IEEE 802.3 November 2021 Plenary Minutes

8 to 18 November, 2021
Telephonic



Minutes

Approved Minutes, IEEE 802.3 Ethernet Working Group Plenary 8 to 18 November, 2021, Telephonic

Administrative attachments

Attachment A1
IEEE 802.3 Opening agenda

Attachment A2
IEEE 802.3 Mid-session agenda

Attachment A3
IEEE 802.3 Closing agenda

Attachment A4
IEEE 802.3 Opening report

Attachment A5
IEEE 802.3 Mid-session report

Attachment A6
IEEE 802.3 Closing report

Attachment A7
IEEE 802.3 Meeting attendance procedures

Attachment A8
IEEE 802.3 Voters list

Attachment A9
IEEE 802.3 Membership list

Attachment A10
IEEE 802.3 Potential voter list

Attachment A11
IEEE 802.3 Voters in peril

Attachment A12
IEEE 802.3 Attendance credit summary, November 2019 to September 2021

Attachment A13
IEEE 802.3 Attendance list November 2021 Plenary Teleconference

Attachment A14
IEEE 802.3 Treasury Report

Attachment A15
IEEE 802.3 Future meetings closing report

Attachment A16
TIA TR42 Report to IEEE 802.3

Attachment A17
IEEE 802.3 Rules opening report

Attachment A18
IEEE 802.3 Rules closing report

Attachment A19
IEEE 802 LAN/MAN standards committee Milestone Project

Task Force and Study Group attachments

Opening plenary meeting reports


Attachment B1
IEEE 802.3 Maintenance opening report

Attachment B2
IEEE P802.3cx Improved PTP timestamping accuracy Task Force report

Attachment B3
IEEE P802.3cy Greater than 10 Gb/s Electrical Automotive Ethernet Task Force report

Attachment B4
IEEE P802.3cz Multi-Gigabit Optical Automotive Ethernet Task Force report

Attachment B5
IEEE P802.3db 100 Gb/s, 200 Gb/s, and 400 Gb/s Short Reach Fiber Task Force report

Attachment B6
IEEE 802.3 Greater than 10 Mb/s Long-Reach Single Pair Ethernet Study Group report

Mid-session plenary meeting reports


Attachment B7
IEEE P802.3ck 100 Gb/s, 200 Gb/s, and 400 Gb/s Electrical Interfaces Task Force opening report

Attachment B8
IEEE P802.3cs Increased-reach Ethernet optical subscriber access (Super-PON) Task Force opening report

Attachment B9
IEEE P802.3cw 400 Gb/s over DWDM systems report

Attachment B10
IEEE P802.3da 10 Mb/s Single Pair Multidrop Segments Enhancement Task Force report

Attachment B11
IEEE P802.3dd Power over Data Lines of Single Pair Ethernet (Maintenance #17) Task Force report

Attachment B12
IEEE P802.3de Time Synchronization for Point-to-Point Single Pair Ethernet Task Force opening report

Attachment B13
IEEE Beyond 400 Gb/s Ethernet Study Group opening report

Closing plenary meeting reports


Attachment B14
IEEE 802.3 Maintenance closing report

Attachment B15
IEEE P802.3ck 100 Gb/s, 200 Gb/s, and 400 Gb/s Electrical Interfaces Task Force closing report

Attachment B16
IEEE P802.3cs Increased-reach Ethernet optical subscriber access (Super-PON) Task Force closing report

Attachment B17
IEEE P802.3dd Power over Data Lines of Single Pair Ethernet (Maintenance #17) Task Force closing report

Attachment B18
IEEE P802.3de Time Synchronization for Point-to-Point Single Pair Ethernet Task Force closing report

Attachment B19
IEEE Beyond 400 Gb/s Ethernet Study Group closing report

Attachment B20
IEEE 802.3 Greater than 10 Mb/s Long-Reach Single Pair Ethernet Study Group closing report

Liaison Attachments (External and Internal)

Attachment C1
TIA TR-42 to IEEE 802.3 on the use of test method FOTP-455-54 (FOTP 54)


Attachment C2
OIF to IEEE: 400ZR IA Maintenance Project update
Attachment (Password protected)


Attachment C3
OIF to IEEE: 800G Coherent Project Status

Attachment C4
ITU-T SG15 to IEEE: Initiation of work on greater than 50G Bidirectional Optics

