IEEE 802.3 November 2015 Plenary Minutes

9 to 12 November, 2015
Dallas, TX





Minutes

Approved Minutes, IEEE 802.3 Ethernet Working Group Plenary, Dallas, TX, 9 to 12 November, 2015


Administrative attachments

Attachment A1
IEEE 802.3 Opening agenda

Attachment A2
IEEE 802.3 Closing agenda

Attachment A3
IEEE 802.3 Opening report

Attachment A4
IEEE 802.3 Closing report

Attachment A5
IEEE 802.3 Meeting attendance procedures

Attachment A6
IEEE 802.3 Voting member list

Attachment A7
IEEE 802.3 Potential voter list

Attachment A8
IEEE 802.3 Voters in peril

Attachment A9
IEEE 802.3 Attendance credit summary, July 2014 to October 2015

Attachment A10
IEEE 802.3 Attendance list Catania

Attachment A11
IEEE 802.3 Attendance list Dallas

Attachment A12
IEEE 802.3 Treasury Report

Attachment A13
IEEE 802.3 Standards status

Attachment A14
IEEE 802.3 Future meetings closing report, May 2016 details, Sep 2016 host offer and May 2017 host offer

Attachment A15
IEEE 802.3 Rules opening report

Attachment A16
IEEE 802.3 Rules closing report

Task Force and Study Group attachments

Attachment B1
IEEE 802.3 Maintenance opening report

Attachment B2
IEEE 802.3 Maintenance closing report

Attachment B3
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force opening report

Attachment B4
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force closing report

Attachment B5
IEEE P802.3bp 1000BASE-T1 PHY Task Force opening report

Attachment B6
IEEE P802.3bp 1000BASE-T1 PHY Task Force closing report

Attachment B7
IEEE P802.3bq 40GBASE-T Task Force opening report

Attachment B8
IEEE P802.3bq 40GBASE-T Task Force closing report

Attachment B9
IEEE P802.3br Interspersing Express Traffic Task Force opening report

Attachment B10
IEEE P802.3br Interspersing Express Traffic Task Force closing report

Attachment B11
IEEE P802.3bs 400 Gb/s Ethernet Task Force opening report

Attachment B12
IEEE P802.3bs 400 Gb/s Ethernet Task Force closing report

Attachment B13
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force opening report

Attachment B14
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force closing report

Attachment B15
IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) Task Force opening report

Attachment B16
IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) Task Force closing report

Attachment B17
IEEE P802.3bv Gigabit Plastic Optical Fibre (GPOF) Task Force opening report

Attachment B18
IEEE P802.3bv Gigabit Plastic Optical Fibre (GPOF) Task Force closing report

Attachment B19
IEEE 802.3by 25 Gb/s Ethernet Task Force opening report

Attachment B20
IEEE P802.3by 25 Gb/s Ethernet Task Force closing report

Attachment B21
IEEE P802.3bz 2.5G/5GBASE-T Task Force opening report

Attachment B22
IEEE P802.3bz 2.5G/5GBASE-T Task Force closing report

Attachment B23
IEEE 802.3 NG-EPON Study Group opening report

Attachment B24
IEEE 802.3 NG-EPON Study Group closing report

Attachment B25
IEEE 802.3 2.5 Gb/s and 5 Gb/s Backplane and Short Reach Copper Cable Study Group opening report

Attachment B26
IEEE 802.3 2.5 Gb/s and 5 Gb/s Backplane and Short Reach Copper Cable Study Group closing report

Attachment B27
Call for interest: Single lane 50 Gb/s, next generation 100 Gb/s and 200 Gb/s Ethernet opening report

Attachment B28
Call for interest: Single lane 50 Gb/s, next generation 100 Gb/s and 200 Gb/s Ethernet closing report

Attachment B29
Call for interest: 25 Gb/s single mode fibre opening report

Attachment B30
Call for interest: 25 Gb/s single mode fibre closing report

Attachment B31
Proposed Industry Connections Next Generation Enterprise/Campus/Data Center Ethernet opening report

Attachment B32
Proposed Industry Connections Next Generation Enterprise/Campus/Data Center Ethernet closing report

Liaison Attachments (External and Internal)

Attachment C1
ISO/IEC SC25/WG3 report to IEEE 802.3

Attachment C2
TIA TR-42 Liaison Report to IEEE 802.3

Attachment C3
OIF to IEEE 802.3 on Flex Ethernet Implementation Agreement

Attachment C4
DRAFT liaison to ISO/IEC JTC1 SC 6 on IEEE Std 802.3bw-2015

Attachment C5
DRAFT liaison response to ITU-T SG15 on ANT standardization work plan

Attachment C6
DRAFT liaison response to ITU-T SG15 on HNT standardization work plan

Attachment C7
DRAFT liaison response to ITU-T SG15 on OTNT standardization work plan

Attachment C8
DRAFT liaison response to OIF on Flex Ethernet

Attachment C9
Liaison to ISO/IEC JTC1 SC 6 on IEEE Std 802.3bw-2015

Attachment C10
Liaison response to ITU-T SG15 on ANT standardization work plan

Attachment C11
Liaison response to ITU-T SG15 on HNT standardization work plan

Attachment C12
Liaison response to ITU-T SG15 on OTNT standardization work plan

Attachment C13
Liaison response to OIF on Flex Ethernet


Return to IEEE 802.3 Minutes page
Last Update: 18-Mar 2016


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]