Administrative attachments |
|
Attachment A1 |
|
IEEE 802.3 Opening agenda |
|
Attachment A2 |
|
IEEE 802.3 Closing agenda |
|
Attachment A3 |
|
IEEE 802.3 Opening report |
|
Attachment A4 |
|
IEEE 802.3 Closing report |
|
Attachment A5 |
|
IEEE 802.3 Meeting attendance procedures |
|
Attachment A6 |
|
IEEE 802.3 Voters list |
|
Attachment A7 |
|
IEEE 802.3 Membership list |
|
Attachment A8 |
|
IEEE 802.3 Potential voter list |
|
Attachment A9 |
|
IEEE 802.3 Voters in peril |
|
Attachment A10 |
|
IEEE 802.3 Attendance credit summary, July 2017 to October 2018 |
|
Attachment A11 |
|
IEEE 802.3 Attendance list Bangkok |
|
Attachment A12 |
|
IEEE 802.3 Treasury Report |
|
Attachment A13 |
|
IEEE 802.3 Future meetings closing report,  
May 2019 update,  
Huawei poll
|
|
Attachment A14 |
|
IEEE 802.3 Rules opening report |
|
Attachment A15 |
|
IEEE 802.3 Rules closing report |
|
Task Force and Study Group attachments |
|
Attachment B1 |
|
IEEE 802.3 Maintenance opening report |
|
Attachment B2 |
|
IEEE 802.3 Maintenance closing report |
|
Attachment B3 |
|
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force opening report |
|
Attachment B4 |
|
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force opening report |
|
Attachment B5 |
|
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force closing report |
|
Attachment B6 |
|
IEEE P802.3cb 2.5 Gb/s and 5 Gb/s Backplane Task Force opening report |
|
Attachment B7 |
|
IEEE P802.3cd 50Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force opening report |
|
Attachment B8 |
|
IEEE P802.3.2 (IEEE 802.3cf) YANG data models Task Force opening report |
|
Attachment B9 |
|
IEEE P802.3.2 (IEEE 802.3cf) YANG data models Task Force closing report |
|
Attachment B10 |
|
IEEE P802.3cg 10 Mb/s Single Twisted Pair Ethernet Task Force opening report |
|
Attachment B11 |
|
IEEE P802.3cg 10 Mb/s Single Twisted Pair Ethernet Task Force closing report |
|
Attachment B12 |
|
IEEE P802.3ch Multi-Gig Automotive Ethernet PHY Task Force opening report |
|
Attachment B13 |
|
IEEE P802.3ch Multi-Gig Automotive Ethernet PHY Task Force closing report |
|
Attachment B14 |
|
IEEE P802.3ck 100 Gb/s, 200 Gb/s, and 400 Gb/s Electrical Interfaces Task Force opening report |
|
Attachment B15 |
|
IEEE P802.3ck 100 Gb/s, 200 Gb/s, and 400 Gb/s Electrical Interfaces Task Force closing report |
|
Attachment B16 |
|
IEEE P802.3cm 400 Gb/s over Multimode Fiber Task Force opening report |
|
Attachment B17 |
|
IEEE P802.3cm 400 Gb/s over Multimode Fiber Task Force closing report |
|
Attachment B18 |
|
IEEE P802.3cn 50 Gb/s, 100 Gb/s, 200 Gb/s, and 400 Gb/s over SMF and DWDM Task Force opening report |
|
Attachment B19 |
|
IEEE P802.3cn 50 Gb/s, 100 Gb/s, 200 Gb/s, and 400 Gb/s over SMF and DWDM Task Force closing report |
|
Attachment B20 |
|
IEEE P802.3cq Power over Ethernet over 2 Pairs (Maintenance #13) Task Force opening report |
|
Attachment B21 |
|
IEEE P802.3cq Power over Ethernet over 2 Pairs (Maintenance #13) Task Force closing report |
|
Attachment B22 |
|
IEEE P802.3cr Isolation (Maintenance #14) Task Force opening report |
|
Attachment B23 |
|
IEEE P802.3cr Isolation (Maintenance #14) Task Force closing report |
|
Attachment B24 |
