Administrative attachments |
|
Attachment A1 |
|
IEEE 802.3 Opening agenda |
|
|
Attachment A2 |
|
IEEE 802.3 Closing agenda |
|
|
Attachment A3 |
|
IEEE 802.3 Opening report |
|
|
Attachment A4 |
|
IEEE 802.3 Closing report |
|
|
Attachment A5 |
|
IEEE 802.3 Meeting attendance procedures |
|
|
Attachment A6 |
|
IEEE 802.3 Voters list |
|
|
Attachment A7 |
|
IEEE 802.3 Membership list |
|
|
Attachment A8 |
|
IEEE 802.3 Potential voter list |
|
|
Attachment A9 |
|
IEEE 802.3 Voters in peril |
|
|
Attachment A10 |
|
IEEE 802.3 Attendance credit summary, July 2018 to October 2019 |
|
|
Attachment A11 |
|
IEEE 802.3 Attendance list Waikoloa Village |
|
|
Attachment A12 |
|
IEEE 802.3 Treasury Report |
|
|
Attachment A13 |
|
IEEE 802.3 Future meetings closing report
Sept 2020 offer |
|
|
Attachment A14 |
|
IEEE 802.3 PARs Ad Hoc closing report |
|
|
Task Force and Study Group attachments |
|
Attachment B1 |
|
IEEE 802.3 Maintenance opening report |
|
|
Attachment B2 |
|
IEEE 802.3 Maintenance closing report |
|
|
Attachment B3 |
|
IEEE P802.3ca 25 Gb/s and 50 Gb/s Ethernet Passive Optical Networks Task Force opening report |
|
|
Attachment B4 |
|
IEEE P802.3ca 25 Gb/s and 50 Gb/s Ethernet Passive Optical Networks Task Force closing report |
|
|
Attachment B5 |
|
IEEE P802.3cg 10 Mb/s Single Pair Ethernet Task Force opening report |
|
|
Attachment B6 |
|
IEEE P802.3ch Multi-Gig Automotive Ethernet PHY Task Force opening report |
|
|
Attachment B7 |
|
IEEE P802.3ch Multi-Gig Automotive Ethernet PHY Task Force closing report |
|
|
Attachment B8 |
|
IEEE P802.3ck 100 Gb/s, 200 Gb/s, and 400 Gb/s Electrical Interfaces Task Force opening report |
|
|
Attachment B9 |
|
IEEE P802.3ck 100 Gb/s, 200 Gb/s, and 400 Gb/s Electrical Interfaces Task Force closing report |
|
|
Attachment B10 |
|
IEEE P802.3cm 400 Gb/s over Multimode Fiber Task Force opening report |
|
|
Attachment B11 |
|
IEEE P802.3cm 400 Gb/s over Multimode Fiber Task Force closing report |
|
|
Attachment B12 |
|
IEEE P802.3cn 50 Gb/s, 200 Gb/s, and 400 Gb/s over greater than 10 km of SMF Task Force opening report |
|
|
Attachment B13 |
|
IEEE P802.3cp Bidirectional 10 Gb/s, 25 Gb/s, and 50 Gb/s Optical Access PHYs Task Force opening report |
|
|
Attachment B14 |
|
IEEE P802.3cp Bidirectional 10 Gb/s, 25 Gb/s, and 50 Gb/s Optical Access PHYs Task Force closing report |
|
|
Attachment B15 |
|
IEEE P802.3cq Power over Ethernet over 2 Pairs (Maintenance #13) Task Force opening report |
|
|
Attachment B16 |
|
IEEE P802.3cq Power over Ethernet over 2 Pairs (Maintenance #13) Task Force closing report |
|
|
Attachment B17 |
|
IEEE P802.3cr Isolation (Maintenance #14) Task Force opening report |
|
|
Attachment B18 |
|
IEEE P802.3cr Isolation (Maintenance #14) Task Force closing report |
|
|
Attachment B19 |
|
IEEE P802.3cs Increased-reach Ethernet optical subscriber access (Super-PON) Task Force opening report |
|
|
Attachment B20 |
|
IEEE P802.3cs Increased-reach Ethernet optical subscriber access (Super-PON) Task Force closing report |
|
|
Attachment B21 |
|
IEEE P802.3ct 100 Gb/s and 400 Gb/s over DWDM systems Task Force opening report |
|
|
Attachment B22 |
|
IEEE P802.3ct 100 Gb/s and 400 Gb/s over DWDM systems Task Force closing report |
|
|
Attachment B23 |
|
