Administrative attachments |
|
Attachment A1 |
|
IEEE 802.3 Opening agenda |
|
Attachment A2 |
|
IEEE 802.3 Closing agenda |
|
Attachment A3 |
|
IEEE 802.3 Opening report |
|
Attachment A4 |
|
IEEE 802.3 Closing report |
|
Attachment A5 |
|
IEEE 802.3 Meeting attendance procedures |
|
Attachment A6 |
|
IEEE 802.3 Voting member list |
|
Attachment A7 |
|
IEEE 802.3 Potential voter list |
|
Attachment A8 |
|
IEEE 802.3 Voters in peril |
|
Attachment A9 |
|
IEEE 802.3 Attendance credit summary, November 2015 to February 2017 |
|
Attachment A10 |
|
IEEE 802.3 Attendance list Vancouver |
|
Attachment A11 |
|
IEEE 802.3 Treasury Report |
|
Attachment A12 |
|
IEEE 802.3 Standards status |
|
Attachment A13 |
|
IEEE 802.3 Future meetings closing report,
May 2017 reminder |
|
Attachment A14 |
|
IEEE 802.3 Rules opening report |
|
Attachment A15 |
|
IEEE 802.3 Rules closing report |
|
Task Force and Study Group attachments |
|
Attachment B1 |
|
IEEE 802.3 Maintenance opening report |
|
Attachment B2 |
|
IEEE 802.3 Maintenance closing report |
|
Attachment B3 |
|
IEEE P802.3bs 200 Gb/s and 400 Gb/s Ethernet Task Force opening report |
|
Attachment B4 |
|
IEEE P802.3bs 200 Gb/s and 400 Gb/s Ethernet Task Force closing report |
|
Attachment B5 |
|
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force opening report |
|
Attachment B6 |
|
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force closing report |
|
Attachment B7 |
|
IEEE P802.3bv Gigabit Plastic Optical Fiber (GPOF) Task Force opening report |
|
Attachment B8 |
|
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force opening report |
|
Attachment B9 |
|
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force closing report |
|
Attachment B10 |
|
IEEE P802.3cb 2.5 Gb/s and 5 Gb/s Backplane Task Force opening report |
|
Attachment B11 |
|
IEEE P802.3cb 2.5 Gb/s and 5 Gb/s Backplane Task Force closing report |
|
Attachment B12 |
|
IEEE P802.3cc 25 Gb/s Ethernet over single-mode fiber Task Force opening report |
|
Attachment B13 |
|
IEEE P802.3cc 25 Gb/s Ethernet over single-mode fiber Task Force closing report |
|
Attachment B14 |
|
IEEE P802.3cd 50Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force opening report |
|
Attachment B15 |
|
IEEE P802.3cd 50Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force closing report |
|
Attachment B16 |
|
IEEE P802.3.2 (IEEE 802.3cf) YANG data models Task Force opening report |
|
Attachment B17 |
|
IEEE P802.3.2 (IEEE 802.3cf) YANG data models Task Force closing report |
|
Attachment B18 |
|
IEEE P802.3cg 10 Mb/s single twisted pair Ethernet Task Force opening report |
|
Attachment B19 |
|
IEEE P802.3cg 10 Mb/s single twisted pair Ethernet Task Force closing report |
|
Attachment B20 |
|
IEEE 802.3 Multi-Gig Automotive Ethernet PHY Study Group opening report |
|
Attachment B21 |
|
IEEE 802.3 Multi-Gig Automotive Ethernet PHY Study Group closing report |
|
Attachment B22 |
|
Industry Connections New Ethernet Applications opening report |
|
Attachment B23 |
|
Industry Connections New Ethernet Applications closing report |
|
Attachment B24 |
|
PARs Ad Hoc closing report |
|
Liaison Attachments (External and Internal) |
|
Attachment C1 |
|
ISO/IEC SC25/WG3 report to IEEE 802.3 |
|
Attachment C2 |
|
TIA TR-42 Liaison Report to IEEE 802.3 |
|
Attachment C3 |
|
ODVA Liaison Report to IEEE 802.3 |
|
Attachment C4 |
|
ITU-T Focus Group IMT-2020 to IEEE 802.3 on non-radio aspects of 5G
|
|
Attachment C5 |
|
ISO/IEC JTC1 SC25 to IEEE 802.3 on 1-pair cabling
|
|
Attachment C6 |
|
JEDEC JESD204C Task Group to IEEE 802.3 on referencing COM
|
|
Attachment C7 |
|
TIA TR-42 to IEEE 802.3 regarding single-pair Ethernet
Attachment (Password protected)
|
|
Attachment C8 |
|
OIF to IEEE P802.3bs and P802.3cd regarding progress on OIF CEI-56G-VSR-PAM4 project
Attachment (Password protected)
|
|
Attachment C9 |
|
MEF to IEEE 802.3 on Layer 1 Connectivity Services
|
|
Attachment C10 |
|
ITU-T SG15 to IEEE P802.3ca on on wavelength plans and coexistence requirements
|
|
Attachment C11 |
|
ITU-T SG13 to IEEE 802.3 on "Report on standard gap analysis"
Attachment 1 (Password protected)
Attachment 2 (Password protected)
|
|
Attachment C12 |
|
DRAFT liaison response to the JEDEC JESD204C Task Group on Copyright
|
|
Attachment C13 |
|
DRAFT liaison response to ISO/IEC JTC1 SC 6 on amendment comments
|
|
Attachment C14 |
|
DRAFT liaison response to ISO/IEC JTC1 SC 6 on IEEE Std 802.3-2015 comments
|
|
Attachment C15 |
|
DRAFT liaison response to OIF on P802.3bs progress
|
|
Attachment C16 |
|
DRAFT liaison to INCITS T11.2 on P802.3bs progress
|
|
Attachment C17 |
|
DRAFT liaison to ITU-T SG15 on P802.3bs progress
|
|
Attachment C18 |
|
DRAFT liaison response to OIF on P802.3cd progress
|
|
Attachment C19 |
|
DRAFT liaison response to TIA TR42 on single-pair Ethernet
|
|
Attachment C20 |
|
DRAFT liaison response to ISO/IEC SC25 WG3 on single-pair applications
|
|
Attachment C21 |
|
Liaison response to the JEDEC JESD204C Task Group on Copyright
|
|
Attachment C22 |
|
Liaison response to ISO/IEC JTC1 SC 6 on amendment comments
|
|
Attachment C23 |
|
Liaison response to ISO/IEC JTC1 SC 6 on IEEE Std 802.3-2015 comments
|
|
Attachment C24 |
|
Liaison response to OIF on P802.3bs progress
|
|
Attachment C25 |
|
Liaison to INCITS T11.2 on P802.3bs progress
|
|
Attachment C26 |
|
Liaison to ITU-T SG15 on P802.3bs progress
|
|
Attachment C27 |
|
Liaison response to OIF on P802.3cd progress
|
|
Attachment C28 |
|
Liaison response to TIA TR42 on single-pair Ethernet
|
|
Attachment C29 |
|
Liaison response to ISO/IEC SC25 WG3 on single-pair applications
|