Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear SEC members,
The Link Security SG discussed the placement of the
project in the first SG meeting on January in Vancouver. The decision
was to place the project in P802.1. A brief summary of the meeting,
including straw poll numbers, is included at the end of this message.
Based on this decision, we (802.1 and
LinkSec) are already planning the March meeting
together. We are scheduling a
Link Security session on Monday morning (8:30-10:30am) to encourage
participation from all WGs by avoiding overlaps with regular WG
meetings.
Please forward the announcement and information
below to your respective WG members.
Thank you,
Dolors
---------
IEEE802 March 2003 Plenary Meeting
Monday Morning Link Security Session
Announcement
The Link Security ECSG is scheduled to meet on
Monday Morning (8:30-10:30am) March 10t. This session does not conflict with
most WG regular meeting schedule. It is intended to facilitate participation
from all WG members since the work of this group relates to several WGs
efforts.
The agenda for this meeting is to educate each
other on the major areas related to this project (e.g EPON, bridging,
security), converge on scope, scenarios and objectives and make progress
on the work plan including architecture model, project partitioning
and PAR definition. See work plan at http://www.ieee802.org/linksec/meetings/MeetingsMaterial/Jan03/LinkSecWorkPlan_0103.pdf.
Contributions deadline: March 3rd, 2003 midnight
PST
Submission instructions: To submit your
contribution please send it by email in pdf format to dolors@ieee.org, dromasca@avaya.com, and allyn@cisco.com. In your email please
indicate title of the presentation, name of the presenter and amount of time
needed to present the material. Also if you are a member of another WG and have
schedule conflict, please indicate so.
The complete Link Security meeting schedule is
posted at: http://www.ieee802.org/linksec/meetings
-----
Summary of Link Security Jan 2003 interim meeting
in Vancouver:
The two-days meeting covered the presentations including discussion on requirements, architecture model, and PAR and 5 criteria, and lengthy discussion on scenarios, placement of the project and the need of traffic analysis. The group also discussed the location and dates of the next interim meeting. Major decisions made:
Summary of Straw Polls1. Where should the next LinkSec Interim meeting be held? Specifically, are you will to go if: a. Co-lo with .3 in Seoul - 14 b. Co-lo with .11 in Singapore - 10 c. Meet with late may June in Ottawa – 30
2. Who thinks the approach outlined by Mick for development of the PAR(s) is a good one? Yes – 36 No – 0 3. Are you in favor of moving this SG group to 802.1? Yes - 26 Negative - 0 Abstain - 12 |