IEEE 802.3 September 2018 Interim Minutes

13 September, 2018
Spokane, WA, USA





Minutes

Approved Minutes, IEEE 802.3 Ethernet Working Group Interim, Spokane, 13 September, 2018


Administrative attachments

Attachment A1
IEEE 802.3 Interim agenda

Attachment A2
IEEE 802.3 Interim slides

Attachment A3
IEEE 802.3 Voting member list

Attachment A4
IEEE 802.3 Membership list

Attachment A5
Working Group meeting attendance list

Attachment A6
IEEE 802.3 Attendance list Spokane

Attachment A7
IEEE 802.3 Meetings report,   September 2019 offer

Task Force and Study Group attachments

Attachment B1
IEEE P802.3cd 50Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force report

Attachment B2
Industry Connections New Ethernet Applications report

Attachment B3
IEEE 802.3 SCC18 Ad Hoc report

Liaison Attachments (External and Internal)

Attachment C1
ISO/IEC SC25/WG3 report to IEEE 802.3

Attachment C2
OIF to IEEE 802.3 on the completion of the FlexE 2.0 IA

Attachment C3
ISO/IEC SC25/WG3 to IEEE 802.3 on connecting hardware for single pair cabling

Attachment C4

OIF to IEEE 802.3 regarding 400ZR Interop Project
Attachment (Password protected)

Attachment C5

Broadband Forum to IEEE 802.3 regarding YANG best practices
Attachment (Password protected)


Attachment C6
Ethernet Alliance to IEEE 802.3 regarding PoE certification program

Attachment C7
DRAFT liaison to ITU-T SG15 on the ANT workplan

Attachment C8
DRAFT liaison to ITU-T SG15 on the HNT workplan

Attachment C9
DRAFT liaison to ITU-T SG15 on the OTNT workplan

Attachment C10
DRAFT liaison to the MIPI Alliance on information exchange

Attachment C11
DRAFT liaison to the Broadband Forum regarding YANG best current practices

Attachment C12
DRAFT liaison to ITU-T SG15 regarding the P802.3cn project

Attachment C13
DRAFT liaison to OIF regarding the P802.3cn project

Attachment C14
DRAFT liaison to OIF regarding the P802.3cd project

Attachment C15
DRAFT liaison to ITU-T on Ethernet Bandwidth Assessment

Attachment C16
DRAFT liaison to Euro-IX on Ethernet Bandwidth Assessment

Attachment C17
DRAFT liaison to CableLabs on Ethernet Bandwidth Assessment

Attachment C18
DRAFT liaison to everyone on Ethernet Bandwidth Assessment

Attachment C19
DRAFT liaison to the Ethernet Alliance on PoE Certification Program

Attachment C20
Liaison to ITU-T SG15 on the ANT workplan

Attachment C21
Liaison to ITU-T SG15 on the HNT workplan

Attachment C22
Liaison to ITU-T SG15 on the OTNT workplan

Attachment C23
Liaison to the MIPI Alliance on information exchange

Attachment C24
Liaison to the Broadband Forum regarding YANG best current practices

Attachment C25
Liaison to ITU-T SG15 regarding the P802.3cn project

Attachment C26
Liaison to OIF regarding the P802.3cn project

Attachment C27
Liaison to OIF regarding the P802.3cd project

Attachment C28
Liaison to ITU-T on Ethernet Bandwidth Assessment

Attachment C29
Liaison to Euro-IX on Ethernet Bandwidth Assessment

Attachment C30
Liaison to CableLabs on Ethernet Bandwidth Assessment

Attachment C31
Liaison to everyone on Ethernet Bandwidth Assessment

Attachment C32
Liaison to the Ethernet Alliance on PoE Certification Program


Return to IEEE 802.3 Minutes page
Last Update: 14-Nov 2018


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]