IEEE 802.3 November 2014 Plenary Minutes

3 to 6 November, 2014
San Antonio, TX, USA





Minutes

Approved Minutes, IEEE 802.3 Ethernet Working Group Plenary, San Antonio, TX, USA, 3 to 6 November, 2014


Administrative attachments

Attachment A1
IEEE 802.3 Opening agenda

Attachment A2
IEEE 802.3 Closing agenda

Attachment A3
IEEE 802.3 Opening report

Attachment A4
IEEE 802.3 Closing report

Attachment A5
IEEE 802.3 Meeting attendance procedures

Attachment A6
IEEE 802.3 Voting member list

Attachment A7
IEEE 802.3 Potential voter list

Attachment A8
IEEE 802.3 Voters in peril

Attachment A9
IEEE 802.3 Attendance credit summary, July 2013 to October 2014

Attachment A10
IEEE 802.3 Attendance list Ottawa

Attachment A11
IEEE 802.3 Attendance list Warren

Attachment A12
IEEE 802.3 Attendance list San Antonio

Attachment A13
IEEE 802.3 Treasury Report

Attachment A14
IEEE 802.3 Standards status

Attachment A15
IEEE 802.3 Future meetings opening report, May 2015 details and May 2016 host offer

Attachment A16
IEEE 802.3 Future meetings closing report

Attachment A17
IEEE 802.3 Rules opening report

Attachment A18
Draft comments on PARs from other WGs

Task Force and Study Group attachments

Attachment B1
IEEE 802.3 Maintenance opening report

Attachment B2
IEEE 802.3 Maintenance closing report

Attachment B3
IEEE P802.3bm 40 Gb/s and 100 Gb/s Fiber Optic Task Force opening report

Attachment B4
IEEE P802.3bm 40 Gb/s and 100 Gb/s Fiber Optic Task Force closing report

Attachment B5
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force opening report

Attachment B6
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force closing report

Attachment B7
IEEE P802.3bp 1000BASE-T1 PHY Task Force opening report

Attachment B8
IEEE P802.3bp 1000BASE-T1 PHY Task Force closing report

Attachment B9
IEEE P802.3bq 40GBASE-T Task Force opening report

Attachment B10
IEEE P802.3bq 40GBASE-T Task Force closing report

Attachment B11
IEEE P802.3br Interspersing Express Traffic Task Force opening report

Attachment B12
IEEE P802.3br Interspersing Express Traffic Task Force closing report

Attachment B13
IEEE P802.3bs 400 Gb/s Ethernet Task Force opening report

Attachment B14
IEEE P802.3bs 400 Gb/s Ethernet Task Force closing report

Attachment B15
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force opening report

Attachment B16
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force closing report

Attachment B17
IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) Task Force opening report

Attachment B18
IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) Task Force closing report

Attachment B19
IEEE P802.3bw 100 Mb/s operation over a single twisted pair Task Force opening report

Attachment B20
IEEE P802.3bw 100 Mb/s operation over a single twisted pair Task Force closing report

Attachment B21
IEEE 802.3 Gigabit Plastic Optical Fibre (GPOF) Study Group opening report

Attachment B22
IEEE 802.3 Gigabit Plastic Optical Fibre (GPOF) Study Group closing report

Attachment B23
IEEE 802.3 25 Gb/s Ethernet Study Group opening report

Attachment B24
IEEE 802.3 25 Gb/s Ethernet Study Group closing report

Attachment B25
IEEE 802.3 Industry Connections NG-EPON Ad Hoc opening report

Attachment B26
Call for interest: Next Gen Enterprise Access BASE-T PHY opening report

Attachment B27
Call for interest: Next Gen Enterprise Access BASE-T PHY closing report

Attachment B28
Call for interest: 25GBASE-T opening report

Attachment B29
Call for interest: 25GBASE-T closing report

Liaison Attachments (External and Internal)

Attachment C1
ISO/IEC SC25/WG3 report to IEEE 802.3

Attachment C2
TIA TR-42 Liaison Report to IEEE 802.3

Attachment C3

OIF to P802.3bs on CEI-56G Projects
Attachment (Password protected)


Attachment C4

TIA TR-42 to IEEE 802.3 on draft 2.0c of ANSI/TIA-568-C.2-1
Attachment (Password protected)


Attachment C5
ISO/IEC SC25/WG3 to IEEE 802.3 on channel specification above 1 600 MHz

Attachment C6
ISO/IEC SC25/WG3 to IEEE 802.3 on remote powering

Attachment C7

ITU-T SG9: on Consent of draft new Recommendations ITU-T J.195.2 and J.195.3
Attachment 1 (Password protected)
Attachment 2 (Password protected)


Attachment C8
ISO/IEC SC25/WG3 to IEEE 802.3 on ISO/IEC 11801-9901

Attachment C9

OIF to P802.3bs update on CEI-56G Projects
Attachment (Password protected)


Attachment C10

TIA TR-42 to IEEE 802.3 on draft 2.0E of ANSI/TIA-568-C.2-1
Attachment (Password protected)


Attachment C11
DRAFT liaison response to ITU-T SG15 on ANT work plan

Attachment C12
DRAFT liaison response to ITU-T SG15 on OTNT work plan

Attachment C13
DRAFT liaison response to ISO/IEC JTC 1/SC 6 on IEEE Std 802.3.1-2013 comment

Attachment C14
DRAFT liaison response to ITU-T SG9 on new Recommendations

Attachment C15
DRAFT liaison response to ISO/IEC SC25/WG3 on PoE

Attachment C16
Liaison response to ITU-T SG15 on ANT work plan

Attachment C17
Liaison response to ITU-T SG15 on OTNT work plan

Attachment C18
Liaison response to ISO/IEC JTC 1/SC 6 on IEEE Std 802.3.1-2013 comment

Attachment C19
Liaison response to ITU-T SG9 on new Recommendations

Attachment C20
Liaison response to ISO/IEC SC25/WG3 on PoE


Return to IEEE 802.3 Minutes page
Last Update: 10-Mar 2015


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]