Yair, Dave, All:

Technically, I don't challenge Yair's calculations, nor Dave's corroboration
of those calculations.  I do have concerns regarding many of the same system
issues as Dave raises, as well as one other.  That other is as follows:

Granted, we agreed in St. Louis to only specify single-port power-up time.
I do NOT take that to mean that most PSE vendors - or most PD users - will
be willing to wait until their port is serviced in what is now being
proposed as a round-robin one-at-a-time fashion, from a multiport PSE power
control IC.  To slow things to a 4-second average, 8-second worst-case PD
power-up is probably not our intention, no matter how precisely we pick at
the St. Louis wording. Even the 8-second timing given above is way too
generous, for it is necessary to keep in mind that the ~ 1 Joule figure
which Dave has given us is based on very low duty cycle (virtually
single-pulse events).  Eight such events in succession would be likely to
grossly overheat any reasonable IC package, and the contents thereof.

Peter Schwartz
Micrel Semiconductor
Phone:	408.435.2460
peter.schwartz@xxxxxxxxxx

	-----Original Message-----
	From:	Dave Dwelley [SMTP:ddwelley@xxxxxxxxxx]
	Sent:	Friday, June 15, 2001 9:23
	To:	Yair Darshan; 'Karl Nakamura'; 'Donald S. Stewart'; 'R
karam'; 'Rick Brooks'; 'Lynch, Brian'; 'Peter Schwartz';
'scott_burton@xxxxxxxxx'; 'Steve Carlson'; 'rk@xxxxxxxxxxxxxxx';
'mike_s_mccormack@xxxxxxxxxxx'; 'bruce.inn@xxxxxxxxxx';
'henryhinrichs@xxxxxxxxxxxx'; 'Jetzt, John J'
	Cc:	'stds-802-3-pwrviamdi@xxxxxxxx'
	Subject:	Re: Startup and PD input cap 

	Yair -

	Your numbers look good. I've been off-line for awhile, but I'm back
now, at 
	least briefly. Here's how I see it (technical first, political
second):

	The 1J number is pretty rough - it's taken off the SOA curves from a
couple 
	of typical, SO8 package FETs.* It does seem to be about right (or
even a 
	little conservative) for the type of packages that a PSE chip might
be 
	packaged in. Since we removed the requirement that multiple ports
power up 
	simultaneously at St. Louis, you're correct in saying that the "N"
number 
	in your equation is 1, not 8. My old 50uF number (actually 77uF) was
based 
	on N=8 - no longer necessary.

	Energy in the cap = 0.5*C*V^2

	-or-

	Max cap for 1J = 2/V^2 = 2/57^2 = 615uF, same as Yair's number.

	It's pretty clear that we can ramp this cap up in well under a
second, 
	leaving lots of time for detection and classification. Note also
that we're 
	not spec'ing ramp time to 57V (in the worst case) - only to 44V. If
max I 
	is 400mA and C=470u+20%, then:

	ramp up time = C*V/I = 564u*44/0.4 = 62ms

	Total energy (this time to 57V, which is what the FET could see
worst case:

	energy = 0.5*564u*57^2 = 0.92J, under 1J (barely).

	470u + 20% is OK from a thermal point of view if N=1. What is the
tolerance 
	of a typical 470u cap?

	* Note that I've seen several SOA curves which appear to be VERY 
	conservative, based on a single time constant model. They suggest
that the 
	FET is a constant power device below 100ms, not a constant energy
device. I 
	don't believe them.

	Now I'm going to take off my technical hat and put on my system
design hat...

	I still think it's a mistake to allow unlimited-inrush PDs! There
are 
	several complications that such devices bring up, like memory in the
PD 
	UVLO circuit, long short circuit timeouts in the PSE, possible large
dv/dt 
	on the wire when the PD UVLO comes on, and very large peak currents
at the 
	PD end of the wire (and the PD end RJ45 jack) when the PD UVLO comes
on 
	(before the PSE current limit circuit kicks in). I agree that the
circuity 
	in the phone is cheaper this way (slightly, and even less down the
road), 
	but I think the corresponding drawbacks make the spec weaker, and
invite 
	creative interpretation by marginal PD vendors that will cause 
	interoperability problems and may hinder widespread acceptance of
the spec.

	If we mandate inrush control in the PD in all cases, nearly every
one of 
	the above problems goes away, and interoperability is virtually
assured (at 
	least with regards to power!). There is additional cost in the PD,
but it 
	isn't much... and it the incremental cost will only drop. It's the
right 
	thing to do - even though it now has no impact on my ability to
integrate a 
	PSE chip.

	This is the last time I'm going to plead for this - if the consensus
is 
	that the cost savings in the PD is worth the hassle of PSE inrush,
I'll get 
	on the bus.

