Administrative attachments |
|
Attachment A1 |
|
IEEE 802.3 Opening agenda |
|
Attachment A2 |
|
IEEE 802.3 Closing agenda |
|
Attachment A3 |
|
IEEE 802.3 Opening report |
|
Attachment A4 |
|
IEEE 802.3 Closing report |
|
Attachment A5 |
|
IEEE 802.3 Meeting attendance procedures |
|
Attachment A6 |
|
IEEE 802.3 Voting member list |
|
Attachment A7 |
|
IEEE 802.3 Potential voter list |
|
Attachment A8 |
|
IEEE 802.3 Voters in peril |
|
Attachment A9 |
|
IEEE 802.3 Attendance credit summary, July 2011 to
October 2012 |
|
Attachment A10 |
|
IEEE 802.3 Attendance list |
|
Attachment A11 |
|
IEEE 802.3 Treasury Report |
|
Attachment A12 |
|
IEEE 802.3 Standards status |
|
Attachment A13 |
|
IEEE 802.3 Future meetings opening report |
|
Attachment A14 |
|
IEEE 802.3 Future meetings closing report |
|
Attachment A15 |
|
IEEE 802.3 January 2013 Interim Session in Pheonix, AZ hosted by Luxtera |
|
Attachment A16 |
|
IEEE 802.1 and IEEE 802.3 May 2013 Joint Interim Session in Victoria, BC hosted by Ethernet Alliance |
|
Attachment A17 |
|
Proposal for IEEE 802.1 and IEEE 802.3 September 2013 Joint Interim Session in York, UK hosted by ADVA Optical Networking |
|
Attachment A18 |
|
IEEE 802.3 Room assignments |
|
Attachment A19 |
|
IEEE 802.3 contribution to IEEE 802.24 tutorial |
|
Attachment A20 |
|
OUI Registry Tiers proposal |
|
Attachment A21 |
|
IEEE 802.24 liaison report |
|
Attachment A22 |
|
IEEE 802.3 comments regarding proposed changes to the 5 Criteria |
|
Task Force and Study Group attachments |
|
Attachment B1 |
|
IEEE 802.3 Maintenance opening report |
|
Attachment B2 |
|
IEEE 802.3 Maintenance closing report |
|
Attachment B3 |
|
IEEE P802.3.1 (IEEE 802.3.1a) Ethernet MIBs (revision) Task Force closing report |
|
Attachment B4 |
|
IEEE P802.3bj 100 Gb/s Backplane and Copper Cable Task Force opening report |
|
Attachment B5 |
|
IEEE P802.3bj 100 Gb/s Backplane and Copper Cable Task Force closing report |
|
Attachment B6 |
|
IEEE P802.3bk Extended EPON Task Force opening report |
|
Attachment B7 |
|
IEEE P802.3bk Extended EPON Task Force closing report |
|
Attachment B8 |
|
IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables Task Force opening report |
|
Attachment B9 |
|
IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables Task Force closing report |
|
Attachment B10 |
|
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force opening report |
|
Attachment B11 |
|
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force closing report |
|
Attachment B12 |
|
IEEE 802.3 Reduced Twisted Pair Gigabit Ethernet (RTPGE) Study Group opening report |
|
Attachment B13 |
|
IEEE 802.3 Reduced Twisted Pair Gigabit Ethernet (RTPGE) Study Group closing report |
|
Attachment B14 |
|
IEEE 802.3 Next Generation BASE-T Study Group opening report |
|
Attachment B15 |
|
IEEE 802.3 Next Generation BASE-T Study Group closing report |
|
Attachment B16 |
|
IEEE 802.3 Higher Speed Ethernet consensus industry connection activity opening report |
|
Attachment B17 |
|
IEEE 802.3 Higher Speed Ethernet consensus industry connection activity closing report |
|
Attachment B18 |
|
Call for interest: Distinguished minimum latency traffic in a converged traffic environment opening report |
|
Attachment B19 |
|
Call for interest: Distinguished minimum latency traffic in a converged traffic environment closing report |
|
Liaison Attachments (External and Internal) |
|
Attachment C1 |
|
ISO/IEC SC25/WG3 report to IEEE 802.3 |
|
Attachment C2 |
|
TIA TR-42 Liaison Report to IEEE 802.3 |
|
Attachment C3 |
|
Liaison from Broadband Forum to IEEE 802 regarding WT-304 Broadband Service Attributes and Performance Metrics |
|
Attachment C4 |
|
ISO/IEC SC 25/WG3 regarding 40 Gb/s cabling systems |
|
Attachment C5 |
|
ITU-T SG15 New versions of the Access Network Transport (ANT) Standardization Plan and Work Plan |
|
Attachment C6 |
|
ITU-T SG15 Optical Transport Networks & Technologies (OTNT) Standardization Work Plan
Attachment (Password protected) |
|
Attachment C7 |
|
OIF CEI-28G-VSR Project
Attachment (Password protected) |
|
Attachment C8 |
|
OIF Multi-link Gearbox (MLG) 2.0 Project
Attachment (Password protected) |
|
Attachment C9 |
|
TR-42 Liaison to IEEE 802.3 Working Group
Attachment 1 (Password protected)
Attachment 2 (Password protected) |
|
Attachment C10 |
|
Deutsche Kommission Elektrotechnik (DKE) Liaison to IEEE 802.3 Working Group
|
|
Attachment C11 |
|
Draft liaison response from IEEE 802.3 to OIF regarding the Multi-link Gearbox (MLG) 2.0 Project |
|
Attachment C12 |
|
Draft liaison response from IEEE 802.3 to TIA TR-42 |
|
Attachment C13 |
|
Draft liaison response from IEEE 802.3 to ISO/IEC SC 25/WG3 regarding 40 Gb/s cabling systems |
|
Attachment C14 |
|
Liaison response from IEEE 802.3 to OIF regarding the Multi-link Gearbox (MLG) 2.0 Project |
|
Attachment C15 |
|
Liaison response from IEEE 802.3 to TIA TR-42 |
|
Attachment C16 |
|
Liaison response from IEEE 802.3 to ISO/IEC SC 25/WG3 regarding 40 Gb/s cabling systems |
|
Other Attachments |
|
Attachment D1 |
|
Letter from Elizabeth Kochuparambil, Cisco Systems, Inc, regarding donation to IEEE 802.3 Working Group |
|
Attachment D2 |
|
Draft letter from IEEE 802.3 to Elizabeth Kochuparambil, Cisco Systems, Inc, regarding donation to IEEE 802.3 Working Group |
|
Attachment D3 |
|
Letter from IEEE 802.3 to Elizabeth Kochuparambil, Cisco Systems, Inc, regarding donation to IEEE 802.3 Working Group |