Rick Brooks wrote:
>
> I wanted to add a few things to you list.
>
> 1) goal: achieve the lowest possible cost at the DTE load end:
> a) possibly allow for non-isolated DC/DC converter (in those cases where safety rules allow this)
> b) simplest lowest cost identity network at the DTE load end
Depends on the application. For an application for which there are many
DTEs for a single switch port, this might be true. But for a great many
applications, e.g. a desktop IP telephone, this is not true. The owner
must pay for the equipment at both ends of the wire. Why is there a
particular need to bias the costs toward one end of the wire or the other?
(: Yes, I understand that the switch end typically is serving a number of
wires. I'm talking about the per-port cost. :)
-- Norm