IEEE 802.3 November 2014 Plenary Minutes
3 to 6 November, 2014
San Antonio, TX, USA
Minutes
Approved Minutes, IEEE 802.3 Ethernet Working Group Plenary, San Antonio, TX, USA, 3 to 6 November, 2014
Administrative attachments
Attachment A1
IEEE 802.3 Opening agenda
Attachment A2
IEEE 802.3 Closing agenda
Attachment A3
IEEE 802.3 Opening report
Attachment A4
IEEE 802.3 Closing report
Attachment A5
IEEE 802.3 Meeting attendance procedures
Attachment A6
IEEE 802.3 Voting member list
Attachment A7
IEEE 802.3 Potential voter list
Attachment A8
IEEE 802.3 Voters in peril
Attachment A9
IEEE 802.3 Attendance credit summary, July 2013 to October 2014
Attachment A10
IEEE 802.3 Attendance list Ottawa
Attachment A11
IEEE 802.3 Attendance list Warren
Attachment A12
IEEE 802.3 Attendance list San Antonio
Attachment A13
IEEE 802.3 Treasury Report
Attachment A14
IEEE 802.3 Standards status
Attachment A15
IEEE 802.3 Future meetings opening report
,
May 2015 details
and
May 2016 host offer
Attachment A16
IEEE 802.3 Future meetings closing report
Attachment A17
IEEE 802.3 Rules opening report
Attachment A18
Draft comments on PARs from other WGs
Task Force and Study Group attachments
Attachment B1
IEEE 802.3 Maintenance opening report
Attachment B2
IEEE 802.3 Maintenance closing report
Attachment B3
IEEE P802.3bm 40 Gb/s and 100 Gb/s Fiber Optic Task Force opening report
Attachment B4
IEEE P802.3bm 40 Gb/s and 100 Gb/s Fiber Optic Task Force closing report
Attachment B5
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force opening report
Attachment B6
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force closing report
Attachment B7
IEEE P802.3bp 1000BASE-T1 PHY Task Force opening report
Attachment B8
IEEE P802.3bp 1000BASE-T1 PHY Task Force closing report
Attachment B9
IEEE P802.3bq 40GBASE-T Task Force opening report
Attachment B10
IEEE P802.3bq 40GBASE-T Task Force closing report
Attachment B11
IEEE P802.3br Interspersing Express Traffic Task Force opening report
Attachment B12
IEEE P802.3br Interspersing Express Traffic Task Force closing report
Attachment B13
IEEE P802.3bs 400 Gb/s Ethernet Task Force opening report
Attachment B14
IEEE P802.3bs 400 Gb/s Ethernet Task Force closing report
Attachment B15
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force opening report
Attachment B16
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force closing report
Attachment B17
IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) Task Force opening report
Attachment B18
IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) Task Force closing report
Attachment B19
IEEE P802.3bw 100 Mb/s operation over a single twisted pair Task Force opening report
Attachment B20
IEEE P802.3bw 100 Mb/s operation over a single twisted pair Task Force closing report
Attachment B21
IEEE 802.3 Gigabit Plastic Optical Fibre (GPOF) Study Group opening report
Attachment B22
IEEE 802.3 Gigabit Plastic Optical Fibre (GPOF) Study Group closing report
Attachment B23
IEEE 802.3 25 Gb/s Ethernet Study Group opening report
Attachment B24
IEEE 802.3 25 Gb/s Ethernet Study Group closing report
Attachment B25
IEEE 802.3 Industry Connections NG-EPON Ad Hoc opening report
Attachment B26
Call for interest: Next Gen Enterprise Access BASE-T PHY opening report
Attachment B27
Call for interest: Next Gen Enterprise Access BASE-T PHY closing report
Attachment B28
Call for interest: 25GBASE-T opening report
Attachment B29
Call for interest: 25GBASE-T closing report
Liaison Attachments (External and Internal)
Attachment C1
ISO/IEC SC25/WG3 report to IEEE 802.3
Attachment C2
TIA TR-42 Liaison Report to IEEE 802.3
Attachment C3
OIF to P802.3bs on CEI-56G Projects
Attachment
(Password protected)
Attachment C4
TIA TR-42 to IEEE 802.3 on draft 2.0c of ANSI/TIA-568-C.2-1
Attachment
(Password protected)
Attachment C5
ISO/IEC SC25/WG3 to IEEE 802.3 on channel specification above 1 600 MHz
Attachment C6
ISO/IEC SC25/WG3 to IEEE 802.3 on remote powering
Attachment C7
ITU-T SG9: on Consent of draft new Recommendations ITU-T J.195.2 and J.195.3
Attachment 1
(Password protected)
Attachment 2
(Password protected)
Attachment C8
ISO/IEC SC25/WG3 to IEEE 802.3 on ISO/IEC 11801-9901
Attachment C9
OIF to P802.3bs update on CEI-56G Projects
Attachment
(Password protected)
Attachment C10
TIA TR-42 to IEEE 802.3 on draft 2.0E of ANSI/TIA-568-C.2-1
Attachment
(Password protected)
Attachment C11
DRAFT liaison response to ITU-T SG15 on ANT work plan
Attachment C12
DRAFT liaison response to ITU-T SG15 on OTNT work plan
Attachment C13
DRAFT liaison response to ISO/IEC JTC 1/SC 6 on IEEE Std 802.3.1-2013 comment
Attachment C14
DRAFT liaison response to ITU-T SG9 on new Recommendations
Attachment C15
DRAFT liaison response to ISO/IEC SC25/WG3 on PoE
Attachment C16
Liaison response to ITU-T SG15 on ANT work plan
Attachment C17
Liaison response to ITU-T SG15 on OTNT work plan
Attachment C18
Liaison response to ISO/IEC JTC 1/SC 6 on IEEE Std 802.3.1-2013 comment
Attachment C19
Liaison response to ITU-T SG9 on new Recommendations
Attachment C20
Liaison response to ISO/IEC SC25/WG3 on PoE
Return to IEEE 802.3 Minutes page
Last Update: 10-Mar 2015