	Dave







	At 10:13 PM 6/14/2001 +0200, Yair Darshan wrote:
	>Guys
	>
	>I would like to have your comments for the following summary of the
	>calculation procedure for setting the max. PD input cap to be
handled by the
	>PSE.
	>
	>
	>Target:                 To make it possible to define more than
50uF as the
	>point in which the responsibility for inrush current limiting is
moved from
	>the PSE to the PD.
	>Incentive:           1.  Low cost PD power supply implementations
works at
	>100KHZ. for 10-12W power supply, max. 470uF is needed. for 5W power
supply
	>220uF-270uF
	>                      is needed.
	>                              Caps lower that 50uF requires high
frequency
	>switching power supply (around 500KHZ) which costs much more.
	>
	>                         1.1 50-60% of the applications are
5-8Watts. 30-35%
	>are 10-12Watts. It means that around 95% of the applications will
need 220uF
	>to 470uF.
	>                              (Data based on PD power requirement
survey done
	>during the last 6 month)
	>
	>                         2.  In order to meets system stability
criteria as
	>discussed over the reflector during the last 3 weeks, we need to
keep low
	>L/C ratio at the PD power
	>                             supply input. Stability criteria
requires that
	>L/(ESR*C)<< Zin, L inductance, C=Capacitance of the
	>                             EMI filter, ESR is the equivalent
series
	>resistance of the Cap.(There are additional stability criteria,
however this
	>one concerns the EMI filter
	>                             connected to negative resistance
network) It
	>means that we need to allow low inductance for a given Cap size or
Large cap
	>for a
	>                             given inductor size. In order to
implement the
	>EMI filter we need the inductor to have 10-500uH (pending on
topology,
	>switching frequency and EMI
	>                             requirements) therefor we need Larger
Caps.
	>                         Although (2) can be achieved when the
inrush current
	>limiting is in the PD, It will be cost effective to the system to
allow
	>larger cap in the PD allowing
	>                             the PSE to be responsible to limit the
inrush
	>current pending that it will allow the integrated chip in the PSE.
	>
	>
	>Vport= Port voltage
	>Iport =  Port current limit level
	>N= Number of active ports per device(active port=at startup mode).
	>Tc= The time that the port is in current limit situation = The PD
capacitor
	>charging time.
	>Emax= Max energy aloud on the device.
	>
	>1. Assuming Emax=0.5*N*Vport*Iport*Tc,   Energy dissipated on the
device
	>during startup mode
	>
	>For the following max. values:
	>Vport=57V max.
	>Ip=0.5A max
	>Emax=1Joule (as per Dave data)
	>
	>Assuming that in 8 port device only one port is performing the
startup mode
	>(we can control the timing) and there is a cooling time until the
2nd port
	>will be in startup mode.
	>N=1. (Remember that it is non repetitive operation.)
	>
	>2. Tc max = Emax/(0.5*N*Vport*Iport) =
1Joule/(0.5x1*57V*0.5A)=70.16mSec
	>
	>3. Ip*Tc=Cin*Vp
	>
	>4. Cin max=Ip*Tc/Vp=0.5A*70.16mSec/57V = 615uF
	>
	> >From eq. 4 we can have 615uF instead of 50uF.
	>
	>Since the above numbers are worst case calculation, we have the
following
	>margin:
	>
	>The PSE can be set to 0.4A min.   (The calculation in eq-2 was for
0.5A)
	>Tc max can be set to 50mSecmin  (The result of eq-2 was 70.16mS)
	>
	>According to the above margin Cin max would be: Cin
	>max=0.4A*50mSec/57V=350uF
	>
	>Therfore we have 615uF/350uF  ==> 75% margin.
	>
	>In addition, the above calculations assumes repetitive operation
which is
	>not the case for startup, hence much larger margin, with no effect
on power
	>supply loss, cable loss etc.
	>
	>We can utilize the numbers that we have used for the normal
powering mode
	>and use them as a private case for the startup mode:
	>
	>During startup, the PSE will limit its output current to:
	>1.      Ip min=0.4  Ipmax=0.5
	>2.      Time duration: 50mSec min. 70mSec max.
	>3.      Period: 1 sec min. ( To allow low average power in order to
have
	>enough cooling time.  It is similar to the timings of the normal
operating
	>mode)
	>
	>PD spec.
	>Under the above numbers the PD will be specified as follows.
	>1.      Up to 350uF at PD input, PD designer have the following
resources:
	>2.      Ip=0.4A min for 50mSec min.
	>
	>For caps greater than 350uF, the PD designer will take care of
limiting the
	>inrush current to be 0.4A max (i.e. < 0.4A)
	>
	>
	>Comments
	>
	>Thanks
	>
	>Yair.
	>
	>
	>
	>
	>Darshan Yair
	>Chief   Engineer
	> > PowerDsine Ltd.  -  Powering Converged Networks
	> > 1 Hanagar St., P.O. Box 7220
	> > Neve Ne'eman Industrial Zone
	> > Hod Hasharon 45421, Israel
	>Tel:  +972-9-775-5100, Cell: +972-54-893019
	>Fax: +972-9-775-5111
	> > E-mail: <mailto:yaird@xxxxxxxxxxxxxx>.
	> > http://www.powerdsine.com
	> >
	> >
	> >