Administrative attachments |
|
Attachment A1 |
|
IEEE 802.3 Opening agenda |
|
Attachment A2 |
|
IEEE 802.3 Closing agenda |
|
Attachment A3 |
|
IEEE 802.3 Opening report |
|
Attachment A4 |
|
IEEE 802.3 Closing report |
|
Attachment A5 |
|
IEEE 802.3 Meeting attendance procedures |
|
Attachment A6 |
|
IEEE 802.3 Voting member list |
|
Attachment A7 |
|
IEEE 802.3 Potential voter list |
|
Attachment A8 |
|
IEEE 802.3 Voters in peril |
|
Attachment A9 |
|
IEEE 802.3 Attendance credit summary, July 2016 to October 2017 |
|
Attachment A10 |
|
IEEE 802.3 Attendance list Orlando |
|
Attachment A11 |
|
IEEE 802.3 Treasury Report |
|
Attachment A12 |
|
IEEE 802.3 Standards status |
|
Attachment A13 |
|
IEEE 802.3 Future meetings closing report,
May 2018 update,
May 2019 offer, |
|
Attachment A14 |
|
IEEE 802.3 PARs Ad Hoc report |
|
Attachment A15 |
|
IEC/IEEE JWC proposal |
|
Task Force and Study Group attachments |
|
Attachment B1 |
|
IEEE 802.3 Maintenance opening report |
|
Attachment B2 |
|
IEEE 802.3 Maintenance closing report |
|
Attachment B3 |
|
IEEE P802.3bs 200 Gb/s and 400 Gb/s Ethernet Task Force opening report |
|
Attachment B4 |
|
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force opening report |
|
Attachment B5 |
|
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force closing report |
|
Attachment B6 |
|
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force opening report |
|
Attachment B7 |
|
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force closing report |
|
Attachment B8 |
|
IEEE P802.3cb 2.5 Gb/s and 5 Gb/s Backplane Task Force opening report |
|
Attachment B9 |
|
IEEE P802.3cb 2.5 Gb/s and 5 Gb/s Backplane Task Force closing report |
|
Attachment B10 |
|
IEEE P802.3cc 25 Gb/s Ethernet over single-mode fiber Task Force opening report |
|
Attachment B11 |
|
IEEE P802.3cd 50Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force opening report |
|
Attachment B12 |
|
IEEE P802.3cd 50Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force closing report |
|
Attachment B13 |
|
IEEE P802.3.2 (IEEE 802.3cf) YANG data models Task Force opening report |
|
Attachment B14 |
|
IEEE P802.3.2 (IEEE 802.3cf) YANG data models Task Force closing report |
|
Attachment B15 |
|
IEEE P802.3cg 10 Mb/s Single Twisted Pair Ethernet Task Force opening report |
|
Attachment B16 |
|
IEEE P802.3cg 10 Mb/s Single Twisted Pair Ethernet Task Force closing report |
|
Attachment B17 |
|
IEEE P802.3ch Multi-Gig Automotive Ethernet PHY Task Force opening report |
|
Attachment B18 |
|
IEEE P802.3ch Multi-Gig Automotive Ethernet PHY Task Force closing report |
|
Attachment B19 |
|
IEEE 802.3 Beyond 10 km optical PHYs Study Group opening report |
|
Attachment B20 |
|
IEEE 802.3 Beyond 10 km optical PHYs Study Group closing report |
|
Attachment B21 |
|
Industry Connections New Ethernet Applications opening report |
|
Attachment B22 |
|
Industry Connections New Ethernet Applications closing report |
|
Attachment B23 |
|
Call for interest: 10Mb/s Backplane Ethernet opening report |
|
Attachment B24 |
|
Call for interest: 10Mb/s Backplane Ethernet closing report |
|
Attachment B25 |
|
Call for interest: Beyond 10 km Optical 100 Gb/s PHYs opening report |
|
Attachment B26 |
|
Call for interest: Beyond 10 km Optical 100 Gb/s PHYs closing report |
|
Attachment B27 |
|
Call for interest: 100 Gb/s per Lane for Electrical Interfaces and PHYs opening report |
|
Attachment B28 |
|
Call for interest: 100 Gb/s per Lane for Electrical Interfaces and PHYs closing report |
|
Attachment B29 |
|
Call for interest: Next-generation 200 Gb/s and 400 Gb/s MMF fibre PHYs opening report |
|
Attachment B30 |
|
Call for interest: Next-generation 200 Gb/s and 400 Gb/s MMF fibre PHYs closing report |
|
Liaison Attachments (External and Internal) |
|
Attachment C1 |
|
ISO/IEC SC25/WG3 report to IEEE 802.3 |
|
Attachment C2 |
|
TIA TR-42 Liaison Report to IEEE 802.3 |
|
Attachment C3 |
|
