802.3: LS on the new version of the Access Network Transport (ANT) Standards Overview and Work Plan
Attachment D7
ITU-T SG15 to IEEE 802.3: LS on the new version of the Home Network Transport (HNT) Standards Overview and Work Plan
Attachment D8
ITU-T SG15 to IEEE 802.3: LS on revision of Recommendation G.652
Attachment1
(Password protected)
Attachment2
(Password protected)
Attachment D9
ITU-T SG15 to IEEE 802.3: LS/r on B400G work and EVM
Attachment
(Password protected)
Attachment D10
ITU-T SG15 to IEEE 802.3: LS/r on initiation of work to simplify ITU-T referencing of IEEE Std 802.3
Attachment
(Password protected)
Attachment D11
ITU-T SG15 to IEEE 802.3: LS on OTNT Standardization Work Plan Issue 34
Attachment
(Password protected)
Attachment D12
ITU-T SG15 to IEEE 802.3: LS on IM/DM modelling coordination
Draft Outgoing Liaison Letters and Liaison Contribution
Attachment E1
As needed
Final Outgoing Liaison Letters and Liaison Contribution
Attachment F1
As needed
Return to IEEE 802.3 Minutes page
Last Update: 16-July-24