Hi David and all,

Among the other test method for Midspan ALT A that my team is developing
now to check the BLW effect, I am checking the following approach too:

Step 1: Measure the BER for a standard compliant 100BT system without
compensation techniques. (Just what is specified in 802.3 (
Step 2: Transmit "killer packets" per Dan's input. Measure the BER
again.

The BER resulted in step 2 is the worst case acceptable BER.
If Midspan ALT A is inserted, the BER measured in step 2 shall not
exceed the result in step 2.

Rational:

In standard compliant system including standard components (Switch with
350uH magnetics that meets the requirements + Channel+PD) the system is
required to operate under the "killer packets" which was described in
the past and treated in 802.3.

Now if a Midspan is inserted, if anything is wrong e.g. lower impedance
or inductance etc. it will affect the BER worst case number defined in
the REFERENCE compliant channel under the operating conditions if
"killer packets"

Yair



-----Original Message-----
From: owner-stds-802-3-poep@IEEE.ORG
[mailto:owner-stds-802-3-poep@IEEE.ORG] On Behalf Of David Law
Sent: Thursday, January 10, 2008 3:38 PM
To: STDS-802-3-POEP@LISTSERV.IEEE.ORG
Subject: Re: [8023-POEP] Baseline Bucket ad hoc

Hi Yair,

I agree that the aim with all this is to ensure that inserting a ALT A 
Midspan into any 100BASE-T link has no impact on the BER of the link. To

me the question is how to specify this requirement in an interoperable
and 
testable way. The approach of specifying a transfer function from 1MHz 
down to TDB Hz was what we came up with when talking about this on the 
350uH call - I guess because there was a belief that reference to
cabling 
standards can be used to provide specification of the ALT A Midspan 
performance above 1MHz.

Regards,
  David


owner-stds-802-3-poep@LISTSERV.IEEE.ORG wrote on 10/01/2008 12:24:38:

> Hi Dan and all,

> 
> My team is working on the following action items:

> 
> 1. Checking ALT A with the "killer packet" to check the impact of
> BLW on the BER.
> 2. To generate a Transfer function for a Midspan between TBDHz to
> 1MHz.

> 
> We started with item 2 and I hope to present data by next meeting.

> Regarding Item 1 we are designing now the test setup for having enough
> data for recommending the best course of action.

> 
> I would like to have your opinion on the following:

> 
> The reason we are checking the behavior of a channel containing ALT A
> Midspan is because we assume that it will affect the channel behavior
at
> frequencies lower then 1MHz when we suppose to find the BLW
frequencies.

> My question is: If our ultimate goal per the 350uH Ad Hoc is to ensure
> meeting the minimum BER required so implementation will be transparent
> i.e. 350uH minimum inductance will be only one way to achieve it and
> other ways are possible, THEN meeting BER means also the effect on BER
> due too BLW.

> If this is true, then why we care what is the Midspan transfer
function
> at this low frequency band. If inserting the Midspan to a compliant
> Switch+channel+PD (i.e. a channel designed according 802.3 guidelines
> without compensation techniques etc. such as using 100BT SmartBit
> generator and standard channel and load)   and the BER test pass then
> the Midspan is compliant if it fails it is not compliant hence how the
> Midspan did it we don't care and we don't have to specify anything
new.

> Please let me know your opinion.

> 
> Thanks

> 
> Yair

> 
> ________________________________

> From: Dove, Dan [mailto:dan.dove@hp.com]
> Sent: Wednesday, January 09, 2008 8:00 PM
> To: Darshan, Yair; STDS-802-3-POEP@LISTSERV.IEEE.ORG
> Subject: RE: [8023-POEP] Baseline Bucket ad hoc

> 
> Yair,

> 
> At the last meeting you mentioned that you had tested 100BASE-T with
> inline power on the data pairs and found no problems. During an
offline
> discussion, we discussed performing testing with maximum length cables
> and the "Killer Packet" to ensure that your testing did not miss the
> impact of baseline wander on your testing. To assist, I sent you a
copy
> of the Killer Packet (zipped binary) to enhance your testing.

> 
> Have you had an opportunity to evaluate the impact of inserting power
> into the data pairs using the Killer Packet since our discussion and
do
> you plan to present on this?

> 
> I think it would be important to ensure that we fully characterize the
> exposure of inserting any additional low-frequency poles into the
> channel on 100BASE-T signal impairments.

> 
> Thanks,

> Dan

> 
> ________________________________

> From: owner-stds-802-3-poep@IEEE.ORG
> [mailto:owner-stds-802-3-poep@IEEE.ORG] On Behalf Of Darshan, Yair
> Sent: Monday, January 07, 2008 1:37 AM
> To: STDS-802-3-POEP@LISTSERV.IEEE.ORG
> Subject: Re: [8023-POEP] Baseline Bucket ad hoc

> Hi Matt,

> 
> Probably you didn't see my email which I ask not to have meetings on
> Friday. Friday and Saturday are a non working days here like Saturday
> and Sunday' in North America.

> Any way, please find below my comments/opinion regarding the base line
> bucket:

> 
> Comment #141:

> Comment #141 deals with "Range of Maximum power used by the PD".

> The commenter state that this column has no value and I disagree with
> him.

> This column has value in which it specifies the range of maximum for
> better power management.

> It is true that when you are using L2 you may not need this
information
> however when using only L1, this information has value.

> 
> Regarding the argument that it confuses the average reader with the
> minimum power required to keep the port ON, I don't see how it
confused
> since the text is clear and if it still confuse we can add
clarification
> but it is not justifying changing the level of information contained
in
> this column.

> 
> I suggest rejecting this comment or ad clarification for the use of it
> in respect to 33.3.6.