IEEE P802.3cu 100 Gb/s and 400 Gb/s over SMF at 100 Gb/s per wavelength Task Force opening report |
|
|
Attachment B24 |
|
IEEE P802.3cu 100 Gb/s and 400 Gb/s over SMF at 100 Gb/s per wavelength Task Force closing report |
|
|
Attachment B25 |
|
IEEE P802.3cv Maintenance #15: Power over Ethernet Task Force opening report |
|
|
Attachment B26 |
|
IEEE P802.3cv Maintenance #15: Power over Ethernet Task Force closing report |
|
|
Attachment B27 |
|
IEEE 802.3 Greater than 10 Gb/s Automotive Ethernet Electrical PHYs Study Group opening report |
|
|
Attachment B28 |
|
IEEE 802.3 Greater than 10 Gb/s Automotive Ethernet Electrical PHYs Study Group closing report |
|
|
Attachment B29 |
|
IEEE 802.3 Multi Gigabit Automotive Optical PHY Study Group opening report opening report |
|
|
Attachment B30 |
|
IEEE 802.3 Multi Gigabit Automotive Optical PHY Study Group opening report closing report |
|
|
Attachment B31 |
|
IEEE 802.3 Improving PTP Timestamping Accuracy Study Group opening report |
|
|
Attachment B32 |
|
IEEE 802.3 Improving PTP Timestamping Accuracy Study Group closing report |
|
|
Attachment B33 |
|
IEEE 802.3 10SPE Multidrop Enhancements Study Group opening report |
|
|
Attachment B34 |
|
IEEE 802.3 10SPE Multidrop Enhancements Study Group closing report |
|
|
Attachment B35 |
|
SCC18 ad hoc closing report |
|
|
Attachment B36 |
|
Industry Connections New Ethernet Applications opening report |
|
|
Attachment B37 |
|
Industry Connections New Ethernet Applications closing report |
|
|
Attachment B38 |
|
Call-for-Interest: 100 Gb/s per Wavelength Short Reach PHYs closing report |
|
|
Attachment B39 |
|
Call-for-Interest: Hybrid (optical/electrical) automotive Ethernet Links closing report |
|
|
Liaison Attachments (External and Internal) |
|
Attachment C1 |
|
ISO/IEC SC25/WG3 Liaison report to IEEE 802.3 |
|
|
Attachment C2 |
|
TIA TR-42 Liaison Report to IEEE 802.3 |
|
|
Attachment C3 |
|
ISO/IEC JTC 1/SC 25/WG 3 liaison to IEEE 802.3 on ISO/IEC TR 11801-9906 |
|
|
|
Attachment C4 |
|
ITU-T SG15 to IEEE 802.3 regarding OTNT Standardarization Work Plan
Attachment (Password protected) |
|
|
|
Attachment C5 |
|
OIF to IEEE P802.3ck regarding progress on CEI-112G-VSR and CEI-112G-LR projects
Attachment (Password protected) |
|
|
|
Attachment C6 |
|
ITU JCA-IMT2020: Invitation to update IMT2020 roadmap |
|
|
|
Attachment C7 |
|
ITU-T SG15: Coordination of Ethernet information and data modelling
Attachment (Password protected) |
|
|
|
Attachment C8 |
|
ITU-T SG15: 100 Gbit/s and 400 Gbit/s DWDM issues |
|
|
|
Attachment C9 |
|
OIF to IEEE P802.3ct regarding progress on OIF 400ZR project
Attachment (Password protected)
|
|
|
|
Attachment C10 |
|
ISO/IEC JTC 1/SC 25/WG 3 to IEEE 802.3 on remote powering
Attachment (Password protected)
|
|
|
|
Attachment C11 |
|
DRAFT Liaison to ISO/IEC JTC1 SC 6 on the availability of IEEE drafts |
|
|
Attachment C12 |
|
DRAFT Liaison to ITU-T SG15 on coordination between P802.3cs Q2/SG15 project G.9807.3 |
|
|
Attachment C13 |
|
DRAFT Liaison to ITU-T Study Group 15 concerning P802.3ct status |
|
|
Attachment C14 |
|
Liaison to ISO/IEC JTC1 SC 6 on the availability of IEEE drafts |
|
|
Attachment C15 |
|
Liaison to ITU-T SG15 on coordination between P802.3cs Q2/SG15 project G.9807.3 |
|
|
Attachment C16 |
|
Liaison to ITU-T Study Group 15 concerning P802.3ct status |
|