IEEE 802.3 March 2014 Plenary Minutes
17 to 20 March, 2014
Beijing, China
Minutes
Approved Minutes, IEEE 802.3 Ethernet Working Group Plenary, Beijing, China, 17 to 20 March, 2014
Administrative attachments
Attachment A1
IEEE 802.3 Opening agenda
Attachment A2
IEEE 802.3 Closing agenda
Attachment A3
IEEE 802.3 Opening report
Attachment A4
IEEE 802.3 Closing report
Attachment A5
IEEE 802.3 Meeting attendance procedures
Attachment A6
IEEE 802.3 Voting member list
Attachment A7
IEEE 802.3 Potential voter list
Attachment A8
IEEE 802.3 Voters in peril
Attachment A9
IEEE 802.3 Attendance credit summary, November 2012 to January 2014
Attachment A10
IEEE 802.3 Attendance list Indian Wells
Attachment A11
IEEE 802.3 Attendance list Beijing
Attachment A12
IEEE 802.3 Treasury Report
Attachment A13
IEEE 802.3 Standards status
Attachment A14
IEEE 802.3 Future meetings opening report
and
May interim update
Attachment A15
IEEE 802.3 Future meetings closing report
Attachment A16
IEEE 802.3 Room assignments
Attachment A17
IEEE 802.3 Rules opening report
Attachment A18
IEEE 802.3 Rules closing report
Task Force and Study Group attachments
Attachment B1
IEEE 802.3 Maintenance opening report
Attachment B2
IEEE 802.3 Maintenance closing report
Attachment B3
IEEE P802.3bj 100 Gb/s Backplane and Copper Cable Task Force opening report
Attachment B4
IEEE P802.3bj 100 Gb/s Backplane and Copper Cable Task Force closing report
Attachment B5
IEEE P802.3bm 40 Gb/s and 100 Gb/s Fiber Optic Task Force opening report
Attachment B6
IEEE P802.3bm 40 Gb/s and 100 Gb/s Fiber Optic Task Force closing report
Attachment B7
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force opening report
Attachment B8
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force closing report
Attachment B9
IEEE P802.3bp Reduced Twisted Pair Gigabit Ethernet PHY Task Force opening report
Attachment B10
IEEE P802.3bp Reduced Twisted Pair Gigabit Ethernet PHY Task Force closing report
Attachment B11
IEEE P802.3bq 40GBASE-T Task Force opening report
Attachment B12
IEEE P802.3bq 40GBASE-T Task Force closing report
Attachment B13
IEEE P802.3br Interspersing Express Traffic Task Force opening report
Attachment B14
IEEE P802.3br Interspersing Express Traffic Task Force closing report
Attachment B15
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force opening report
Attachment B16
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force closing report
Attachment B17
IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) Task Force opening report
Attachment B18
IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) Task Force closing report
Attachment B19
IEEE 802.3 400 Gb/s Ethernet Study Group opening report
Attachment B20
IEEE 802.3 400 Gb/s Ethernet Study Group closing report
Attachment B21
IEEE 802.3 Industry Connections NG-EPON Ad Hoc opening report
Attachment B22
IEEE 802.3 Industry Connections NG-EPON Ad Hoc closing report
Attachment B23
Call for interest: Gigabit Plastic Optical Fibre (POF) opening report
Attachment B24
Call for interest: Gigabit Plastic Optical Fibre (POF) closing report
Attachment B25
Call for interest: 100 Mb/s operation over a single twisted pair opening report
Attachment B26
Call for interest: 100 Mb/s operation over a single twisted pair closing report
Attachment B27
Call for interest: 25 Gb/s Ethernet closing report
Liaison Attachments (External and Internal)
Attachment C1
ISO/IEC SC25/WG3 report to IEEE 802.3
Attachment C2
TIA TR-42 Liaison Report to IEEE 802.3
Attachment C3
TIA TR-42 to IEEE 802.3 regarding single-mode connection return loss
Attachment C4
ISO/IEC SC25/WG3 to IEEE 802.3 regarding higher levels of PoE
Attachment C5
IEEE 1905.1 to IEEE 802.3 regarding liaison with CDHN
Attachment C6
DRAFT liaison response to ITU-T SG15 on OTNT work plan
Attachment C7
DRAFT liaison response to TIA TR-42 on single-mode connection return loss
Attachment C8
DRAFT liaison response to SC25 on impact of higher levels of PoE on cabling
Attachment C9
DRAFT liaison response to TIA TR-42 on impact of higher levels of PoE on cabling
Attachment C10
Liaison response to ITU-T SG15 on OTNT work plan
Attachment C11
Liaison response to TIA TR-42 on single-mode connection return loss
Attachment C12
Liaison response to SC25 on impact of higher levels of PoE on cabling
Attachment C13
Liaison response to TIA TR-42 on impact of higher levels of PoE on cabling
Return to IEEE 802.3 Minutes page
Last Update: 14-Jul 2014