Hi Bin and all, Thanks for the contribution. I see you remove the parameters regarding CBW80+80 and CBW 160+160. And add a note of TBD.
If there is still no conclusion before D0.1, I would like to follow the SFD and define the parameters before accepting this document into D0.1. We
can further discuss during the presentation/SP. regards 于健 Ross Yu Huawei Technologies 发件人: Bin Tian [mailto:btian@xxxxxxxxxxxxxxxx]
Hi Alfred, Sigurd and Tianyu Please add the following draft text to the PHY agenda 1153r1 PDT-PHY-Timing-Related parameters I have uploaded the r1 which corrects a few errors/typos (Thank Shimi for pointing them out!) and removes the content related to CBW240 Thanks, Bin From: Wook Bong Lee <wookbong.lee@xxxxxxxxxxx>
CAUTION: This email
originated from outside of the organization. Hi Alfred, Sigurd and Tianyu, Can you please add following three documents in PHY agenda? 11-20/1252r0, PDT-PHY-Frequency Tolerance, Wook Bong Lee (Samsung) 11-20/1253r1, PDT-PHY-Modulation Accuracy, Wook Bong Lee (Samsung) 11-20/1254r1, PDT-PHY-Receive specification: General and receiver minimum input sensitivity and channel rejection, Wook Bong Lee (Samsung) Best regards, Wook Bong Lee From: Alfred Asterjadhi [mailto:asterjadhi@xxxxxxxxx]
Hello all, This is a gentle reminder that when you have spec text ready for a particular subclause/topic then the POC should request the respective chairs (MAC/PHY/JOINT) to [add the contribution to the agenda] and
run a SP for including the prepared spec text to TGbe D0.1. Quoting the particular bullet from the guidelines that deals with this aspect:
·
When the spec text for a particular subclause/topic is ready then the POC should request the respective chairs (MAC/PHY/JOINT) to run a SP for including the prepared spec text to the D0.1 of 11be.
o
The document that is planned to be ran should be posted in the server for at least 7 days prior to running the SP.
o
If the SP is approved then the TGbe editor will include the spec text to the draft, otherwise the spec text will not be included in its current form.
o
The deadline for completing this task is set for September 1st 2020 (EOD ET).
o
Note: Figures should be provided to the editor in visio format (monochromatic). Please let me know if you have any questions and/or suggestions. Best Regards,
To unsubscribe from the STDS-802-11-TGBE list, click the following link:
https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBE&A=1 To unsubscribe from the STDS-802-11-TGBE list, click the following link:
https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBE&A=1
To unsubscribe from the STDS-802-11-TGBE list, click the following link:
https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBE&A=1
To unsubscribe from the STDS-802-11-TGBE list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBE&A=1 |