Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Re: *** SEC Motion to forward 1000BASE-T(IEEE 802.3ab) to REVCOM



I approve.
Jim Mollenauer

Jim Carlo wrote:

> ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
> SEC OFFICIAL EMAIL BALLOT     802.0/6May1999
>
> Issue Date:   6May1999          Closing Date: 14May1999
> Moved By:     Geoff Thompson
> Seconded By:  Bob Grow
>
> Move: Authorize forwarding 802.3ab (1000BASE-T) to RevCom for approval at the
> June1999 IEEE-SA Standards Board Meeting contingent on the approval of a letter
> ballot motion from the voters of 802.3 scheduled to close May 10.
>
> Notes:
>
> If you recall there was a quite contentious issue at the March meeting
> regarding a request from some members to see a "proof of concept" before 802.3
> authorized it to go forward. There was no motion to go forward passed at the
> closing plenary of 802.3 in March.
>
> There is currently a 30 day 802.3 Working Group letter ballot which closes May
> 10 to approve the placement of 802.3ab on the REVCOM agenda. The current status
> of that motion is detailed below.
>
> Supporting information
>
> The Sponsor Recirculation Ballot for P802.3ab/D6.0 (1000BASE-T) closed on April
> 5. The results of that ballot were:
>
>         60      Number of eligible people in Ballot Group
> ___________________________________________________________
>         44      Affirmative votes
>          2      Negative votes (Frazier, Thaler)
>          1      Abstention vote
>    ________
>         47      Votes = 78% Returned
>                          2% Abstention
>         46/48           95% Affirmative
>
> There were comments from 3 voters during the recirculation
>         Thaler  -  Supports Seifert's proposal for "Trial-Use"
>         Seifert -  Previous plus minor editorial (to be corrected during prep for
> pub.)
>         Booth   -  Minor editorial (to be corrected during prep for pub.)
> (The complete comments are attached to this message as d60comments.doc))
>
> With this the Sponsor Balloting process is complete. The draft has met all of
> the IEEE requirements for approval, consensus and recirculation. It is ready to
> go to REVCOM for approval by the IEEE Standards Board. There was no meeting
> held to resolve comments as there were no "new negatives".
>
> There is an 802.3 Working Group letter ballot motion currently being conducted
> by e-mail to place P802.3ab/D6.0 on the June REVCOM agenda.
>
> The results to date (cob May 3) of the Working Group letter ballot motion to
> forward are:
>         75      Affirmative votes
>          1      Negative votes
>          4      Abstention vote
>    ________
>         80      Votes = 53% Returned
>                         <1% Abstention
>         75/80           98% Affirmative
>
> This ballot closes on May 10.
> The ballot has achieved the 75 votes returned by 802.3 voters that it needs to
> meet the quorum requirement. If the ballot does not pass then the matter of
> forwarding the draft will be
> on the agenda of the July meeting of 802.3. P802.3ab would then not be a
> candidate for approval as an IEEE Standard until September 1999.
>
> Jim Carlo(jcarlo@ti.com) Cellular:1-214-693-1776  Voice&FAX Mail:1-214-853-5274
> TI Fellow, Networking Standards at Texas Instruments
> Chair, ISO/IEC JTC1/SC6 Telecom and Info Exchange Between Systems
> Chair, IEEE 802 LAN MAN Standards Committee