Administrative attachments |
|
Attachment A1 |
|
IEEE 802.3 Opening agenda |
|
Attachment A2 |
|
IEEE 802.3 Mid-session agenda |
|
Attachment A3 |
|
IEEE 802.3 Closing agenda |
|
Attachment A4 |
|
IEEE 802.3 Opening report |
|
Attachment A5 |
|
IEEE 802.3 Mid-session report |
|
Attachment A6 |
|
IEEE 802.3 Closing report |
|
Attachment A7 |
|
IEEE 802.3 Meeting attendance procedures |
|
Attachment A8 |
|
IEEE 802.3 Voters list |
|
Attachment A9 |
|
IEEE 802.3 Membership list |
|
Attachment A10 |
|
IEEE 802.3 Potential voter list |
|
Attachment A11 |
|
IEEE 802.3 Voters in peril |
|
Attachment A12 |
|
IEEE 802.3 Attendance credit summary, July 2019 to January 2021 |
|
Attachment A13 |
|
IEEE 802.3 Attendance list March 2021 Plenary Teleconference |
|
Attachment A14 |
|
IEEE 802.3 Treasury Report |
|
Attachment A15 |
|
IEEE 802.3 Future meetings closing report
|
|
Attachment A16 |
|
IEEE 802 EC Report
|
|
Attachment A17 |
|
TIA TR42 Report to IEEE 802.3
|
|
Attachment A18 |
|
ISO/IEC SG25 WG3 Report to IEEE 802.3
|
|
Task Force and Study Group attachments |
|
Attachment B1 |
|
IEEE 802.3 Maintenance opening report |
|
Attachment B2 |
|
IEEE 802.3 Maintenance closing report |
|
Attachment B3 |
|
IEEE P802.3ck 100 Gb/s, 200 Gb/s, and 400 Gb/s Electrical Interfaces Task Force opening report |
|
Attachment B4 |
|
IEEE P802.3ck 100 Gb/s, 200 Gb/s, and 400 Gb/s Electrical Interfaces Task Force closing report |
|
Attachment B5 |
|
IEEE P802.3cp Bidirectional 10 Gb/s, 25 Gb/s, and 50 Gb/s Optical Access PHYs Task Force opening report |
|
Attachment B6 |
|
IEEE P802.3cp Bidirectional 10 Gb/s, 25 Gb/s, and 50 Gb/s Optical Access PHYs Task Force closing report |
|
Attachment B7 |
|
IEEE P802.3cr Isolation (Maintenance #14) Task Force opening report |
|
Attachment B8 |
|
IEEE P802.3cs Increased-reach Ethernet optical subscriber access (Super-PON) Task Force opening report |
|
Attachment B9 |
|
IEEE P802.3cs Increased-reach Ethernet optical subscriber access (Super-PON) Task Force closing report |
|
Attachment B10 |
|
IEEE P802.3ct/cw Joint Task Force opening report |
|
Attachment B11 |
|
IEEE P802.3ct/cw Joint Task Force mid-session report |
|
Attachment B12 |
|
IEEE P802.3cu 100 Gb/s and 400 Gb/s over SMF at 100 Gb/s per wavelength Task Force opening report |
|
Attachment B13 |
|
IEEE P802.3cv Maintenance #15: Power over Ethernet Task Force opening report |
|
Attachment B14 |
|
IEEE P802.3cv Maintenance #15: Power over Ethernet Task Force closing report |
|
Attachment B15 |
|
IEEE P802.3cx Improved PTP timestamping accuracy Task Force opening report |
|
Attachment B16 |
|
IEEE P802.3cy Greater than 10 Gb/s Electrical Automotive Ethernet Task Force opening report |
|
Attachment B17 |
|
IEEE P802.3cz Multi-Gigabit Optical Automotive Ethernet Task Force opening report |
|
Attachment B18 |
|
IEEE P802.3da 10 Mb/s Single Pair Multidrop Segments Enhancement Task Force opening report |
|
Attachment B19 |
|
IEEE P802.3db 100 Gb/s, 200 Gb/s, and 400 Gb/s Short Reach Fiber Task Force opening report |
|
Attachment B20 |
|
IEEE Beyond 400 Gb/s Ethernet Study Group report |
|
Attachment B21 |
|
IEEE Beyond 400 Gb/s Ethernet Study Group closing report |
|
Attachment B22 |
|
Industry Connections New Ethernet Applications report |
