IEEE 802.3 September 2018 Interim Minutes
13 September, 2018
Spokane, WA, USA
Minutes
Approved Minutes, IEEE 802.3 Ethernet Working Group Interim, Spokane, 13 September, 2018
Administrative attachments
Attachment A1
IEEE 802.3 Interim agenda
Attachment A2
IEEE 802.3 Interim slides
Attachment A3
IEEE 802.3 Voting member list
Attachment A4
IEEE 802.3 Membership list
Attachment A5
Working Group meeting attendance list
Attachment A6
IEEE 802.3 Attendance list Spokane
Attachment A7
IEEE 802.3 Meetings report
,  
September 2019 offer
Task Force and Study Group attachments
Attachment B1
IEEE P802.3cd 50Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force report
Attachment B2
Industry Connections New Ethernet Applications report
Attachment B3
IEEE 802.3 SCC18 Ad Hoc report
Liaison Attachments (External and Internal)
Attachment C1
ISO/IEC SC25/WG3 report to IEEE 802.3
Attachment C2
OIF to IEEE 802.3 on the completion of the FlexE 2.0 IA
Attachment C3
ISO/IEC SC25/WG3 to IEEE 802.3 on connecting hardware for single pair cabling
Attachment C4
OIF to IEEE 802.3 regarding 400ZR Interop Project
Attachment
(Password protected)
Attachment C5
Broadband Forum to IEEE 802.3 regarding YANG best practices
Attachment
(Password protected)
Attachment C6
Ethernet Alliance to IEEE 802.3 regarding PoE certification program
Attachment C7
DRAFT liaison to ITU-T SG15 on the ANT workplan
Attachment C8
DRAFT liaison to ITU-T SG15 on the HNT workplan
Attachment C9
DRAFT liaison to ITU-T SG15 on the OTNT workplan
Attachment C10
DRAFT liaison to the MIPI Alliance on information exchange
Attachment C11
DRAFT liaison to the Broadband Forum regarding YANG best current practices
Attachment C12
DRAFT liaison to ITU-T SG15 regarding the P802.3cn project
Attachment C13
DRAFT liaison to OIF regarding the P802.3cn project
Attachment C14
DRAFT liaison to OIF regarding the P802.3cd project
Attachment C15
DRAFT liaison to ITU-T on Ethernet Bandwidth Assessment
Attachment C16
DRAFT liaison to Euro-IX on Ethernet Bandwidth Assessment
Attachment C17
DRAFT liaison to CableLabs on Ethernet Bandwidth Assessment
Attachment C18
DRAFT liaison to everyone on Ethernet Bandwidth Assessment
Attachment C19
DRAFT liaison to the Ethernet Alliance on PoE Certification Program
Attachment C20
Liaison to ITU-T SG15 on the ANT workplan
Attachment C21
Liaison to ITU-T SG15 on the HNT workplan
Attachment C22
Liaison to ITU-T SG15 on the OTNT workplan
Attachment C23
Liaison to the MIPI Alliance on information exchange
Attachment C24
Liaison to the Broadband Forum regarding YANG best current practices
Attachment C25
Liaison to ITU-T SG15 regarding the P802.3cn project
Attachment C26
Liaison to OIF regarding the P802.3cn project
Attachment C27
Liaison to OIF regarding the P802.3cd project
Attachment C28
Liaison to ITU-T on Ethernet Bandwidth Assessment
Attachment C29
Liaison to Euro-IX on Ethernet Bandwidth Assessment
Attachment C30
Liaison to CableLabs on Ethernet Bandwidth Assessment
Attachment C31
Liaison to everyone on Ethernet Bandwidth Assessment
Attachment C32
Liaison to the Ethernet Alliance on PoE Certification Program
Return to IEEE 802.3 Minutes page
Last Update: 14-Nov 2018