Administrative attachments |
|
Attachment A1 |
|
IEEE 802.3 Opening agenda |
|
Attachment A2 |
|
IEEE 802.3 Closing agenda |
|
Attachment A3 |
|
IEEE 802.3 Opening report |
|
Attachment A4 |
|
IEEE 802.3 Closing report |
|
Attachment A5 |
|
IEEE 802.3 Meeting attendance procedures |
|
Attachment A6 |
|
IEEE 802.3 Voters list |
|
Attachment A7 |
|
IEEE 802.3 Membership list |
|
Attachment A8 |
|
IEEE 802.3 Potential voter list |
|
Attachment A9 |
|
IEEE 802.3 Voters in peril |
|
Attachment A10 |
|
IEEE 802.3 Attendance credit summary, November 2017 to February 2019 |
|
Attachment A11 |
|
IEEE 802.3 Attendance list Milpitas |
|
Attachment A12 |
|
IEEE 802.3 Attendance list Vancouver |
|
Attachment A13 |
|
IEEE 802.3 Treasury Report |
|
Attachment A14 |
|
IEEE 802.3 Future meetings closing report,  
May 2019 update,  
Sep 2019 update,  
Jan 2020 offer  
|
|
Attachment A15 |
|
IEEE 802.3 Rules opening report |
|
Attachment A16 |
|
IEEE 802.3 Rules closing report |
|
Attachment A17 |
|
IEEE 802.3 PARs Ad Hoc report |
|
Task Force and Study Group attachments |
|
Attachment B1 |
|
IEEE 802.3 Maintenance opening report |
|
Attachment B2 |
|
IEEE 802.3 Maintenance closing report |
|
Attachment B3 |
|
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force opening report |
|
Attachment B4 |
|
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force closing report |
|
Attachment B5 |
|
IEEE P802.3.2 (IEEE 802.3cf) YANG data models Task Force opening report |
|
Attachment B6 |
|
IEEE P802.3.2 (IEEE 802.3cf) YANG data models Task Force closing report |
|
Attachment B7 |
|
IEEE P802.3cg 10 Mb/s Single Twisted Pair Ethernet Task Force opening report |
|
Attachment B8 |
|
IEEE P802.3cg 10 Mb/s Single Twisted Pair Ethernet Task Force closing report |
|
Attachment B9 |
|
IEEE P802.3ch Multi-Gig Automotive Ethernet PHY Task Force opening report |
|
Attachment B10 |
|
IEEE P802.3ch Multi-Gig Automotive Ethernet PHY Task Force closing report |
|
Attachment B11 |
|
IEEE P802.3ck 100 Gb/s, 200 Gb/s, and 400 Gb/s Electrical Interfaces Task Force opening report |
|
Attachment B12 |
|
IEEE P802.3ck 100 Gb/s, 200 Gb/s, and 400 Gb/s Electrical Interfaces Task Force closing report |
|
Attachment B13 |
|
IEEE P802.3cm 400 Gb/s over Multimode Fiber Task Force opening report |
|
Attachment B14 |
|
IEEE P802.3cm 400 Gb/s over Multimode Fiber Task Force closing report |
|
Attachment B15 |
|
IEEE P802.3cn 50 Gb/s, 200 Gb/s, and 400 Gb/s over SMF Task Force opening report |
|
Attachment B16 |
|
IEEE P802.3cn 50 Gb/s, 200 Gb/s, and 400 Gb/s over SMF Task Force closing report |
|
Attachment B17 |
|
IEEE P802.3cp Bidirectional 10 Gb/s, 25 Gb/s and 50 Gb/s Optical Access PHYs Task Force opening report |
|
Attachment B18 |
|
IEEE P802.3cp Bidirectional 10 Gb/s, 25 Gb/s and 50 Gb/s Optical Access PHYs Task Force closing report |
|
Attachment B19 |
|
IEEE P802.3cq Power over Ethernet over 2 Pairs (Maintenance #13) Task Force opening report |
|
Attachment B20 |
|
IEEE P802.3cq Power over Ethernet over 2 Pairs (Maintenance #13) Task Force closing report |
|
Attachment B21 |
|
IEEE P802.3cr Isolation (Maintenance #14) Task Force opening report |
|
Attachment B22 |
|
IEEE P802.3cs Increased-reach Ethernet optical subscriber access (Super-PON) Task Force opening report |
|
Attachment B23 |
|
IEEE P802.3cs Increased-reach Ethernet optical subscriber access (Super-PON) Task Force closing report |
|
Attachment B24 |
|
IEEE P802.3ct 100 Gb/s and 400 Gb/s over DWDM systems Task Force opening report |
|
Attachment B25 |
|
IEEE P802.3ct 100 Gb/s and 400 Gb/s over DWDM systems Task Force closing report |
|
Attachment B26 |
|
IEEE 802.3 100 Gb/s per lane optical PHYs Study Group opening report |
|
Attachment B27 |
|
IEEE 802.3 100 Gb/s per lane optical PHYs Study Group closing report |
|
Attachment B28 |
|
Industry Connections New Ethernet Applications opening report |
|
Attachment B29 |
|
Industry Connections New Ethernet Applications closing report |
|
Attachment B30 |
|
Call for interest: Automotive Ethernet, Beyond 10 Gb/s Electrical PHYs opening report |
|
Attachment B31 |
|
Call for interest: Automotive Ethernet, Beyond 10 Gb/s Electrical PHYs closing report |
|
Liaison Attachments (External and Internal) |
|
Attachment C1 |
|
ISO/IEC SC25/WG3 report to IEEE 802.3 |
|
Attachment C2 |
|
TIA TR-42 Liaison Report to IEEE 802.3 |
|
Attachment C3 |
|
IEEE 802.21 request for input on VR network requirements |
|
Attachment C4 |
|
ITU-T SG15 to IEEE 802.3 on coordination of Ethernet information and data modelling work
Attachment 1 (Password protected)
Attachment 2 (Password protected)
|
|
Attachment C5 |
|
OIF to IEEE 802.3 regarding progress on the 400ZR Interop Project
Attachment (Password protected)
|
|
Attachment C6 |
|
Ethernet Alliance to IEEE 802.3 on the formation of the Single Pair Ethernet Technical Subcommittee
|
|
Attachment C7 |
|
DRAFT liaison to the Ethernet Alliance on the status of the P802.3cg draft
|
|
Attachment C8 |
|
DRAFT liaison to ITU-T SG15 on coordination of bidirectional optical for access
|
|
Attachment C9 |
|
DRAFT liaison to ITU-T SG15 requesting spectral excursion test results
|
|
Attachment C10 |
|
DRAFT liaison response to the OIF regarding the 400ZR Interop Project
|
|
Attachment C11 |
|
Liaison to the Ethernet Alliance on the status of the P802.3cg draft
|
|
Attachment C12 |
|
Liaison to ITU-T SG15 on coordination of bidirectional optical for access
|
|
Attachment C13 |
|
Liaison to ITU-T SG15 requesting spectral excursion test results
|
|
Attachment C14 |
|
Liaison response to the OIF regarding the 400ZR Interop Project
|