Administrative attachments |
|
Attachment A1 |
|
IEEE 802.3 Opening agenda |
|
Attachment A2 |
|
IEEE 802.3 Mid-session agenda |
|
Attachment A3 |
|
IEEE 802.3 Closing agenda |
|
Attachment A4 |
|
IEEE 802.3 Opening report |
|
Attachment A5 |
|
IEEE 802.3 Mid-session report |
|
Attachment A6 |
|
IEEE 802.3 Closing report |
|
Attachment A7 |
|
IEEE 802.3 Meeting attendance procedures |
|
Attachment A8 |
|
IEEE 802.3 Voters list |
|
Attachment A9 |
|
IEEE 802.3 Membership list |
|
Attachment A10 |
|
IEEE 802.3 Potential voter list |
|
Attachment A11 |
|
IEEE 802.3 Voters in peril |
|
Attachment A12 |
|
IEEE 802.3 Attendance credit summary, November 2018 to November 2020 |
|
Attachment A13 |
|
IEEE 802.3 Attendance list November 2020 Plenary Teleconference Rev2 |
|
Attachment A14 |
|
IEEE 802.3 Treasury Report |
|
Attachment A15 |
|
IEEE 802.3 Future meetings closing report
|
|
Attachment A16 |
|
IEEE 802.3 PARs Ad Hoc closing report
|
|
Attachment A17 |
|
TIA TR42 Report to IEEE 802.3
|
|
Task Force and Study Group attachments |
|
Attachment B1 |
|
IEEE 802.3 Maintenance opening report |
|
Attachment B2 |
|
IEEE 802.3 Maintenance closing report |
|
Attachment B3 |
|
IEEE P802.3ck 100 Gb/s, 200 Gb/s, and 400 Gb/s Electrical Interfaces Task Force opening report |
|
Attachment B4 |
|
IEEE P802.3cp Bidirectional 10 Gb/s, 25 Gb/s, and 50 Gb/s Optical Access PHYs Task Force opening report |
|
Attachment B5 |
|
IEEE P802.3cp Bidirectional 10 Gb/s, 25 Gb/s, and 50 Gb/s Optical Access PHYs Task Force closing report |
|
Attachment B6 |
|
IEEE P802.3cr Isolation (Maintenance #14) Task Force opening report |
|
Attachment B7 |
|
IEEE P802.3cr Isolation (Maintenance #14) Task Force closing report |
|
Attachment B8 |
|
IEEE P802.3cs Increased-reach Ethernet optical subscriber access (Super-PON) Task Force opening report |
|
Attachment B9 |
|
IEEE P802.3ct/cw Joint Task Force opening report |
|
Attachment B10 |
|
IEEE P802.3cu 100 Gb/s and 400 Gb/s over SMF at 100 Gb/s per wavelength Task Force opening report |
|
Attachment B11 |
|
IEEE P802.3cu 100 Gb/s and 400 Gb/s over SMF at 100 Gb/s per wavelength Task Force closing report |
|
Attachment B12 |
|
IEEE P802.3cv Maintenance #15: Power over Ethernet Task Force opening report |
|
Attachment B13 |
|
IEEE P802.3cx Improved PTP timestamping accuracy Task Force opening report |
|
Attachment B14 |
|
IEEE P802.3cy Greater than 10 Gb/s Electrical Automotive Ethernet Task Force opening report |
|
Attachment B15 |
|
IEEE P802.3cz Multi-Gigabit Optical Automotive Ethernet Task Force opening report |
|
Attachment B16 |
|
IEEE P802.3da 10 Mb/s Single Pair Multidrop Segments Enhancement Task Force opening report |
|
Attachment B17 |
|
IEEE P802.3db 100 Gb/s, 200 Gb/s, and 400 Gb/s Short Reach Fiber Task Force opening report |
|
Attachment B18 |
|
IEEE P802.3db 100 Gb/s, 200 Gb/s, and 400 Gb/s Short Reach Fiber Task Force closing report |
|
Attachment B19 |
|
Industry Connections New Ethernet Applications opening report |
|
Attachment B20 |
|
PDCC Ad Hoc closing report |
|
Attachment B21 |
|
Beyond 400 Gb/s CFI opening report |
|
Liaison Attachments (External and Internal) |
|
Attachment C1 |
|
GEN Z Consortium to IEEE 802.3 requesting MOU
|
|
Attachment C2 |
|
COBO Liaison to IEEE 802.3 – CPO and IEEE P802.3ck
|
|
Attachment C3 |
|
Draft liaison from IEEE 802.3 to ITU-T SG15 regarding IEEE P802.3cs
|
|
Attachment C4 |
|
Draft liaison from IEEE 802.3 to ITU-T SG15 regarding appointment of liaison officer
|
|
Attachment C5 |
|
Draft liaison from IEEE 802.3 to OIF on the status of P802.3ck
|
|
Attachment C6 |
|
Draft liaison from IEEE 802.3 to Gen-Z Consortium on the status of P802.3ck
|
|
Attachment C7 |
|
Draft liaison from IEEE 802.3 to INCITS T11.2 on the status of P802.3ck
|
|
Attachment C8 |
|
Draft liaison from IEEE 802.3 to COBO on the status of P802.3ck
|
|
Attachment C9 |
|
Draft liaison from IEEE 802.3 to ISO/IEC JTC 1 SC 6 regarding the China NB comments on IEEE Std 802.3-2018 FDIS ballot
|
|
Attachment C10 |
|
Draft liaison from IEEE 802.3 to ISO/IEC JTC 1 SC 6 regarding the availability of IEEE 802.3 drafts
|
|
Attachment C11 |
|
IEEE 802.3 to ITU-T SG15 regarding IEEE P802.3cs
|
|
Attachment C12 |
|
IEEE 802.3 to ITU-T SG15 regarding appointment of liaison officer
|
|
Attachment C13 |
|
IEEE 802.3 to OIF on the status of P802.3ck
|
|
Attachment C14 |
|
IEEE 802.3 to Gen-Z Consortium on the status of P802.3ck
|
|
Attachment C15 |
|
IEEE 802.3 to INCITS T11.2 on the status of P802.3ck
|
|
Attachment C16 |
|
IEEE 802.3 to COBO on the status of P802.3ck
|
|
Attachment C17 |
|
IEEE 802.3 to ISO/IEC JTC 1 SC 6 regarding the China NB comments on IEEE Std 802.3-2018 FDIS ballot
|
|
Attachment C18 |
|
IEEE 802.3 to ISO/IEC JTC 1 SC 6 regarding the availability of IEEE 802.3 drafts
|