| Thread Links | Date Links | ||||
|---|---|---|---|---|---|
| Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index | 
Attached is the contribution that Anna provided at the Plenary meeting,
1)      The CG needs to come to consensus on the TBR  values. 
2)      Is there still a need to specify ARQ loop delay to be consistent with the PAR? 
<<Latency&PacketErrorRate.doc>>
6220 Sprint Parkway
Mailstop KSOPHD0504 - 5D276
Overland Park, KS 66251-6118
PCS (816) 210-9611