Draft Outgoing Liaison Letters

Attachment D1
Draft: IEEE 802.3 to TIA TR-42 reply on the use of test method TIA-455-54 (FOTP 54)


Attachment D2
Draft: IEEE 802.3 to IEEE 1588 on the status of P802.3cx


Attachment D3
Draft: IEEE 802.3 to ITU-T SG15 Q13 on the status of P802.3cx


Attachment D4
Draft: IEEE 802.3 to ISO/IEC JTC1/SC25 WG3 as a repy to incoming liaison 3N1300, multidrop cabling


Attachment D5
DRAFT: IEEE 802.3 to ITU-T SG15 on the status of P802.3cw


Attachment D6
DRAFT: IEEE 802.3 to OIF on the status of P802.3cw


Attachment D7
Draft: IEEE 802.3 to ISO/IEC JTC1/SC25 WG3 as a repy to incoming liaison 3N1299, demating under load


Attachment D8
Draft: IEEE 802.3 to ITU-T SG15 in response to Liaison on HNT standardization work plan


Attachment D9
Draft: IEEE 802.3 to ITU-T SG15 in response to Liaison on ANT standardization work plan


Attachment D10
Draft: IEEE 802.3 to ITU-T SG15 in response to Liaison on OTNT standardization work plan


Attachment D11
Draft: IEEE 802.3 to ISO/IEC JTC 1 SC 6: reply to China NB comments on ballots


Attachment D12
DRAFT: IEEE 802.3 to OIF on the status of P802.3ck


Attachment D13
DRAFT: IEEE 802.3 to COBO on the status of P802.3ck


Attachment D14
DRAFT: IEEE 802.3 to INCITS T11.2 on the status of P802.3ck


Attachment D15
Draft: IEEE 802.3 to ITU-T SG15 on coordination between the IEEE P802.3cs task force and Q2/SG15 project G.9807.3


Attachment D16
Draft: IEEE 802.3 to ITU-T SG15: reply to Liaison #SG15-LS324 “LS/r on OTN support of Ethernet clients beyond 400 Gb/s”


Attachment D17
Draft: IEEE 802.3 to OIF: reply to Liaison “800G Coherent Project Status”


Final Outgoing Liaison Letters

Attachment E1
IEEE 802.3 to TIA TR-42 reply on the use of test method TIA-455-54 (FOTP 54)


Attachment E2
IEEE 802.3 to IEEE 1588 on the status of P802.3cx


Attachment E3
IEEE 802.3 to ITU-T SG15 Q13 on the status of P802.3cx


Attachment E4
IEEE 802.3 to ISO/IEC JTC1/SC25 WG3 as a repy to incoming liaison 3N1300, multidrop cabling


Attachment E5
IEEE 802.3 to ITU-T SG15 on the status of P802.3cw


Attachment E6
IEEE 802.3 to OIF on the status of P802.3cw


Attachment E7
IEEE 802.3 to ISO/IEC JTC1/SC25 WG3 as a repy to incoming liaison 3N1299, demating under load


Attachment E8
IEEE 802.3 to ITU-T SG15 in response to Liaison on HNT standardization work plan


Attachment E9
IEEE 802.3 to ITU-T SG15 in response to Liaison on ANT standardization work plan


Attachment E10
IEEE 802.3 to ITU-T SG15 in response to Liaison on OTNT standardization work plan


Attachment E11
IEEE 802.3 to ISO/IEC JTC 1 SC 6: reply to China NB comments on ballots


Attachment E12
IEEE 802.3 to OIF on the status of P802.3ck


Attachment E13
IEEE 802.3 to COBO on the status of P802.3ck


Attachment E14
IEEE 802.3 to INCITS T11.2 on the status of P802.3ck


Attachment E15
IEEE 802.3 to ITU-T SG15 on coordination between the IEEE P802.3cs task force and Q2/SG15 project G.9807.3


Attachment E16
IEEE 802.3 to ITU-T SG15: reply to Liaison #SG15-LS324 “LS/r on OTN support of Ethernet clients beyond 400 Gb/s”


Attachment E17
IEEE 802.3 to OIF: reply to Liaison “800G Coherent Project Status”


Return to IEEE 802.3 Minutes page
Last Update: 4-Apr-22


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]