IEEE 802.3 March 2014 Plenary Minutes

17 to 20 March, 2014
Beijing, China





Minutes

Approved Minutes, IEEE 802.3 Ethernet Working Group Plenary, Beijing, China, 17 to 20 March, 2014


Administrative attachments

Attachment A1
IEEE 802.3 Opening agenda

Attachment A2
IEEE 802.3 Closing agenda

Attachment A3
IEEE 802.3 Opening report

Attachment A4
IEEE 802.3 Closing report

Attachment A5
IEEE 802.3 Meeting attendance procedures

Attachment A6
IEEE 802.3 Voting member list

Attachment A7
IEEE 802.3 Potential voter list

Attachment A8
IEEE 802.3 Voters in peril

Attachment A9
IEEE 802.3 Attendance credit summary, November 2012 to January 2014

Attachment A10
IEEE 802.3 Attendance list Indian Wells

Attachment A11
IEEE 802.3 Attendance list Beijing

Attachment A12
IEEE 802.3 Treasury Report

Attachment A13
IEEE 802.3 Standards status

Attachment A14
IEEE 802.3 Future meetings opening report and May interim update

Attachment A15
IEEE 802.3 Future meetings closing report

Attachment A16
IEEE 802.3 Room assignments

Attachment A17
IEEE 802.3 Rules opening report

Attachment A18
IEEE 802.3 Rules closing report

Task Force and Study Group attachments

Attachment B1
IEEE 802.3 Maintenance opening report

Attachment B2
IEEE 802.3 Maintenance closing report

Attachment B3
IEEE P802.3bj 100 Gb/s Backplane and Copper Cable Task Force opening report

Attachment B4
IEEE P802.3bj 100 Gb/s Backplane and Copper Cable Task Force closing report

Attachment B5
IEEE P802.3bm 40 Gb/s and 100 Gb/s Fiber Optic Task Force opening report

Attachment B6
IEEE P802.3bm 40 Gb/s and 100 Gb/s Fiber Optic Task Force closing report

Attachment B7
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force opening report

Attachment B8
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force closing report

Attachment B9
IEEE P802.3bp Reduced Twisted Pair Gigabit Ethernet PHY Task Force opening report

Attachment B10
IEEE P802.3bp Reduced Twisted Pair Gigabit Ethernet PHY Task Force closing report

Attachment B11
IEEE P802.3bq 40GBASE-T Task Force opening report

Attachment B12
IEEE P802.3bq 40GBASE-T Task Force closing report

Attachment B13
IEEE P802.3br Interspersing Express Traffic Task Force opening report

Attachment B14
IEEE P802.3br Interspersing Express Traffic Task Force closing report

Attachment B15
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force opening report

Attachment B16
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force closing report

Attachment B17
IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) Task Force opening report

Attachment B18
IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) Task Force closing report

Attachment B19
IEEE 802.3 400 Gb/s Ethernet Study Group opening report

Attachment B20
IEEE 802.3 400 Gb/s Ethernet Study Group closing report

Attachment B21
IEEE 802.3 Industry Connections NG-EPON Ad Hoc opening report

Attachment B22
IEEE 802.3 Industry Connections NG-EPON Ad Hoc closing report

Attachment B23
Call for interest: Gigabit Plastic Optical Fibre (POF) opening report

Attachment B24
Call for interest: Gigabit Plastic Optical Fibre (POF) closing report

Attachment B25
Call for interest: 100 Mb/s operation over a single twisted pair opening report

Attachment B26
Call for interest: 100 Mb/s operation over a single twisted pair closing report

Attachment B27
Call for interest: 25 Gb/s Ethernet closing report

Liaison Attachments (External and Internal)

Attachment C1
ISO/IEC SC25/WG3 report to IEEE 802.3

Attachment C2
TIA TR-42 Liaison Report to IEEE 802.3

Attachment C3
TIA TR-42 to IEEE 802.3 regarding single-mode connection return loss

Attachment C4
ISO/IEC SC25/WG3 to IEEE 802.3 regarding higher levels of PoE

Attachment C5
IEEE 1905.1 to IEEE 802.3 regarding liaison with CDHN

Attachment C6
DRAFT liaison response to ITU-T SG15 on OTNT work plan

Attachment C7
DRAFT liaison response to TIA TR-42 on single-mode connection return loss

Attachment C8
DRAFT liaison response to SC25 on impact of higher levels of PoE on cabling

Attachment C9
DRAFT liaison response to TIA TR-42 on impact of higher levels of PoE on cabling

Attachment C10
Liaison response to ITU-T SG15 on OTNT work plan

Attachment C11
Liaison response to TIA TR-42 on single-mode connection return loss

Attachment C12
Liaison response to SC25 on impact of higher levels of PoE on cabling

Attachment C13
Liaison response to TIA TR-42 on impact of higher levels of PoE on cabling


Return to IEEE 802.3 Minutes page
Last Update: 14-Jul 2014


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]