|
Attachment B23 |
|
PDCC Ad Hoc opening report |
|
Attachment B24 |
|
Enhancements to Single Pair Ethernet CFI opening report |
|
Attachment B25 |
|
Enhancements to Single Pair Ethernet CFI presentation |
|
Attachment B26 |
|
Enhancements to Single Pair Ethernet closing report |
|
Liaison Attachments (External and Internal) |
|
|
Attachment C1 |
|
TIA to IEEE 802.3 Liaison of TIA‐568.5 Balanced Single Twisted‐Pair Telecommunications Cabling and Components Standard Draft 1.6
Attachment (Password protected) |
|
|
Attachment C2 |
|
OIF to IEEE 802.3 Liaison on status of 400ZR IA maintenance project
|
|
Attachment C3 |
|
Draft: IEEE 802.3 to ITU-T SG15 on ANT Standardization Plan
|
|
Attachment C4 |
|
Draft: IEEE 802.3 to ITU-T SG15 on HNT Standardization Plan
|
|
Attachment C5 |
|
Draft: IEEE 802.3 to ITU-T SG15 on OTNT Standardization Plan
|
|
Attachment C6 |
|
Draft: IEEE 802.3 to ITU-T SG5 on comment to ITU-T K.147
|
|
Attachment C7 |
|
Draft: IEEE 802.3 contribution to ITU-T SG5 on ITU-T K.147 (password protected)
|
|
Attachment C8 |
|
Draft: IEEE 802.3 to ITU-T SG15 and Cablelabs on the status of P802.3ct
|
|
Attachment C9 |
|
Draft: IEEE 802.3 to ITU-T SG15 on the progress of P802.3cw
|
|
Attachment C10 |
|
Draft: Liaison response from IEEE 802.3 to OIF "400ZR IA Maintenance Project"
|
|
Attachment C11 |
|
Draft: IEEE 802.3 to INCITS T11.2 on the status of P802.3ck
|
|
Attachment C12 |
|
Draft: IEEE 802.3 to COBO on the status of P802.3ck
|
|
Attachment C13 |
|
Draft: IEEE 802.3 to Gen-Z on the status of P802.3ck"
|
|
Attachment C14 |
|
Draft: IEEE 802.3 to OIF CEI-112G on the status of P802.3ck"
|
|
Attachment C15 |
|
Draft: IEEE 802.3 to ITU-T Q2 SG15 on coordination with project G.9807.3
|
|
Attachment C16 |
|
Draft: IEEE 802.3 to ITU-T Q13 SG15 on the status of P802.3cx
|
|
Attachment C17 |
|
Draft: IEEE 802.3 to INCITS T11.2 on the status of P802.3db
|
|
|
Attachment C18 |
|
IEEE 802.3 to INCITS T11.2 on the status of P802.3db
|
|
|
Attachment C19 |
|
IEEE 802.3 to INCITS T11.2 on the status of P802.3ck
|
|
Attachment C20 |
|
IEEE 802.3 to COBO on the status of P802.3ck
|
|
Attachment C21 |
|
IEEE 802.3 to Gen-Z on the status of P802.3ck"
|
|
Attachment C22 |
|
IEEE 802.3 to OIF CEI-112G on the status of P802.3ck"
|
|
Attachment C23 |
|
IEEE 802.3 to ITU-T SG15 on ANT Standardization Plan
|
|
Attachment C24 |
|
IEEE 802.3 to ITU-T SG15 on HNT Standardization Plan
|
|
Attachment C25 |
|
IEEE 802.3 to ITU-T SG15 on OTNT Standardization Plan
|
|
Attachment C26 |
|
IEEE 802.3 to ITU-T Q2 SG15 on coordination with project G.9807.3
|
|
Attachment C27 |
|
IEEE 802.3 to ITU-T SG5 on comment to ITU-T K.147
|
|
Attachment C27 |
|
IEEE 802.3 to ITU-T SG5 on comment to ITU-T K.147
|
|
Attachment C28 |
|
IEEE 802.3 to ITU-T SG5 on contribution to ITU-T K.147
Attachment 1 (Compare) (Password protected)
Attachment 2 (Clean) (Password protected) |
|
|
Attachment C29 |
|
IEEE 802.3 to ITU-T SG15 and Cablelabs on the status of P802.3ct
|
|
Attachment C30 |
|
IEEE 802.3 to ITU-T SG15 on the progress of P802.3cw
|
|
Attachment C31 |
|
Liaison response from IEEE 802.3 to OIF "400ZR IA Maintenance Project"
|
|
Attachment C32 |
|
IEEE 802.3 to ITU-T Q13 SG15 on the status of P802.3cx
|