IEEE 802.3 March 2011 Plenary Minutes

March 14-17, 2011
Singapore



Minutes

Approved Minutes, IEEE 802.3 CSMA/CD PLENARY, Singapore, March 14-17, 2011


Administrative attachments

Attachment A1
IEEE 802.3 Opening agenda

Attachment A2
IEEE 802.3 Closing agenda

Attachment A3
IEEE 802.3 Opening report

Attachment A4
IEEE 802.3 Closing report

Attachment A5
IEEE 802.3 Meeting attendance procedures

Attachment A6
IEEE 802.3 Voting member list

Attachment A7
IEEE 802.3 Potential voter list

Attachment A8
IEEE 802.3 Voters in peril

Attachment A9
IEEE 802.3 Attendance credit summary, November 2009  to January 2011

Attachment A10
IEEE 802.3 Attendance list

Attachment A11
IEEE 802.3 Treasury Report

Attachment A12
IEEE 802.3 Standards status

Attachment A13
IEEE 802.3 Room assignments

Attachment A14
IEEE 802.3 Future Meetings opening report

Attachment A15
IEEE 802.3 May 2011 interim meeting information (Lake Tahoe, NV USA)

Attachment A16
IEEE 802.3 Future Meetings closing report

Task Force and Study Group attachments

Attachment B1
IEEE 802.3 Maintenance opening report

Attachment B2
IEEE 802.3 Maintenance closing report

Attachment B3
IEEE 802.3 Interpretations opening report

Attachment B4
IEEE 802.3 Interpretations closing report

Attachment B5
IEEE P802.3be Ethernet Management Information Base Task Force opening report

Attachment B6
IEEE P802.3be Ethernet Management Information Base Task Force closing report

Attachment B7
IEEE P802.3bf Ethernet Support for the IEEE P802.1AS Time Synchronization Protocol Task Force opening report

Attachment B8
IEEE P802.3bf Ethernet Support for the IEEE P802.1AS Time Synchronization Protocol Task Force closing report

Attachment B9
IEEE P802.3bg 40 Gb/s Ethernet Single-mode Fibre PMD Task Force opening report

Attachment B10
IEEE P802.3bg 40 Gb/s Ethernet Single-mode Fibre PMD Task Force closing report

Attachment B11
IEEE 802.3 100 Gb/s Backplane and Copper Cable Study Group opening report

Attachment B12
IEEE 802.3 100 Gb/s Backplane and Copper Cable Study Group closing report

Attachment B13
IEEE 802.3 Bandwidth Assessment Ad Hoc opening report

Attachment B14
IEEE 802.3 Bandwidth Assessment Ad Hoc closing report

Liaison Attachments (External and Internal)

Attachment C1
TIA TR-42 Liaison Report to 802.3

Attachment C2
Liaison letter from the Cable Television Laboratories, Inc. to IEEE 802.3 regarding Multicast LLIDs in EPON systems

Attachment C3
Liaison letter COM15-LS247-E from ITU-T Study Group 15 to IEEE 802.3 regarding documents from IEEE 802.3bf

Attachment C4
Liaison letter COM15-LS274-E from ITU-T Study Group 15 to IEEE 802.3 regarding SG15 OTNT Standardization Work Plan
Attachment (Password protected)

Attachment C5
Liaison letter COM15-LS292-E from ITU-T Study Group 15 to IEEE 802.3 regarding copper 10 Gbit/s PHY asymmetry

Attachment C6
Liaison reply from IEEE 802.3 to the Cable Television Laboratories, Inc. regarding Multicast LLIDs in EPON systems

Attachment C7
Liaison reply from IEEE 802.3 to ITU-T Study Group 15 regarding documents from IEEE 802.3bf

Attachment C8
Liaison reply from IEEE 802.3 to ITU-T Study Group 15 regarding copper 10 Gbit/s PHY asymmetry

Attachment C9
Liaison letter from IEEE 802.3 to ITU-T Study Group 15 regarding the Ethernet Bandwidth Assessment Ad Hoc

Attachment C10
Liaison letter from IEEE 802.3 to the OIF regarding the Ethernet Bandwidth Assessment Ad Hoc

Attachment C11
Liaison letter from IEEE 802.3 to the PCI-SIG regarding the Ethernet Bandwidth Assessment Ad Hoc


Return to IEEE 802.3 Minutes page
Last Update: 13 Jun 11


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]