Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear LMSC members, At the March 2025 Plenary session, the 802 LMSC conditionally approved forwarding P802.11bk and P802.11bf to RevCom. The conditions for forwarding both projects have been met. For P802.11bk:
Ballot dates: 20 Mar 2025 – 30 Mar 2025 Approval rate: 98% Returned ballots: 84% Abstains: 3% A total of 3 comments were received, 1 technical, 2 editorial. The technical comment had to do with a number assigned by our ANA. After receiving an explanation for the assignment, the commenter withdrew the comment.
An updated report is available here:
https://mentor.ieee.org/802.11/dcn/25/11-25-0453-03-00bk-report-to-ec-on-conditional-approval-to-go-to-revcom.pptx For P802.11bf:
Ballot dates: 25 Mar 2025 – 4 April 2024 Approval rate: 98% Returned ballots: 82% Abstains: 1% No comments were received.
Both projects are on the RevCom agenda for the May 7 meeting. Regards, -Robert To unsubscribe from the STDS-802-LMSC list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-LMSC&A=1 |