Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Hi Xiandong, Thanks for your comment.
Based on the discussion during the TGbf teleconference, I think this is an implementation issue and need not be specified.
However, if you think differently, you would be better to bring a contribution on this for further discussion. Best regards, Pei 发件人:
董贤东 <dongxiandong@xxxxxxxxxx>
Hi Pei, I don’t have any problem with the MS ID included in the SBP response frame, I only have concern about the time of the transmission of the SBP response
frame, it seems have two ways, either before the measurement setup procedure or after the measurement setup procedure, to me after the measurement setup procedure is natural way, therefore would you consider to add a note “the time of the transmission of the
SBP response is TBD” in the motion text. Best Regards Xiandong
发件人:
周培(Pei Zhou) <00001462c7c6c67a-dmarc-request@xxxxxxxxxxxxxxxxx>
Hi Tony, I ran the SP of 11-22/0125 Discussion on Measurement Setup ID Setting in SBP Case in Monday.
The result is Yes/No/Abstain: 20/2/17. Therefore, I request to add the following motion to the motion list, thanks. Move to add the following to the TGbf SFD:
l
The method of assigning Measurement Setup ID for the SBP Requesting STA in Sensing by proxy (SBP) procedure is that AP assigns the Measurement
Setup ID in its SBP Response frame. Best regards, Pei 发件人:
stds-802-11-tgbf@xxxxxxxxxxxxxxxxx <stds-802-11-tgbf@xxxxxxxxxxxxxxxxx>
代表 luochaoming@xxxxxxxx Hi All, I plan to run the following motions, and if you have any further comment or concern, please do send me an email, thanks! Tony, please help to add the following two motion requests: Motion 1, Ref: 22/0286r1, SP1 18Y/3N/15A Move to add the following to the TGbf SFD:
Motion 2, Ref: 22/0286r1, SP2 14Y/3N/18A Move to add the following to the TGbf SFD: •A new action category of robust
‘Protected Sensing Frame’ is defined to separate PN segment. BR, Chaoming
OPPO 本电子邮件及其附件含有OPPO公司的保密信息,仅限于邮件指明的收件人使用(包含个人及群组)。禁止任何人在未经授权的情况下以任何形式使用。如果您错收了本邮件,请立即以电子邮件通知发件人并删除本邮件及其附件。 This e-mail and its attachments contain confidential information from OPPO, which is intended only for the person or entity whose address is listed above. Any use of the information
contained herein in any way (including, but not limited to, total or partial disclosure, reproduction, or dissemination) by persons other than the intended recipient(s) is prohibited. If you receive this e-mail in error, please notify the sender by phone or
email immediately and delete it! To unsubscribe from the STDS-802-11-TGBF list, click the following link:
https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBF&A=1 To unsubscribe from the STDS-802-11-TGBF list, click the following link:
https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBF&A=1 To unsubscribe from the STDS-802-11-TGBF list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBF&A=1 |