Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Re: [802SEC] +++ LMSC P&P Revision Ballot +++ Editorial 2



Steve

At 10:01 AM 5/9/2006 , Shellhammer, Steve wrote:
 > I believe working groups also produce recommended practices and guides
 > sometime.  The text implies that if you want to produce a recommended
 > practice it should be done in a TAG.

You are correct. My text didn't quite do the job.

 > I think we should make it clear
 > that a working group can produce a standard, a recommended practice or a
 > guide; while a TAG can produce a recommended practice or a guide.

I think so too. Although, a staff member would probably say that
"standard" covers standards, recommended practices and guides.


 > Steve

Geoff


-----Original Message-----
From: ***** IEEE 802 Executive Committee List *****
[mailto:STDS-802-SEC@ieee.org] On Behalf Of Geoff Thompson
Sent: Monday, May 08, 2006 9:25 PM
To: STDS-802-SEC@listserv.ieee.org
Subject: Re: [802SEC] +++ LMSC P&P Revision Ballot +++ Editorial 2

Mat-

I don't think this is substantial, in that it would more accurately
reflect reality.

Change:
Page 12, Line 15, from: "LMSC standards are developed within a Working
Group 15 (WG) or Technical Advisory Group (TAG) (see Figure 2)."

To:
"LMSC standards are developed within a Working Group (WG). A Technical
Advisory Group (TAG) produces LMSC Recommended Practices or technical
recommendations regarding LMSC issues (see Figure 2)."

Page 7, line 38: "WG" should be "WGs" (also several other places too).

Geoff


At 07:22 PM 4/30/2006 , Sherman, Matthew J. (US SSA) wrote:
 >Dear EC members,
 >
 >
 >
 >Attached you will find the text for an LMSC P&P revision ballot titled
 >Editorial 2'. This ballot was approved at the Friday March 10, 2006 EC
 >meeting. The revision text is identical to that presented at the
 >meeting by Pat Thaler.  The purpose and rationale for the ballot are
 >as given in the attached ballot document.
 >
 >
 >
 >Ballot Duration:  4/30/2006 - 5/31/2006 @ 11:59 PM EDT
 >
 >
 >
 >WG/TAG chairs, please distribute this P&P revision ballot to your
 >groups, and invite them to comment through you. Please direct any
 >comments on this revision to the reflector for collection.  I plan to
 >handle any comment resolution on this ballot at the Sunday July 16th,
 >2006 LMSC P&P review session.
 >
 >
 >
 >Thanks & Regards,
 >
 >
 >
 >Mat
 >
 >
 >
 >
 >
 >Matthew Sherman, Ph.D.
 >Senior Member Technical Staff
 >BAE Systems Network Enabled Solutions (NES)
 >Office: +1 973.633.6344
 >email: matthew.sherman@baesystems.com
 >
 >
 >
 >
 >
 >
 >----------
 >This email is sent from the 802 Executive Committee email reflector.
 >This list is maintained by Listserv.

|=========================================|
| Geoffrey O. Thompson                    |
| Nortel Networks, Inc.                   |
| 4465 Great America Parkway              |
| P. O. Box 58185                         |
| Santa Clara, CA 95052-8185  USA         |
| Phone: +1 408 495 1339                  |
| E-Mail: gthompso@nortel.com             |
|=========================================|

----------
This email is sent from the 802 Executive Committee email reflector.
This list is maintained by Listserv.

|=========================================|
| Geoffrey O. Thompson                    |
| Nortel Networks, Inc.                   |
| 4465 Great America Parkway              |
| P. O. Box 58185                         |
| Santa Clara, CA 95052-8185  USA         |
| Phone: +1 408 495 1339                  |
| E-Mail: gthompso@nortel.com             |
|=========================================|

----------
This email is sent from the 802 Executive Committee email reflector.  This list is maintained by Listserv.