ISO/IEC JTC1 SC25 to IEEE 802.3 on 1-pair cabling
|
|
Attachment C3 |
|
OIF to IEEE P802.3bs and P802.3cd regarding progress on OIF CEI-56G-VSR-PAM4 project
Attachment (Password protected)
|
|
Attachment C4 |
|
NGMN Alliance to IEEE 802 on 5G end-to-end architecture framework
Attachment (Password protected)
|
|
Attachment C5 |
|
ITU-T SG15 to IEEE 802.3 regarding coordination on IM/DM for OAM
Attachment (Password protected)
|
|
Attachment C6 |
|
TIA TR-42 to IEEE 802.3 on connectors and topologies for single pair applications
|
|
Attachment C7 |
|
ITU-T SG15 to IEEE 802.3 regarding coherent 100 Gb/s DWDM interfaces
|
|
Attachment C8 |
|
ITU-T SG15 to IEEE 802.3 on timing performance due to Ethernet PHY
|
|
Attachment C9 |
|
COBO to IEEE 802.3 regarding 8 & 16 lane on board optics specification D0.5
Attachment (Password protected)
|
|
Attachment C10 |
|
PI (PROFIBUS and PROFINET International) to IEEE P802.3cg on establishing an official liaison
|
|
Attachment C11 |
|
OIF to IEEE 802.3 regarding the 400ZR Interop Project
|
|
Attachment C12 |
|
DRAFT liaison to ITU-T SG15 regarding IEEE P802.3bs progress
|
|
Attachment C13 |
|
DRAFT liaison to OIF regarding IEEE P802.3bs progress
|
|
Attachment C14 |
|
DRAFT liaison to INCITS T11.2 regarding IEEE P802.3bs progress
|
|
Attachment C15 |
|
DRAFT liaison to ITU-T SG15 on the ANT workplan
|
|
Attachment C16 |
|
DRAFT liaison to ITU-T SG15 on the HNT workplan
|
|
Attachment C17 |
|
DRAFT liaison to ITU-T SG15 on the OTNT workplan
|
|
Attachment C18 |
|
DRAFT liaison to ISO/IEC JTC 1/SC 6 on China NB comment
|
|
Attachment C19 |
|
DRAFT liaison to Ethernet Alliance on PoE certification program
|
|
Attachment C20 |
|
DRAFT liaison to IEEE SCC18 on support for public inputs to NFPA 70 2020
|
|
Attachment C21 |
|
DRAFT liaison to NFPA Standards Council on TIA 1301 communications powering circuits
|
|
Attachment C22 |
|
DRAFT liaison to ITU-T SG15 regarding IEEE P802.3ca progress
|
|
Attachment C23 |
|
DRAFT liaison to OIF regarding IEEE P802.3cd progress
|
|
Attachment C24 |
|
DRAFT liaison reply to COBO
|
|
Attachment C25 |
|
DRAFT liaison to ITU-T SG15 on YANG progress
|
|
Attachment C26 |
|
DRAFT liaison to IEC SC65 JWG10 on single pair Ethernet
|
|
Attachment C27 |
|
DRAFT liaison to TIA TR42 on connectors and topologies for single pair applications
|
|
Attachment C28 |
|
DRAFT liaison to ISO IEC SC25 WG3 regarding IEEE P802.3cg progress
|
|
Attachment C29 |
|
DRAFT liaison to ITU-T SG15 regarding G.698.2
|
|
Attachment C30 |
|
DRAFT liaison to OIF on 400ZR Interop Project
|
|
Attachment C31 |
|
Liaison to ITU-T SG15 regarding IEEE P802.3bs progress
|
|
Attachment C32 |
|
Liaison to OIF regarding IEEE P802.3bs progress
|
|
Attachment C33 |
|
Liaison to INCITS T11.2 regarding IEEE P802.3bs progress
|
|
Attachment C34 |
|
Liaison to ITU-T SG15 on the ANT workplan
|
|
Attachment C35 |
|
Liaison to ITU-T SG15 on the HNT workplan
|
|
Attachment C36 |
|
Liaison to ITU-T SG15 on the OTNT workplan
|
|
Attachment C37 |
|
Liaison to ISO/IEC JTC 1/SC 6 on China NB comment
|
|
Attachment C38 |
|
Liaison to Ethernet Alliance on PoE certification program
|
|
Attachment C39 |
|
Liaison to IEEE SCC18 on support for public inputs to NFPA 70 2020
|
|
Attachment C40 |
|
Liaison to NFPA Standards Council on TIA 1301 communications powering circuits
|
|
Attachment C41 |
|
Liaison to ITU-T SG15 regarding IEEE P802.3ca progress
|
|
Attachment C42 |
|
Liaison to OIF regarding IEEE P802.3cd progress
|
|
Attachment C43 |
|
Liaison reply to COBO
|
|
Attachment C44 |
|
Liaison to ITU-T SG15 on YANG progress
|
|
Attachment C45 |
|
Liaison to IEC SC65 JWG10 on single pair Ethernet
|
|
Attachment C46 |
|
Liaison to TIA TR42 on connectors and topologies for single pair applications
|
|
Attachment C47 |
|
Liaison to ISO IEC SC25 WG3 regarding IEEE P802.3cg progress
|
|
Attachment C48 |
|
Liaison to ITU-T SG15 regarding G.698.2
|
|
Attachment C49 |
|
Liaison to OIF on 400ZR Interop Project
|