IEEE 802.3 November 2012 Plenary Minutes

November 12-15, 2012
San Antonio, TX, USA



Minutes

Approved Minutes, IEEE 802.3 Ethernet Working Group PLENARY, San Antonio, TX, November 12-15, 2012


Administrative attachments

Attachment A1
IEEE 802.3 Opening agenda

Attachment A2
IEEE 802.3 Closing agenda

Attachment A3
IEEE 802.3 Opening report

Attachment A4
IEEE 802.3 Closing report

Attachment A5
IEEE 802.3 Meeting attendance procedures

Attachment A6
IEEE 802.3 Voting member list

Attachment A7
IEEE 802.3 Potential voter list

Attachment A8
IEEE 802.3 Voters in peril

Attachment A9
IEEE 802.3 Attendance credit summary, July 2011 to October 2012

Attachment A10
IEEE 802.3 Attendance list

Attachment A11
IEEE 802.3 Treasury Report

Attachment A12
IEEE 802.3 Standards status

Attachment A13
IEEE 802.3 Future meetings opening report

Attachment A14
IEEE 802.3 Future meetings closing report

Attachment A15
IEEE 802.3 January 2013 Interim Session in Pheonix, AZ hosted by Luxtera

Attachment A16
IEEE 802.1 and IEEE 802.3 May 2013 Joint Interim Session in Victoria, BC hosted by Ethernet Alliance

Attachment A17
Proposal for IEEE 802.1 and IEEE 802.3 September 2013 Joint Interim Session in York, UK hosted by ADVA Optical Networking

Attachment A18
IEEE 802.3 Room assignments

Attachment A19
IEEE 802.3 contribution to IEEE 802.24 tutorial

Attachment A20
OUI Registry Tiers proposal

Attachment A21
IEEE 802.24 liaison report

Attachment A22
IEEE 802.3 comments regarding proposed changes to the 5 Criteria

Task Force and Study Group attachments

Attachment B1
IEEE 802.3 Maintenance opening report

Attachment B2
IEEE 802.3 Maintenance closing report

Attachment B3
IEEE P802.3.1 (IEEE 802.3.1a) Ethernet MIBs (revision) Task Force closing report

Attachment B4
IEEE P802.3bj 100 Gb/s Backplane and Copper Cable Task Force opening report

Attachment B5
IEEE P802.3bj 100 Gb/s Backplane and Copper Cable Task Force closing report

Attachment B6
IEEE P802.3bk Extended EPON Task Force opening report

Attachment B7
IEEE P802.3bk Extended EPON Task Force closing report

Attachment B8
IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables Task Force opening report

Attachment B9
IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables Task Force closing report

Attachment B10
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force opening report

Attachment B11
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force closing report

Attachment B12
IEEE 802.3 Reduced Twisted Pair Gigabit Ethernet (RTPGE) Study Group opening report

Attachment B13
IEEE 802.3 Reduced Twisted Pair Gigabit Ethernet (RTPGE) Study Group closing report

Attachment B14
IEEE 802.3 Next Generation BASE-T Study Group opening report

Attachment B15
IEEE 802.3 Next Generation BASE-T Study Group closing report

Attachment B16
IEEE 802.3 Higher Speed Ethernet consensus industry connection activity opening report

Attachment B17
IEEE 802.3 Higher Speed Ethernet consensus industry connection activity closing report

Attachment B18
Call for interest: Distinguished minimum latency traffic in a converged traffic environment opening report

Attachment B19
Call for interest: Distinguished minimum latency traffic in a converged traffic environment closing report

Liaison Attachments (External and Internal)

Attachment C1
ISO/IEC SC25/WG3 report to IEEE 802.3

Attachment C2
TIA TR-42 Liaison Report to IEEE 802.3

Attachment C3
Liaison from Broadband Forum to IEEE 802 regarding WT-304 Broadband Service Attributes and Performance Metrics

Attachment C4
ISO/IEC SC 25/WG3 regarding 40 Gb/s cabling systems

Attachment C5
ITU-T SG15 New versions of the Access Network Transport (ANT) Standardization Plan and Work Plan

Attachment C6
ITU-T SG15 Optical Transport Networks & Technologies (OTNT) Standardization Work Plan
Attachment (Password protected)

Attachment C7
OIF CEI-28G-VSR Project
Attachment (Password protected)

Attachment C8
OIF Multi-link Gearbox (MLG) 2.0 Project
Attachment (Password protected)

Attachment C9
TR-42 Liaison to IEEE 802.3 Working Group
Attachment 1 (Password protected)
Attachment 2 (Password protected)

Attachment C10
Deutsche Kommission Elektrotechnik (DKE) Liaison to IEEE 802.3 Working Group

Attachment C11
Draft liaison response from IEEE 802.3 to OIF regarding the Multi-link Gearbox (MLG) 2.0 Project

Attachment C12
Draft liaison response from IEEE 802.3 to TIA TR-42

Attachment C13
Draft liaison response from IEEE 802.3 to ISO/IEC SC 25/WG3 regarding 40 Gb/s cabling systems

Attachment C14
Liaison response from IEEE 802.3 to OIF regarding the Multi-link Gearbox (MLG) 2.0 Project

Attachment C15
Liaison response from IEEE 802.3 to TIA TR-42

Attachment C16
Liaison response from IEEE 802.3 to ISO/IEC SC 25/WG3 regarding 40 Gb/s cabling systems

Other Attachments

Attachment D1
Letter from Elizabeth Kochuparambil, Cisco Systems, Inc, regarding donation to IEEE 802.3 Working Group

Attachment D2
Draft letter from IEEE 802.3 to Elizabeth Kochuparambil, Cisco Systems, Inc, regarding donation to IEEE 802.3 Working Group

Attachment D3
Letter from IEEE 802.3 to Elizabeth Kochuparambil, Cisco Systems, Inc, regarding donation to IEEE 802.3 Working Group


Return to IEEE 802.3 Minutes page
Last Update: 28 Apr 14


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]