Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Hi Alfred, Please add the following SPs to the MAC motions list: 1 Move to add to the 11bn SFD: The event that triggers switching to the NPCA primary channel shall be
Note: Other conditions TBD Supporting documents: [24/0495r0] MAC ad hoc: no objections 2 Move to add to the 11bn SFD: The NPCA operation shall use the same EDCA parameters ((MU) EDCA Parameter Set, EPCS EDCA Parameters), on both the BSS primary channel and the NPCA primary channel. Supporting documents: [24/0495r0] MAC ad hoc: no objections 3 Move to add to the SFD: A non-AP STA that is a TXOP responder can indicate in a response frame 1) for how long it will be available, if known and/or 2) whether it will be unavailable after a specific point in time and, if known,
for how long
Supporting documents: [23-2002] MAC ad hoc: no objections Thanks Laurent From: Sindhu Verma <000011381223f2e2-dmarc-request@xxxxxxxxxxxxxxxxx>
Hi Alfred, Do you support that
Regards, Sindhu To unsubscribe from the STDS-802-11-TGBN list, click the following link:
https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBN&A=1 --------------------------------------------------------------------- This e-mail and any attachments may contain confidential material for To unsubscribe from the STDS-802-11-TGBN list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBN&A=1 |