IEEE 802.3 May 2019 Interim Minutes

23 May, 2019
Salt Lake City, UT, USA





Minutes

Approved Minutes, IEEE 802.3 Ethernet Working Group Interim, Salt Lake City, 23 May, 2019


Administrative attachments

Attachment A1
IEEE 802.3 Interim agenda

Attachment A2
IEEE 802.3 Interim slides

Attachment A3
IEEE 802.3 Voting member list

Attachment A4
IEEE 802.3 Membership list

Attachment A5
Working Group meeting attendance list

Attachment A6
IEEE 802.3 Attendance list Salt Lake City

Attachment A7
IEEE 802.3 Attendance list Warren

Task Force and Study Group attachments

Attachment B1
IEEE P802.3ca 25 Gb/s and 50 Gb/s Ethernet Passive Optical Networks Task Force report

Attachment B2
IEEE P802.3ch Multi-Gig Automotive Ethernet PHY Task Force report

Attachment B3
IEEE 802.3 IEEE SCC18 Ad Hoc report

Liaison Attachments (External and Internal)

Attachment C1
ISO/IEC JTC1 SC25 to IEEE 802.3 on single pair cabling

Attachment C2
ISO/IEC JTC1 SC25 to IEEE 802.3 on ISO/IEC TR 11801-9909

Attachment C3

3GPP to IEEE 802 on RoHC utilization for Ethernet header compression
Attachment 1 (Password protected)
Attachment 2 (Password protected)

Attachment C4

OIF to IEEE 802.3 regarding progress on OIF CEI-112G-VSR and CEI-112G-LR projects
Attachment (Password protected)


Attachment C5
ITU-T SG15 to IEEE 802.3 on test results for spectral excursion

Attachment C6
3GPP to IEEE 802 on update to RoHC utilization for Ethernet header compression

Attachment C7

ODCC to IEEE 802.3 on next generation Ethernet connections for datacenter networks
Attachment

Attachment C8

OIF to IEEE 802.3 regarding progress on the OIF 400ZR project
Attachment (Password protected)


Attachment C9
DRAFT liaison response to ITU-T SG15 on the ANT workplan

Attachment C10
DRAFT liaison response to ITU-T SG15 on the HNT workplan

Attachment C11
DRAFT liaison response to ITU-T SG15 on the OTNT workplan

Attachment C12
DRAFT liaison response to 3GPP on Ethernet header compression

Attachment C13
DRAFT liaison response to ODCC on Next Generation Ethernet connections for datacenter networks

Attachment C14
DRAFT liaison response to ISO/IEC JTC 1/SC 6 on China NB comments

Attachment C15
DRAFT liaison to ISO/IEC JTC 1/SC 6 on availability of IEEE P802.3cg draft

Attachment C16
DRAFT liaison to ISO/IEC SC25 WG3 on the status of IEEE P802.3cg project

Attachment C17
DRAFT liaison to TIA TR42 on the status of IEEE P802.3cg project

Attachment C18
DRAFT liaison to IEEE P370 on the status of IEEE P802.3ch and P802.3ck projects

Attachment C19
DRAFT liaison to INCITS T11.2 on the status of IEEE P802.3cm project

Attachment C20
DRAFT liaison to IEC concerning IEC 60793-2-50 2018

Attachment C21
DRAFT liaison to IEEE SCC18 on support for Tentative Interim Amendments to NFPA 70 2020

Attachment C22
Liaison response to ITU-T SG15 on the ANT workplan

Attachment C23
Liaison response to ITU-T SG15 on the HNT workplan

Attachment C24
Liaison response to ITU-T SG15 on the OTNT workplan

Attachment C25
Liaison response to 3GPP on Ethernet header compression

Attachment C26
Liaison response to ODCC on Next Generation Ethernet connections for datacenter networks

Attachment C27
Liaison response to ISO/IEC JTC 1/SC 6 on China NB comments

Attachment C28
Liaison to ISO/IEC JTC 1/SC 6 on availability of IEEE P802.3cg draft

Attachment C29
Liaison to ISO/IEC SC25 WG3 on the status of IEEE P802.3cg project

Attachment C30
Liaison to TIA TR42 on the status of IEEE P802.3cg project

Attachment C31
Liaison to IEEE P370 on the status of IEEE P802.3ch and P802.3ck projects

Attachment C32
Liaison to INCITS T11.2 on the status of IEEE P802.3cm project

Attachment C33
Liaison to IEC concerning IEC 60793-2-50 2018 - not sent (overtaken by events)

Attachment C34
Liaison to IEEE SCC18 on support for Tentative Interim Amendments to NFPA 70 2020


Return to IEEE 802.3 Minutes page
Last Update: 15-Jul 2019


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]