IEEE 802.3 March 2011 Plenary Minutes
March 14-17, 2011
Singapore
Minutes
Approved Minutes, IEEE 802.3 CSMA/CD PLENARY, Singapore, March 14-17, 2011
Administrative attachments
Attachment A1
IEEE 802.3 Opening agenda
Attachment A2
IEEE 802.3 Closing agenda
Attachment A3
IEEE 802.3 Opening report
Attachment A4
IEEE 802.3 Closing report
Attachment A5
IEEE 802.3 Meeting attendance procedures
Attachment A6
IEEE 802.3 Voting member list
Attachment A7
IEEE 802.3 Potential voter list
Attachment A8
IEEE 802.3 Voters in peril
Attachment A9
IEEE 802.3 Attendance credit summary, November 2009 to January 2011
Attachment A10
IEEE 802.3 Attendance list
Attachment A11
IEEE 802.3 Treasury Report
Attachment A12
IEEE 802.3 Standards status
Attachment A13
IEEE 802.3 Room assignments
Attachment A14
IEEE 802.3 Future Meetings opening report
Attachment A15
IEEE 802.3 May 2011 interim meeting information (Lake Tahoe, NV USA)
Attachment A16
IEEE 802.3 Future Meetings closing report
Task Force and Study Group attachments
Attachment B1
IEEE 802.3 Maintenance opening report
Attachment B2
IEEE 802.3 Maintenance closing report
Attachment B3
IEEE 802.3 Interpretations opening report
Attachment B4
IEEE 802.3 Interpretations closing report
Attachment B5
IEEE P802.3be Ethernet Management Information Base Task Force opening report
Attachment B6
IEEE P802.3be Ethernet Management Information Base Task Force closing report
Attachment B7
IEEE P802.3bf Ethernet Support for the IEEE P802.1AS Time Synchronization Protocol Task Force opening report
Attachment B8
IEEE P802.3bf Ethernet Support for the IEEE P802.1AS Time Synchronization Protocol Task Force closing report
Attachment B9
IEEE P802.3bg 40 Gb/s Ethernet Single-mode Fibre PMD Task Force opening report
Attachment B10
IEEE P802.3bg 40 Gb/s Ethernet Single-mode Fibre PMD Task Force closing report
Attachment B11
IEEE 802.3 100 Gb/s Backplane and Copper Cable Study Group opening report
Attachment B12
IEEE 802.3 100 Gb/s Backplane and Copper Cable Study Group closing report
Attachment B13
IEEE 802.3 Bandwidth Assessment Ad Hoc opening report
Attachment B14
IEEE 802.3 Bandwidth Assessment Ad Hoc closing report
Liaison Attachments (External and Internal)
Attachment C1
TIA TR-42 Liaison Report to 802.3
Attachment C2
Liaison letter from the Cable Television Laboratories, Inc. to IEEE 802.3 regarding Multicast LLIDs in EPON systems
Attachment C3
Liaison letter COM15-LS247-E from ITU-T Study Group 15 to IEEE 802.3 regarding documents from IEEE 802.3bf
Attachment C4
Liaison letter COM15-LS274-E from ITU-T Study Group 15 to IEEE 802.3 regarding SG15 OTNT Standardization Work Plan
Attachment
(Password protected)
Attachment C5
Liaison letter COM15-LS292-E from ITU-T Study Group 15 to IEEE 802.3 regarding copper 10 Gbit/s PHY asymmetry
Attachment C6
Liaison reply from IEEE 802.3 to the Cable Television Laboratories, Inc. regarding Multicast LLIDs in EPON systems
Attachment C7
Liaison reply from IEEE 802.3 to ITU-T Study Group 15 regarding documents from IEEE 802.3bf
Attachment C8
Liaison reply from IEEE 802.3 to ITU-T Study Group 15 regarding copper 10 Gbit/s PHY asymmetry
Attachment C9
Liaison letter from IEEE 802.3 to ITU-T Study Group 15 regarding the Ethernet Bandwidth Assessment Ad Hoc
Attachment C10
Liaison letter from IEEE 802.3 to the OIF regarding the Ethernet Bandwidth Assessment Ad Hoc
Attachment C11
Liaison letter from IEEE 802.3 to the PCI-SIG regarding the Ethernet Bandwidth Assessment Ad Hoc
Return to IEEE 802.3 Minutes page
Last Update: 13 Jun 11