Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
I have prepared an initial draft ResE
timing/synchronization PAR and 5-criteria. I initially
prepared the draft PAR in text format; Mike Teener
has placed that in
However, I subsequently realized that these
documents are typically prepared in VG format for presentation. A revised
VG version is
posted at
(this document
supersedes the above text document)
A VG presenation for the 5
criteria is posted at
I expect
that the latter 2 documents will be moved to the http://www.ieee802.org/3/re_study/index.html area shortly.
Any comments
are welcome.
Thanks.
Best
regards,
Geoff
-------------------------------------------------------------------------------
Geoffrey M.
Garner
Samsung
(Consultant)
|