IEEE 802.3 March 2012 Plenary Minutes
March 12-15, 2012
Waikoloa, HI
Minutes
Approved Minutes, IEEE 802.3 Ethernet Working Group PLENARY, Waikoloa HI, March 12-15, 2012
Administrative attachments
Attachment A1
IEEE 802.3 Opening agenda
Attachment A2
IEEE 802.3 Closing agenda
Attachment A3
IEEE 802.3 Opening report
Attachment A4
IEEE 802.3 Closing report
Attachment A5
IEEE 802.3 Meeting attendance procedures
Attachment A6
IEEE 802.3 Voting member list
Attachment A7
IEEE 802.3 Potential voter list
Attachment A8
IEEE 802.3 Voters in peril
Attachment A9
IEEE 802.3 Attendance credit summary, November 2010 to January 2012
Attachment A10
IEEE 802.3 Attendance list
Attachment A11
IEEE 802.3 Treasury Report
Attachment A12
IEEE 802.3 Standards status
Attachment A13
IEEE 802.3 Rules opening report
Attachment A14
IEEE 802.3 Joint Workshop with ITU-T
Attachment A15
IEEE 802.3 Future meetings opening report
Attachment A16
IEEE 802.3 Future meetings closing report
Attachment A17
IEEE 802.3 Room assignments
Task Force and Study Group attachments
Attachment B1
IEEE 802.3 Maintenance opening report
Attachment B2
IEEE 802.3 Maintenance closing report
Attachment B3
IEEE 802.3 Interpretations opening report
Attachment B4
IEEE 802.3 Interpretations closing report
Attachment B5
IEEE P802.3.1 (IEEE 802.3.1a) Ethernet MIBs (revision) Task Force opening report
Attachment B6
IEEE P802.3.1 (IEEE 802.3.1a) Ethernet MIBs (revision) Task Force closing report
Attachment B7
IEEE P802.3bj 100 Gb/s Backplane and Copper Task Force opening report
Attachment B8
IEEE P802.3bj 100 Gb/s Backplane and Copper Task Force closing report
Attachment B9
IEEE 802.3 Ethernet Bandwidth Assessment Ad Hoc opening report
Attachment B10
IEEE 802.3 Next Generation 100 Gb/s Optical Ethernet Study Group opening report
Attachment B11
IEEE 802.3 Next Generation 100 Gb/s Optical Ethernet Study Group closing report
Attachment B12
IEEE 802.3 Extended EPON Study Group opening report
Attachment B13
IEEE 802.3 Extended EPON Study Group closing report
Attachment B14
IEEE 802.3 EPON Protocol over a Coax (EPoC) PHY Study Group opening report
Attachment B15
IEEE 802.3 EPON Protocol over a Coax (EPoC) PHY Study Group closing report
Attachment B16
Call for Interest: Reduced Pair 1 Gb/s Ethernet opening report
Attachment B17
Call for Interest: Reduced Pair 1 Gb/s Ethernet closing report
Attachment B18
Call for Interest: Extended reach 40GBASE-R PMD opening report
Attachment B19
Call for Interest: Extended reach 40GBASE-R PMD closing report
Attachment B20
Call for Interest: Ethernet WDM Aggregation Network opening report
Attachment B21
Call for Interest: Ethernet WDM Aggregation Network closing report
Attachment B22
Call for Interest: MAC Services in support of Frame Pre-emption opening report
Attachment B23
Call for Interest: MAC Services in support of Frame Pre-emption closing report
Liaison Attachments (External and Internal)
Attachment C1
ISO/IEC SC25/WG3 report to 802.3
Attachment C2
TIA TR-42 Liaison Report to 802.3
Attachment C3
Liaison letter from the OIF to IEEE 802.3 regarding the OIF CEI-28G-VSR Project
Attachment
(Password protected)
Attachment C4
Liaison letter from the OIF to IEEE 802.3 regarding the OIF MLG Project
Attachment
(Password protected)
Attachment C5
Liaison letter from ITU-T SG15 to IEEE 802.3 regarding study status of ITU-T G.epon
Attachment
(Password protected)
Attachment C6
Liaison letter from ITU-T SG15 to IEEE 802.3 regarding study status of G.epon after Huntsville meeting (9 February 2012)
Attachment
(Password protected)
Attachment C7
Liaison letter from IEEE P1904.1 to ITU-T SG15 regarding OMCI for EPON systems
Attachment C8
Liaison letter from IEEE P1904.1 to ITU-T SG15 regarding ITU-T liaison letter dated 16 December 2011
Attachment C9
DRAFT liaison reply from IEEE 802.3 to ITU-T SG15 regarding LS-348 and LS-380
Attachment C10
DRAFT liaison reply from IEEE 802.3 to the OIF regarding the OIF MLG Project
Return to IEEE 802.3 Minutes page
Last Update: 18-Nov 13