Dear 802.16 M2M Fans, The 802.16 Project Planning Committee first conference call details for discussing input contributions on M2M System Requirements (802.16p) is provided below:
50 lines have been reserved. Hope those interested in M2M will be able to join. I do
recognize the timeslot is not the best, but this was what was proposed in July,
hence let us stick with it. Thanks & best regards, Jose (802.16 Project Planning Committee Chair) From: Puthenkulam, Jose P
[mailto:jose.p.puthenkulam@INTEL.COM] Dear 802.16 M2M Fans, The 802.16 Project Planning Committee invites contributions
for Machine to Machine (M2M) System Requirements Document (IEEE
802.16ppc-10/0011 - http://ieee802.org/16/ppc/docs/80216ppc-10_0011.doc)
based on the proposed IEEE 802.16p M2M PAR (IEEE 802.16ppc-10/003r9 - http://ieee802.org/16/ppc/docs/80216ppc-10_0003r9.doc). Initial input contributions will be discussed during the
conference calls scheduled on this topic as agreed to in the July plenary (See
PPC report IEEE 802.16ppc-10/0010r2 - http://ieee802.org/16/ppc/docs/80216ppc-10_0010r2.ppt).
The conference call times proposed are : Aug 25th : 5-7PM Pacific Time Sept 8th : 5-7PM Pacific Time Please upload the initial contributions to the PPC folder on
the http://upload.wirelessman.org,
by Aug 24th AOE for the first conference call. Contributions can
also be submitted for the second conference call by Sept 7th AOE and
also for the Sept Session #69 by Sept 12th AOE. Please follow the PPC contribution submission guidelines (http://dot16.org/ul//upload/ppc_db/submit.html) Thanks & best regards, Jose (802.16 Project Planning Committee Chair) [AOE = Anywhere on earth http://www.ieee802.org/16/aoe.html
] |