Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802SEC] P802.1CF to RevCom



Colleagues,

 

On November 16th, 2018 the EC granted conditional approval to forward P802.1CF to RevCom. Per OM Clause 12, this is the status:

 

  1. The process proceeded as scheduled. The second recirculation ran from November 30th to December 10th. The only received comment came from staff, stating that the draft met all editorial requirements.
  2. The approval rate is 98% (74/1/4). No Disapprove votes or Disapprove comments were submitted during last recirc. There remains 1 disapprove vote accompanying 6 MBS comments from the initial sponsor ballot. The disapprove voter did not respond to emails nor participated in the recircs, even though all 6 MBS comments were resolved with ‘accepted in principle’.
  3. No changes were made to the draft as a result of the last recirculation ballot.

 

Having met the conditions, we are proceeding to RevCom for consideration at the March RevCom meeting. Please find attached the ballot summary report for your information.

 

Cheers,

Glenn.

 

--

Glenn Parsons - Chair, IEEE 802.1

glenn.parsons@ericsson.com

+1-613-963-8141

 


To unsubscribe from the STDS-802-SEC list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-SEC&A=1

Attachment: P802.1CF_bal-sum-r2.pdf
Description: P802.1CF_bal-sum-r2.pdf