Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

RE: DTE power sequencing




Hi Rick,

I have red your proposal and to my opinion it is really important to define
those parameters.
Please find below few changes that I am suggesting in order to support wider
types of applications.

Discovery time: up to 500mSec.
Ramp Up time: Up to 0.5sec. 
Power Up time: Up to 1sec.
( All of the above 3 parameters are important to support Power supplies with
long startup time due to very low startup current
  or power supplies that designed a specially to remote feeding applications
and includes Under Voltage lock out timers in it.)

Power Down Time: up to 0.5sec is O.K. if  not include the time needed to the
power supply input capacitor
to discharges when the input voltage is below the under voltage setting
point. This alone could took few seconds in some applications.

Regards
Yair.

Darshan Yair
Chief  R&D  Engineer 
> PowerDsine Ltd.  -  Powering Converged Networks
> 1 Hanagar St., P.O. Box 7220
> Neve Ne'eman Industrial Zone
> Hod Hasharon 45421, Israel
Tel:  +972-9-775-5100, Cell: +972-54-893019
Fax: +972-9-775-5111
> E-mail: <mailto:yaird@xxxxxxxxxxxxxx>.    
> http://www.powerdsine.com
> 
> 
> 
> -----Original Message-----
> From:	Rick Brooks [SMTP:ribrooks@xxxxxxxxxxxxxxxxxx]
> Sent:	&bet; &alef;&vav;ℷ&vav;&samekh;&tet; 28 2000 22:12
> To:	stds-802-3-pwrviamdi@xxxxxxxx
> Subject:	DTE power sequencing
> 
> This message did not seem to go through the first time. 
> 
> 
> -----Original Message----- 
> From:   Brooks, Rick [SC5:321:EXCH] 
> Sent:   Monday, August 28, 2000 7:02 AM 
> To:     'stds-802-3-pwrviamdi@xxxxxxxx' 
> Subject:        DTE power sequencing 
> 
> Hi all, 
> I have put a short proposal together regarding the sequencing on and off
> of DTE power. 
> 
> It tries to define various time intervals which will be useful to us, and
> the customers of DTE power. 
> It covers both turning on power: (discovery and ramp up) as well as
> turning off power (disconnect recognition and ramp down)
> 
> I think that both are important and need to be covered. 
> 
> You can find this proposal at: 
> <http://www.ieee802.org/3/power_study/public/email_attach/power_sequence.p
> df> 
> 
> thanks, 
> - Rick 
>