> 
> Comment #124:

> 
> The commenter is basing his argument on the following assumptions:

> 1. The existing PD detection section requires specific design
> requirements that are not necessary to ensure interoperability: This
is
> not accurate statement. All the requirements in the specification are
a
> result of extensive analysis and tests. Each of the requirements came
to
> ensure interoperability.

> The change it or modify it we need to td feasibility and economical
> tests/simulations. Non of it has been shown or demonstrated.

> 2. Pointing out to presentation made in September 2005: This
> presentation was "rejected in principle" by the audience at that
meeting
> since it failed to accommodate false positive detection due to the
time
> constant issue. Specifically, the standard recommend to take
> measurements after 5tau=1% of steady state in order to reduce the
chance
> for false positive detection. So this presentation is a good example
for
> what we should not do. There are other detection concepts that were
> discussed such as capacitor detection, AC coupled diode and other and
> the resistor concept was chosen as the preferred one which meets all
> objectives at low cost and high reliability.
> 3. Figure 33-10 is no the PD model so it is not clear why it is
> related to detection issues as stated in the Suggested Remedy.
> 4. Requiring PSE to detect values of Rpd_d for all permissible
> values of Cpd_d as specified in Table 33-2 is not practical and it is
> not required by the standard today. It adds unnecessary burden to the
> implementers with increased time constant problems.

> Rational:

> The current specification required to meet Rpd_d together with
> Cpd_d<0.15UF. This is possible and proven feasible.

> Requiring meeting Rpd_d with Cpd_d>>0.15UF is technically problematic
> due to long time constants and false positive detection risks. There
is
> a way to overcome this problem by using ac signals with source and
sink
> capabilities however it requires technical and economical feasibility
> tests which if somebody present such it will be easier to consider and
> asses its technical and economical aspects.

> 5. To delete the requirement of two point detection it requires to
> show that you can detect Rsig with out errors within single
measurement.
> This is not an implementation issue. It is clear interoperability
issue.
> If somebody can technically and economically prove that it can be done
> in other ways he is welcome.

> 
> I suggest rejecting this comment unless serious technical work will be
> presented to backup the changes suggested.

> 
> Comment #13:

> 
> This comment is similar in principle to comment #124.

> Figures 33-8 and 33-9 are not mandating implementations.

> It guarantees interoperability.

> Figure 33-8:

> 1. Zsource>45K: Limiting energy backwards to PSE.
> 2. Zsource>45K : Preventing 25K signature if two PSEs are connected
> together
> 3. Vdetect and Zsource>45K allows meeting 30V open loop and 2.8-10V
> during valid signature with adequate resolution
> 4. D1: Prevents two PSEs connected together in opposite voltage
> polarity to generate 25K signature
> 5. D1: Prevents two PSEs connected together in opposite voltage
> polarity to generate 120V on the port/chips.

> 
> Figure 33-9:

> 6. Zsource not limited, with series diode D2: Limiting energy
> backwards to PSE.
> 7. D1: Prevents two PSEs connected together in opposite voltage
> polarity to generate 25K signature
> 8. D1: Prevents two PSEs connected together in opposite voltage
> polarity to generate 120V on the port/chips.

> 
> The implementer can use any Thevenin equivalent of figures 33-8 or
> 33-9 which allows the flexibility which we are looking for.

> 
> In order to allow such big changes it is requires proving feasibility
> with different PSEs using different methods complying to the suggested
> remedy......!!!

> 
> Unless such proofs made I suggest to reject this comment.

> 
> Yair

> 
> ________________________________

> From: owner-stds-802-3-poep@IEEE.ORG
> [mailto:owner-stds-802-3-poep@IEEE.ORG] On Behalf Of D. Matthew Landry
> Sent: Friday, January 04, 2008 4:16 PM
> To: STDS-802-3-POEP@LISTSERV.IEEE.ORG
> Subject: Re: [8023-POEP] Baseline Bucket ad hoc

> 
> Please find attached material for discussion during this morning's
> baseline bucket ad hoc.

> Note in the meeting notice below, the 11:00AM starting time is Central
> Standard Time.

> -matt

> On Dec 11, 2007 11:53 AM, D. Matthew Landry < dmlandry@ieee.org>
wrote:

> Colleagues -

> This message is announcing a comment resolution adhoc to discuss the
> remaining comments classified in the baseline bucket. This meeting
will
> be administered by teleconference. Required materials will be sent
prior
> to commencement of the meeting. The bucket of comments can be found at
> the following URL:

>
http://www.ieee802.org/3/at/comments/D1.0/P802d3at_D1p0_postmtg_bucket_b
> aseline.pdf

> Please take some time to review the IEEE-SA PatCom slides prior to the
> start of the telecon. I will ask if anyone has not reviewed the slides
> at the beginning of the call. If any attendees indicate that they have
> not reviewed the slides, time will be made available for such review.
> The slideset can be found at the following URL:

> http://standards.ieee.org/board/pat/pat-slideset.pdf

> The dial-in information is found at the end of this email. If you plan
> to attend, I ask that you RSVP  no later than the day before so that I
> can ensure that enough dial-in slots are available.

> Thank you.

> - matt

> 
> TELECONFERENCE DETAILS

> Subject:
> IEEE 802.3at baseline bucket
> Meeting ID:
> 802302
> Date/time:
> 01/04/2008, 11:00 AM (US: Central (CST/CDT))
> 01/11/2008, 11:00 AM (US: Central (CST/CDT))
> Duration:
> 1 hrs 30 minutes
> Dial-in:
> International: 1.512.532.5999
> USA: 1.866.781.8274
> 
> [attachment "C.htm" deleted by David Law/GB/3Com]