Administrative attachments |
|
Attachment A1 |
|
IEEE 802.3 Opening agenda |
|
Attachment A2 |
|
IEEE 802.3 Closing agenda |
|
Attachment A3 |
|
IEEE 802.3 Opening report |
|
Attachment A4 |
|
IEEE 802.3 Closing report |
|
Attachment A5 |
|
IEEE 802.3 Meeting attendance procedures |
|
Attachment A6 |
|
IEEE 802.3 Voting member list |
|
Attachment A7 |
|
IEEE 802.3 Potential voter list |
|
Attachment A8 |
|
IEEE 802.3 Voters in peril |
|
Attachment A9 |
|
IEEE 802.3 Attendance credit summary, July 2015 to October 2016 |
|
Attachment A10 |
|
IEEE 802.3 Attendance list San Antonio |
|
Attachment A11 |
|
IEEE 802.3 Treasury Report |
|
Attachment A12 |
|
IEEE 802.3 Standards status |
|
Attachment A13 |
|
IEEE 802.3 Future meetings closing report,
Jan 2017 update,
May 2018 host offer and
Sep 2017 host offer |
|
Attachment A14 |
|
IEEE 802.3 Rules opening report |
|
Task Force and Study Group attachments |
|
Attachment B1 |
|
IEEE 802.3 Maintenance opening report |
|
Attachment B2 |
|
IEEE 802.3 Maintenance closing report |
|
Attachment B3 |
|
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force opening report |
|
Attachment B4 |
|
IEEE P802.3bs 200 Gb/s and 400 Gb/s Ethernet Task Force opening report |
|
Attachment B5 |
|
IEEE P802.3bs 200 Gb/s and 400 Gb/s Ethernet Task Force closing report |
|
Attachment B6 |
|
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force opening report |
|
Attachment B7 |
|
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force closing report |
|
Attachment B8 |
|
IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) Task Force opening report |
|
Attachment B9 |
|
IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) Task Force closing report |
|
Attachment B10 |
|
IEEE P802.3bv Gigabit Plastic Optical Fiber (GPOF) Task Force opening report |
|
Attachment B11 |
|
IEEE P802.3bv Gigabit Plastic Optical Fiber (GPOF) Task Force closing report |
|
Attachment B12 |
|
IEEE P802.3bz 2.5GBASE-T and 5GBASE-T Task Force opening report |
|
Attachment B13 |
|
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force opening report |
|
Attachment B14 |
|
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force closing report |
|
Attachment B15 |
|
IEEE P802.3cb 2.5 Gb/s and 5 Gb/s Backplane Task Force opening report |
|
Attachment B16 |
|
IEEE P802.3cb 2.5 Gb/s and 5 Gb/s Backplane Task Force closing report |
|
Attachment B17 |
|
IEEE P802.3cc 25 Gb/s Ethernet over single-mode fiber Task Force opening report |
|
Attachment B18 |
|
IEEE P802.3cc 25 Gb/s Ethernet over single-mode fiber Task Force closing report |
|
Attachment B19 |
|
IEEE P802.3cd 50Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force opening report |
|
Attachment B20 |
|
IEEE P802.3cd 50Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force closing report |
|
Attachment B21 |
|
IEEE P802.3.2 (IEEE 802.3cf) YANG data models Task Force opening report |
|
Attachment B22 |
|
IEEE P802.3.2 (IEEE 802.3cf) YANG data models Task Force closing report |
|
Attachment B23 |
|
IEEE 802.3 10 Mb/s single twisted pair Study Group opening report |
|
Attachment B24 |
|
IEEE 802.3 10 Mb/s single twisted pair Study Group closing report |
|
Attachment B25 |
|
Industry Connections Next Generation Enterprise/Campus/Data Center Ethernet opening report |
|
Attachment B26 |
|
Industry Connections Next Generation Enterprise/Campus/Data Center Ethernet closing report |
|
Attachment B27 |
|
Call for interest: Multi-Gig Automotive Ethernet PHY opening report |
|
Attachment B28 |
|
Call for interest: Multi-Gig Automotive Ethernet PHY closing report |
|
Liaison Attachments (External and Internal) |
|
Attachment C1 |
|
ISO/IEC SC25/WG3 report to IEEE 802.3 |
|
Attachment C2 |
|
TIA TR-42 Liaison Report to IEEE 802.3 |
|
Attachment C3 |
|
ISO/IEC JTC 1/SC 25 to IEEE 802.3 regarding elevated temperature operation of cabling
|
|
Attachment C4 |
|
ISO/IEC JTC 1/SC 25 to IEEE 802.3 regarding cabling TRs
|
|
Attachment C5 |
|
OIF to IEEE P802.3bs and P802.3cd regarding progress on OIF CEI-56G projects
Attachments (Password protected)
|
|
Attachment C6 |
|
ISO TC22 SC32 to IEEE 802.3 regarding category A liaison request
|
|
Attachment C7 |
|
ITU-T SG15 to IEEE 802.3 on OTNT standardization work plan
Attachment (Password protected)
|
|
Attachment C8 |
|
ITU-T SG15 to IEEE 802.3 on management information models
Attachments 149 Mb! (Password protected)
|
|
Attachment C9 |
|
ITU-T SG15 to IEEE 802.3 on ANT standardization work plan
|
|
Attachment C10 |
|
ITU-T SG15 to IEEE 802.3 on HNT standardization work plan
|
|
Attachment C11 |
|
ITU-T SG15 to IEEE 802.3 on responses on the ANT and HNT work plans
|
|
Attachment C12 |
|
ITU-T SG15 to Broadband Forum on YANG management for PON
|
|
Attachment C13 |
|
TIA TR42 to IEEE 802.3 regarding 1-pair cabling and applications
|
|
Attachment C14 |
|
TIA TR42 to IEEE 802.3 regarding elevated temperature operation of cabling
|
|
Attachment C15 |
|
Broadband Forum to IEEE 802.3 on low power modes for fibre backhaul for FTTdp
|
|
Attachment C16 |
|
COBO to IEEE P802.3 on progress update
Attachment (Password protected)
|
|
Attachment C17 |
|
OIF to IEEE 802.3 on start of 400ZR interop project
|
|
Attachment C18 |
|
DRAFT liaison response to the Broadband Forum on Low Power Modes for Fibre backhaul for FTTdp
|
|
Attachment C19 |
|
DRAFT liaison response to OIF on the 400ZR Interop Project
|
|
Attachment C20 |
|
DRAFT liaison response to ISO/IEC JTC 1/SC 6 on China NB comments
|
|
Attachment C21 |
|
DRAFT liaison response to ISO/IEC SC25 WG3 on high temperature operation of cabling
|
|
Attachment C22 |
|
DRAFT liaison response to TIA TR-42 on high temperature operation of cabling
|
|
Attachment C23 |
|
DRAFT liaison response to ISO TC22 SC32 on Category A liaison with IEEE 802.3
|
|
Attachment C24 |
|
Liaison response to the Broadband Forum on Low Power Modes for Fibre backhaul for FTTdp
|
|
Attachment C25 |
|
Liaison response to OIF on the 400ZR Interop Project
|
|
Attachment C26 |
|
Liaison response to ISO/IEC JTC 1/SC 6 on China NB comments
|
|
Attachment C27 |
|
Liaison response to ISO/IEC SC25 WG3 on high temperature operation of cabling
|
|
Attachment C28 |
|
Liaison response to TIA TR-42 on high temperature operation of cabling
|
|
Attachment C29 |
|
Liaison response to ISO TC22 SC32 on Category A liaison with IEEE 802.3
|