Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Re: [802-LMSC] PROPOSED RULES CHANGE



Hi George, Geoff,

I understand the process as it is currently defined by rules and find  it unambiguous.  The SDG is responsible for resolving comments.  The SDG, in our case the LMSC, delegates that to the working groups as provided for in the superior rules.  The WGs may then delegate that to a subset of the WG, e.g. the task group, task force, or a specific CRG.  In both WG 15 and 11 the OM is clear, and sufficiently flexible to allow some adaptation. For example, both wireless WGs OMs specify that during a duly constituted session (plenary or interim), the task group assigned the project is responsible for comment resolution and to approve resolutions on behalf of the WG; in WG15 during a session.   The OMs allow for the WG to create a CRG, with specified membership, which is empowered to resolve comments and approve resolutions on behalf of the WG.

I do not understand the problem with the current flow-down that you are seeking to solve. This process has, in most cases, worked very well for quite some time in WG 15.  If a majority of the WG doesn't wish to empower a CRG, then the motion to form one will fail.  In my 20 ish years of 802.15, I am aware of only once that a motion to form a CRG has failed.  Eliminating this option, which streamlines the process without any negative effect on the quality of the draft in most cases, because once in a blue moon it isn't more efficient, is a bad idea IMO.  In the event a CRG fails to reach the required consensus, the responsibility, the responsibility reverts to the WG more or less as you propose (with a slight difference).

I see several issues created by Geoff's proposal.  

For SA ballot the ballot group is different than for WG ballots on the draft. IMO this is a positive feature, not a bug.  If I understand Geoff's proposal, the only way to approve comment resolutions is to have consensus of all voters in the WG that were in the WG ballot series pool.  Some of those voters may have ceased  participation. Once the draft is submitted to SA ballot, that pool has completed it's task.  The SA ballot "restarts" the draft review and refinement.  Again IMO this "restart" is a good thing.   If we remove the option for the WG to delegate to a dedicated CRG or to a task group/task force, we may create significant delays, especially in the later ballots where it it is possible with the current method to conduct multiple recirculation ballots between sessions.  Again, for WG 15, in the vast majority of projects (all but 1 that I can recall), this has had only positive outcomes. Geoff's proposal would either restrict recirculations to one every 2 months, or add a minimum 10 day WG electronic ballot to approve comment resolutions so as to begin a recirculation.  I see no benefit.

Note that under the present OMs for the wireless WGs, the WG is not required to delegate comment resolution. In the event that the normal approach fails, the WG may revert to pretty close to what Geoff is proposing, with no change to WG P&Ps, or the OM, at least for the wireless groups (I have not recently looked at .1 and .3 OMs.

In practice, WG 11 and WG 15 use the delegation differently at times.  Again I think this  is a feature, not a bug.  There are quite a few practical differences between the two WGs.  Providing the WG and WG chair flexibility to adapt to the needs of a project is a good thing.  A one size fits all projects approach is not optimal. 

FWIW.  Perhaps I am not understanding the problem you perceive.

Best regards

Ben

On 7/3/2026 9:43 AM, George Zimmerman wrote:

Geoff – I will add this to the agenda.  As this is regarding the WG P&Ps, and our main item of business is to get the LMSC P&Ps ready to submit to Audcom, it will be after that item on the agenda.  We may not get to it.

What would be useful would be to understand just what the proposed text change to the working group P&Ps would be, and whether, in fact, the WG P&Ps (or other LMSC level document is the appropriate place.  In looking for the right section of a document to prepare, it appears that the details of CRGs are not covered at the LMSC level and are either referred up to SASB documents or down to WG Ops manuals.

 

I have provided some background below to help you and others prepare for a discussion.

-george

 

Background:

(all) 802 WG P&Ps:

Comment resolution groups are not currently mentioned in the working group P&Ps.

Section 11, refers to the comment resolution process, stating, “Comment resolution, recirculations, etc. should be consistent with Standards Committee ballot rules and 5.4.3.2 of the IEEE-SA Standards Board Operations Manual (SASB OM).”

I note that 5.4.3.2 of the SASB OM does not cover comment resolution.  It only covers Voting on the ballot.  Comments are in 5.4.3.3 of the SASB OM.  This leaves the actual conduct of WG ballot comment resolution less securely linked to the superior rules than the voting itself is, since LMSC ballot rules don’t cover comment resolution either.

Specifically regarding membership & voting in a CRG, the best I can find is that CRGs are treated as a subgroup of the working group (see SASB OM 5.4.3 below), and, as such, under section 5 of the working group P&Ps, “Any resolution of a subgroup shall be subject to confirmation by the Working Group, unless previously or otherwise delegated to the subgroup.”  Therefore, the working group voters all have the ability to overrule any resolution of the CRG.  It would seem that other than that the ballot group of a particular WG ballot might be the fixed-in-time sample of the WG membership (and the current WG membership may differ) the WG membership has the right to approve or modify any action of the CRG.

 

SASB OM:

The SASB OM (in 5.4.3 Conduct of the standards balloting process) states: “The Standards Committee shall ensure that comment resolution occurs via a comment resolution group, which is either the Working Group or a subgroup of the Working Group.”

 

WG Ops Manuals

CRG procedures are generally found in the individual WG ops manuals, where the working group has decided to codify them.  See, for example, section 3.9 of the 802.11 ops manual, or section 5.5 of the 802.15 ops manual.

 

 

George Zimmerman, Ph.D.

President & Principal

CME Consulting, Inc.

Experts in Advanced PHYsical Communications

george@xxxxxxxxxxxxxxxxxxxx

310-920-3860

 

From: thompson@xxxxxxxx <thompson@xxxxxxxx>
Sent: Thursday, July 2, 2026 9:46 PM
To: George Zimmerman <george@xxxxxxxxxxxxxxxxxxxx>
Cc: stds-802-lmsc@xxxxxxxxxxxxxxxxx
Subject: PROPOSED RULES CHANGE

 

George-

 

As we discussed briefly...

I would like to propose discussion of a rules change with respect to comment resolution of negative votes on Working Group Ballot.

 

The current situation is that adoption of a comment resolution is taken by a vote of current Working Group voters participating in the vote.

 

I believe that it is proper to change the rule because the voting body for the motion MAY be significantly different (but often is not) from the voting body for the draft.

 

I propose that adoption of a comment resolution is taken by a vote of the members of the current draft balloting group participating in the vote (nominally those members attending the comment resolution meeting).

 

I would like to apply the same sort of criteria to SA ballot but I haven't fully figured out what that would be. So I am content to consider just WGB at this time.

 

Please put this on the agenda for discussion at the rules meeting. It we get an agreement in principle then we'll draft text to go into a formally proposed change to the rules for the next time.

 

Best regards and sincerely,

 

    Geoff Thompson

    EC Member Emeritus

    Life Senior Member

    < thompson@xxxxxxxx >

    +1.540.227.0059

 


To unsubscribe from the STDS-802-LMSC list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-LMSC&A=1




Benjamin A. Rolfe
Blind Creek Associates
Ben@xxxxxxxxxxxxxx
+1 408 332 0725 (Mobile)


Virus-free.www.avast.com

To unsubscribe from the STDS-802-LMSC list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-LMSC&A=1