|
IEEE 802.3 Bidirectional 10 Gb/s, 25 Gb/s, and 50 Gb/s Optical Access PHYs Study Group opening report |
|
Attachment B25 |
|
IEEE 802.3 Bidirectional 10 Gb/s, 25 Gb/s, and 50 Gb/s Optical Access PHYs Study Group closing report |
|
Attachment B26 |
|
IEEE 802.3 Physical Layers for increased-reach Ethernet optical subscriber access (Super-PON) Study Group opening report |
|
Attachment B27 |
|
IEEE 802.3 Physical Layers for increased-reach Ethernet optical subscriber access (Super-PON) Study Group closing report |
|
Attachment B28 |
|
Industry Connections New Ethernet Applications opening report |
|
Attachment B29 |
|
Industry Connections New Ethernet Applications closing report |
|
Attachment B30 |
|
IEEE 802.3 SCC18 Ad Hoc closing report |
|
Attachment B31 |
|
Call for interest: 100 Gb/s Lambda opening report |
|
Attachment B32 |
|
Call for interest: 100 Gb/s Lambda closing report |
|
Liaison Attachments (External and Internal) |
|
Attachment C1 |
|
ISO/IEC SC25/WG3 report to IEEE 802.3 |
|
Attachment C2 |
|
TIA TR-42 Liaison Report to IEEE 802.3 |
|
Attachment C3 |
|
ISO/IEC SC25 to IEEE 802.3 on Liaison officer - updated
|
|
Attachment C4 |
|
COBO to IEEE 802.3 on specification availability
|
|
Attachment C5 |
|
ITU-T SG15 to IEEE 802.3 regarding the ANT Standards Overview and Work Plan
|
|
Attachment C6 |
|
ITU-T SG15 to IEEE 802.3 regarding the HNT Standards Overview and Work Plan
|
|
Attachment C7 |
|
ITU-T SG15 to IEEE 802.3 regarding the ANT and HNT documents
|
|
Attachment C8 |
|
ITU-T SG15 to IEEE 802.3 on the IEEE 802.3cb 2.5 Gb/s specification
Attachment (Password protected)
|
|
Attachment C9 |
|
ITU-T SG15 to IEEE 802.3 regarding SG15 work on G.709.3 and G.698.2
Attachments (Password protected)
|
|
Attachment C10 |
|
ITU-T SG15 to IEEE 802.3 on coordination of Ethernet information and data modelling work
- updated
|
|
Attachment C11 |
|
MEF to IEEE 802.3 on MEF 63 and operator L1 service attributes
|
|
Attachment C12 |
|
ITU-T JCA-IMT2020 to IEEE 802.3 on invitation to update the IMT2020 roadmap
|
|
Attachment C13 |
|
OIF to IEEE 802.3 regarding 400ZR Interop Project
Attachment (Password protected)
|
|
Attachment C14 |
|
TIA TR42 to IEEE 802.3 regarding balanced single pair connector selection
|
|
Attachment C15 |
|
DRAFT liaison to MEF regarding update on MEF 63 and Operator L1 Service Attributes
|
|
Attachment C16 |
|
DRAFT liaison to ITU-T SG15 on coordination of Ethernet information and data modelling work
|
|
Attachment C17 |
|
DRAFT liaison to ISO/IEC SC25/WG3 on single pair Ethernet
|
|
Attachment C18 |
|
DRAFT liaison to COBO on status of IEEE P802.3cm, P802.3ck, and P802.3cn projects
|
|
Attachment C19 |
|
DRAFT liaison to ISO/IEC SC25/WG3 regarding ISO/IEC TR 11801-9909
|
|
Attachment C20 |
|
Liaison to MEF regarding update on MEF 63 and Operator L1 Service Attributes
|
|
Attachment C21 |
|
Liaison to ITU-T SG15 on coordination of Ethernet information and data modelling work
|
|
Attachment C22 |
|
Liaison to ISO/IEC SC25/WG3 on single pair Ethernet
|
|
Attachment C23 |
|
Liaison to COBO on status of IEEE P802.3cm, P802.3ck, and P802.3cn projects
|
|
Attachment C24 |
|
Liaison to ISO/IEC SC25/WG3 regarding ISO/IEC TR 11801-9909
|