IEEE 802.3 March 2016 Plenary Minutes
14 to 17 March, 2016
Macau, China
Minutes
Approved Minutes, IEEE 802.3 Ethernet Working Group Plenary, Macau, China, 14 to 17 March, 2016
Administrative attachments
Attachment A1
IEEE 802.3 Opening agenda
Attachment A2
IEEE 802.3 Closing agenda
Attachment A3
IEEE 802.3 Opening report
Attachment A4
IEEE 802.3 Closing report
Attachment A5
IEEE 802.3 Meeting attendance procedures
Attachment A6
IEEE 802.3 Voting member list
Attachment A7
IEEE 802.3 Potential voter list
Attachment A8
IEEE 802.3 Voters in peril
Attachment A9
IEEE 802.3 Attendance credit summary, November 2014 to February 2016
Attachment A10
IEEE 802.3 Attendance list Piscataway
Attachment A11
IEEE 802.3 Attendance list Macau
Attachment A12
IEEE 802.3 Treasury Report
Attachment A13
IEEE 802.3 Standards status
Attachment A14
IEEE 802.3 Future meetings closing report
Attachment A15
IEEE 802.3 Rules opening report
Attachment A16
IEEE 802.3 Rules closing report
Task Force and Study Group attachments
Attachment B1
IEEE 802.3 Maintenance opening report
Attachment B2
IEEE 802.3 Maintenance closing report
Attachment B3
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force opening report
Attachment B4
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force closing report
Attachment B5
IEEE P802.3bp 1000BASE-T1 PHY Task Force opening report
Attachment B6
IEEE P802.3bp 1000BASE-T1 PHY Task Force closing report
Attachment B7
IEEE P802.3bq 40GBASE-T Task Force opening report
Attachment B8
IEEE P802.3bq 40GBASE-T Task Force closing report
Attachment B9
IEEE P802.3br Interspersing Express Traffic Task Force opening report
Attachment B10
IEEE P802.3br Interspersing Express Traffic Task Force closing report
Attachment B11
IEEE P802.3bs 400 Gb/s Ethernet Task Force opening report
Attachment B12
IEEE P802.3bs 400 Gb/s Ethernet Task Force closing report
Attachment B13
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force opening report
Attachment B14
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force closing report
Attachment B15
IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) Task Force opening report
Attachment B16
IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) Task Force closing report
Attachment B17
IEEE P802.3bv Gigabit Plastic Optical Fiber (GPOF) Task Force opening report
Attachment B18
IEEE P802.3bv Gigabit Plastic Optical Fiber (GPOF) Task Force closing report
Attachment B19
IEEE 802.3by 25 Gb/s Ethernet Task Force opening report
Attachment B20
IEEE P802.3by 25 Gb/s Ethernet Task Force closing report
Attachment B21
IEEE P802.3bz 2.5GBASE-T and 5GBASE-T Task Force opening report
Attachment B22
IEEE P802.3bz 2.5GBASE-T and 5GBASE-T Task Force closing report
Attachment B23
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force opening report
Attachment B24
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force closing report
Attachment B25
IEEE P802.3cb 2.5 Gb/s and 5 Gb/s Backplane and Copper Cables Task Force opening report
Attachment B26
IEEE P802.3cb 2.5 Gb/s and 5 Gb/s Backplane and Copper Cables Task Force closing report
Attachment B27
IEEE 802.3 50 Gb/s Ethernet over a single lane and next generation 100 Gb/s and 200 Gb/s Ethernet Study Group
and 200 Gb/s Ethernet Single Mode Fiber Study Group opening report
Attachment B28
IEEE 802.3 50 Gb/s Ethernet over a single lane and next generation 100 Gb/s and 200 Gb/s Ethernet Study Group
and 200 Gb/s Ethernet single-mode fiber Study Group closing report
Attachment B29
IEEE 802.3 25 Gb/s Ethernet PMD(s) for Single Mode Fiber Study Group opening report
Attachment B30
IEEE 802.3 25 Gb/s Ethernet PMD(s) for Single Mode Fiber Study Group closing report
Attachment B31
Industry Connections Next Generation Enterprise/Campus/Data Center Ethernet opening report
Attachment B32
Industry Connections Next Generation Enterprise/Campus/Data Center Ethernet closing report
Attachment B33
Call for interest: Ethernet YANG models opening report
Attachment B34
Call for interest: Ethernet YANG models closing report
Liaison Attachments (External and Internal)
Attachment C1
ISO/IEC SC25/WG3 report to IEEE 802.3
Attachment C2
TIA TR-42 Liaison Report to IEEE 802.3
Attachment C3
ITU-T SG9 to IEEE 802.3 regarding three new ITU-T Recommendations
Attachment 1
(Password protected)
Attachment 2
(Password protected)
Attachment 3
(Password protected)
Attachment C4
OIF to IEEE 802.3 on Flex Ethernet Implementation Agreement
Attachment
(Password protected)
Attachment C5
TIA TR-42 to IEEE 802.3 regarding ANSI/TIA-PN-1005-A-3
Attachment C6
TIA TR-42 to IEEE P802.3bt on TSB-184-A Draft 5.1
Attachment
(Password protected)
Attachment C7
TIA TR-42 to IEEE P802.3bz on TSB-5021 Draft 0.6b
Attachment
(Password protected)
Attachment C8
ITU-T SG15 to IEEE 802.3 on OTNT standardization work plan
Attachment
(Password protected)
Attachment C9
ITU-T SG15 to IEEE 802.3 on ANT standards overview and work plan
Attachment C10
ITU-T SG15 to IEEE 802.3 on HNT standards overview and work plan
Attachment C11
ITU-T SG15 to IEEE 802.3 reply on ANT and HNT standards overview and work plans
Attachment C12
ISO/IEC JTC1 SC25 to IEEE P802.3bv on POF
Attachment C13
ISO/IEC JTC1 SC25 to IEEE 802.3 on remote powering
Attachment
(Password protected)
Attachment C14
ISO/IEC JTC1 SC25 to IEEE P802.3bz on 2.5GBASE-T and 5GBASE-T
Attachment
(Password protected)
Attachment C15
ISO/IEC JTC1 SC25 to IEEE P802.3bq on 25GBASE-T
Attachment
(Password protected)
Attachment C16
ISO/IEC JTC1 SC25 to IEEE 802.11 on Wireless Access Points
Attachment C17
DRAFT liaison response to ITU-T SG15 on timestamping
Attachment C18
DRAFT liaison response to ITU-T SG9 on draft new Recommendations
Attachment C19
DRAFT liaison response to ISO/IEC JTC1/SC25 WG3 on cabling to support 25GBASE-T
Attachment C20
DRAFT liaison response to OIF on Flex Ethernet
Attachment C21
DRAFT liaison response to ISO/IEC JTC1/SC25 WG3 on PoE
DRAFT Attachment
Attachment C22
Liaison response to ITU-T SG15 on timestamping
Attachment C23
Liaison response to ITU-T SG9 on draft new Recommendations
Attachment C24
Liaison response to ISO/IEC JTC1/SC25 WG3 on cabling to support 25GBASE-T
Attached informal communication
Attachment C25
Liaison response to OIF on Flex Ethernet
Attachment C26
Liaison response to ISO/IEC JTC1/SC25 WG3 on PoE
Return to IEEE 802.3 Minutes page
Last Update: 8-Aug 2016