Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
MBWA Participants
I have posted four contributions that constitute PARs and Five Criteria for a Vehicular mobility project based on a "green field" start and for a Pedestrian Mobility project as an ammendment to 802.16a. This is an attempt at trying to find a way forward by defining two projects each with narrower scope and addressing different market needs. This proposal is consistent with the suggestions made by Roger and myself and for which some of you have expressed support. The files are currently in the temp upload directory. At http://wirelessman.dyndns.org/cgi-script/CSUpload/CSUpload.cgi?database=mobile%2edb&command=viewupload&id=null
Best Regards
Mark Klerer . E-mail: m.klerer@flarion.com ( Phone: 908-997-2069 6 Fax: 908-997-2050
|