Support Documents |
|
BACK to
July Presentations |
Filename |
Ver |
Author |
Title |
|
july_agenda_07.xls |
6 |
Mike Takefman |
Current agenda |
|
mlt_admin_01.pdf |
1 |
Mike Takefman |
Administrivia Slides |
|
mlt_network_01.pdf |
1 |
Mike Takefman |
Networking proposal for 802.17 |
|
minutes_051401_02.pdf |
2 |
B.J. Lee, M. O'Connor |
Minutes from last meeting (May) for review and approval |
|
minutes_071301_d01.pdf |
2 |
B.J. Lee, M. O'Connor |
Minutes from this meeting (July) preliminary |
|
bs_prop_01.pdf |
1 |
Bob Sultan |
Proposal for Portland |
|
DraftTemplateOverview.pdf |
1 |
David James |
Overview of Draft Standard for IEEE Template |
|
DraftTemplate.doc |
1 |
David James |
Draft Standard for IEEE Template |
|
upload_final_01.zip |
1 |
John Hawkins |
Zip file of all presentations below. |
|
Presentation
Documents |
|
|
Filename |
Ver |
Author |
Title |
Filenumber |
kv_prop_01.pdf |
1 |
Kanaiya Vasani & John Hawkins |
A Proposal for a standard |
802-17-01-00026 |
hp_arch_01.pdf |
1 |
Harry Peng |
Architecture and Analysis |
802-17-01-00034 |
bdh_adp_01.pdf |
1 |
Brian Holden |
Automatic Topology Discovery Protocol |
802-17-01-00007 |
hp_brdg_01.pdf |
1 |
Harry Peng |
Bridging Comments |
802-17-01-00035 |
pkj_bwmgt_02.pdf |
2 |
Pankaj Jha |
BW Management on ring spans |
802-17-01-00032 |
nu_crate_03.pdf |
3 |
Necdet Uzun |
Committed Rate Service Support |
802-17-01-00020 |
nu_efa_01.pdf |
1 |
Necdet Uzun |
Enhanced Fairness Algorithm |
802-17-01-00005 |
dr_ethmib_01.pdf |
1 |
Dan Romascanu |
Ethernet MIB
Standards Update |
802-17-01-00038 |
sw_fair_02.pdf |
2 |
Steve Wood |
Extending Nodal Fairness |
802-17-01-00016 |
mlt_gap_02.pdf |
2 |
Michael Takefman |
Gap Analysis of Objectives |
802-17-01-00019 |
dr_subip_01.pdf |
1 |
Dan Romascanu |
IETF Sub-IP Area |
802-17-01-00039 |
dvj_interop_02.pdf |
2 |
David James |
Interoperable Features: CRC checking, cut-through,
preemption |
802-17-01-00011 |
sa_ipdiff_02.pdf |
2 |
Siamack Ayandeh |
Ip Differentiated Services requirements for RPR |
802-17-01-00006 |
aph_iporpr_01.pdf |
1 |
Albert Herrera |
IPoRPR Requirements |
802-17-01-00002 |
bjl_inter_02.pdf |
2 |
B.J. Lee |
Issues and Requirements for RPR Interconnection |
802-17-01-00031 |
ib_rprsdh_02.pdf |
2 |
Italo Busi |
Mapping of RPR over SDH |
802-17-01-00008 |
glm_primap_01.pdf |
1 |
Gal Mor |
Mapping Types of Service to RPR Priorities |
802-17-01-00013 |
ib_oamp_02.pdf |
2 |
Italo Busi |
OAM&P Requirements for RPR |
802-17-01-00009 |
dg_pathmtu_01.pdf |
1 |
Denton Gentry |
Path MTU Discovery Protocol |
802-17-01-00025 |
atf_oamp_01.pdf |
1 |
Angela T Faber |
Performance Monitoring (OAM&P) |
802-17-01-00041 |
cch_opeprf_01.pdf |
1 |
Changcheng Huang |
Performance Study of Nortel OPE-RPR (II) |
802-17-01-00023 |
py_PhaseI.pdf |
1 |
Pinar Yilmaz & Necdet Uzum |
Phase I Simulation Results |
802-17-01-00046 |
nu_plug_01.pdf |
1 |
Necdet Uzun |
Plug and Play Operation |
802-17-01-00004 |
jfm_stdline_03.pdf |
3 |
Jim Mollenauer |
Proposed Outline for the Standard |
802-17-01-00010 |
jfm_draft_01.pdf |
1 |
Jim Mollenauer |
Proposed Draft for the Standard |
802-17-01-00010 |
jal_topo_01.pdf |
1 |
John Lemon |
Proposed Topology Discovery Algorithm |
802-17-01-00040 |
gs_hier_02.pdf |
2 |
George Suwala |
Protection Hierarchy, Wrapping,Steering and Topology Discovery |
802-17-01-00014 |
hp_size_02.pdf |
2 |
Harry Peng, Steve Wood |
Ring Size Study |
802-17-01-00018 |
pkj_topwte_01.pdf |
1 |
Pankaj Jha |
Ring Topology Determination with traffic engineering |
802-17-01-00033 |
mk_rr_01.pdf |
1 |
Michael Kelsen |
Road Runner Deployment of SRP |
802-17-01-00048 |
nrs_ndidfa_02.pdf |
2 |
Nirmal Saxena |
RPR MAC Address-Node Id Binding and Fairness Algorithm |
802-17-01-00022 |
dxie_phase1_01.pdf |
1 |
Donghui Xie |
RPR MAC Delay Metric and SRP Phase One Simulation |
802-17-01-00043 |
fo_rprwdm_02.pdf |
2 |
Fredrik Orava |
Scaling RPR with WDM and multiple rings: one control plane
multiple transit paths |
802-17-01-00027 |
kp_sla_02.pdf |
2 |
Krishna Pattabhiraman |
SLA Delivery over RPR |
802-17-01-00045 |
lbr_swisad_01.pdf |
1 |
Leon Bruckman |
SWIS advantages |
802-17-01-00012 |
lbr_swisdoc_01.doc |
1 |
Leon Bruckman |
Selective Wrap-Independent Steer (SWIS) Draft |
802-17-01-00012_ |
bs_terms_04.pdf |
4 |
Bob Sultan |
Terms and Definitions Adhoc |
802-17-01-00042 |
bbj_linkag_01.pdf |
1 |
Bruce Johnson |
The Importance of Link Aggregation |
802-17-01-00036 |
ft_rprmsg_01.pdf |
1 |
Frederic Thepot |
Topology Discovery, boot process and active RPR messages
on the rings |
802-17-01-00028 |
ga_tbrdg_01.pdf |
1 |
Gunes Aybay |
Transparent Bridging Over RPR |
802-17-01-00003 |
am_voqmdl_02.pdf |
2 |
Adisak Mekkittikul |
VoQ Model of RPR MAC |
802-17-01-00030 |
|
|
|
|
|
These
pages created and maintained by Edward Messina and John Hawkins |
|
|
|
|
|
|
Copyright
(c) 2001, the Institute of Electrical and Electronics Engineers, Inc. (IEEE). |
|
All rights reserved. |
|
|
|
|
|
|
This website may contain names, logos, designs, titles, words,
or phrases that may constitute trademarks, service marks, or trade names of
the IEEE or other entities which may be registered in certain jurisdictions. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|