IEEE 802.3 November 2013 Plenary Minutes

11 to 14 November, 2013
Dallas, TX





Minutes

Approved Minutes, IEEE 802.3 Ethernet Working Group Plenary, Dallas, TX, 11 to 14 November, 2013


Administrative attachments

Attachment A1
IEEE 802.3 Opening agenda

Attachment A2
IEEE 802.3 Closing agenda

Attachment A3
IEEE 802.3 Opening report

Attachment A4
IEEE 802.3 Closing report

Attachment A5
IEEE 802.3 Meeting attendance procedures

Attachment A6
IEEE 802.3 Voting member list

Attachment A7
IEEE 802.3 Potential voter list

Attachment A8
IEEE 802.3 Voters in peril

Attachment A9
IEEE 802.3 Attendance credit summary, July 2012 to September 2013

Attachment A10
IEEE 802.3 Attendance list

Attachment A11
IEEE 802.3 Treasury Report

Attachment A12
IEEE 802.3 Standards status

Attachment A13
IEEE 802.3 Future meetings opening report

Attachment A14
IEEE 802.3 Future meetings closing report

Attachment A15
IEEE 802.3 Room assignments

Task Force and Study Group attachments

Attachment B1
IEEE 802.3 Maintenance opening report

Attachment B2
IEEE 802.3 Maintenance closing report

Attachment B3
IEEE P802.3bj 100 Gb/s Backplane and Copper Cable Task Force opening report

Attachment B4
IEEE P802.3bj 100 Gb/s Backplane and Copper Cable Task Force closing report

Attachment B5
IEEE P802.3bm 40 Gb/s and 100 Gb/s Fiber Optic Task Force opening report

Attachment B6
IEEE P802.3bm 40 Gb/s and 100 Gb/s Fiber Optic Task Force closing report

Attachment B7
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force opening report

Attachment B8
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force closing report

Attachment B9
IEEE P802.3bp Reduced Twisted Pair Gigabit Ethernet PHY Task Force opening report

Attachment B10
IEEE P802.3bp Reduced Twisted Pair Gigabit Ethernet PHY Task Force closing report

Attachment B11
IEEE P802.3bq 40GBASE-T Task Force opening report

Attachment B12
IEEE P802.3bq 40GBASE-T Task Force closing report

Attachment B13
IEEE 802.3 Distinguished Minimum Latency Traffic in a Converged Traffic Environment Study Group opening report

Attachment B14
IEEE 802.3 Distinguished Minimum Latency Traffic in a Converged Traffic Environment Study Group closing report

Attachment B15
IEEE 802.3 400 Gb/s Ethernet Study Group opening report

Attachment B16
IEEE 802.3 400 Gb/s Ethernet Study Group closing report

Attachment B17
IEEE 802.3 4-pair Power over Ethernet Study Group opening report

Attachment B18
IEEE 802.3 4-pair Power over Ethernet Study Group closing report

Attachment B19
IEEE 802.3 1-Pair Power over Data Lines Study Group opening report

Attachment B20
IEEE 802.3 1-Pair Power over Data Lines Study Group closing report

Attachment B21
Proposed Industry Connections Activity: NG-EPON opening report

Attachment B22
Proposed Industry Connections Activity: NG-EPON closing report
Draft Industry Connections Activity Initiation Document (ICAID) V 1.94

Liaison Attachments (External and Internal)

Attachment C1
ISO/IEC SC25/WG3 report to IEEE 802.3

Attachment C2
TIA TR-42 Liaison Report to IEEE 802.3

Attachment C3

OIF: CEI-28G-VSR and CEI-28G-MR Projects
Attachment 1 (Password protected)
Attachment 2 (Password protected)


Attachment C4
TIA TR42: IEEE P802.3bp Task Force: Reduced Twisted Pair Gigabit Ethernet (RTPGE)

Attachment C5
ISO/IEC JTC1/SC 25 WG3: Status of standards to support parallel single mode optical fibre cabling

Attachment C6
ISO/IEC JTC1/SC 25 WG3: 40GBASE-T objectives

Attachment C7
ISO/IEC JTC1/SC 25 WG3: Information from IEC/SC 46C relevant to IEEE P802.3bp

Attachment C8
Ethernet Alliance: Congratulations on anniversaries

Attachment C9

OIF: CEI-28G-VSR and CEI-28G-MR Projects
Attachment 1 (Password protected)
Attachment 2 (Password protected)

Attachment C10

OIF: Multi-link Gearbox (MLG) 3.0 Project
Attachment (Password protected)


Attachment C11
ISO/IEC JTC1/SC 25 WG3: Status of ISO/IEC/TR 17979-1-1: Twinax cable assemblies

Attachment C12
CEN-CENELEC-ETSI: Smart Grid Coordination Group: First Set of Standards

Attachment C13
DRAFT response to ITU WP1A: Question ITU-R 236/1

Attachment C14
DRAFT liaison response to OIF on the MLG 3.0 project

Attachment C15
DRAFT liaison response to the Ethernet Alliance congratulations

Attachment C16
DRAFT liaison response to TIA TR-42

Attachment C17
DRAFT liaison response to ISO/IEC JTC 1/SC 25/WG3

Attachment C18
Liaison response to OIF on the MLG 3.0 project

Attachment C19
Liaison response to the Ethernet Alliance congratulations

Attachment C20
Liaison response to TIA TR-42

Attachment C21
Liaison response to ISO/IEC JTC 1/SC 25/WG3


Return to IEEE 802.3 Minutes page
Last Update: 22-Mar 2014


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]