Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear .21 members, I received this from the EC Vice-Chair, Matt Sherman regarding the proposed P&P rules changes. Please go through these and let me know if you have any concerns/comments regarding the same before the start of the July Plenary meeting. regards, -ajay Chair, IEEE 802.21 WG -------- Attached you will find a zip file containing: 1) A P&P Revision cover letter (802.0-Compliance_with_SA_Model_P&P-Balloted_P&P_Revision_ballot.pdf) 2) Text for the P&P revision (SA_Model_compliant_LMSC_P&P_040514.doc) 3) A mapping of text from the "old" P&P to the "new" P&P (LMSC_P&P-March_2004_R0_reformat-map_040514.doc) The scope of this P&P revision is to bring the LMSC P&P into "editorial" conformance with the SA Model Sponsor P&P. That is to match the format of the SA model Sponsor P&P, but not to add or delete any "governance" content from the current LMSC P&P. (I use the term "Governance" here is sense analogous to the term "normative" in standardese.) This letter ballot was approved at the Friday, March 19, 2004 EC meeting. The rationale for the changes being balloted are as given in the attached cover letter. The actual changes are given in the second document listed above. The changes are made in Word track changes mode against the SA model Sponsor P&P (http://standards.ieee.org/board/aud/sponsmod.rtf). Normally, I would provide a pdf of the changes rather than a word document, but I have placed embedded comments in the file, and don't know how to maintain them in pdf format. While this is a set of "editorial changes" to bring our P&P into the same overall format as the SA model P&P, the changes are very extensive, and a number of issues for future P&P are noted. Please review the changes closely. I expect I will have additional recommendations for editorial changes prior to the close of this ballot. Note that all embedded comments will be removed from the document once approved, prior to formal release. The comments are there to highlight issues that have arisen during the reformatting process that will have to be addressed in a future ballot as I believe them to require governance changes. Note that a reformat map is provided in the third document listed above. It is a heavily commented version of the current P&P that indicates where in the "New P&P" each section of text from the "old P&P" gets mapped. It will help the reader to confirm that I have neither added nor deleted anything other than editorial content in reformatting the P&P. Regards, Mat PS - Note that because of corporate firewall issues, the file has been renamed the zip file extension to "renamed_zip". Prior to attempting to open the zip file you should change the file extension back to "zip". If anyone has problems opening the file please contact me and I will provide the contents in uncompressed form. <<Compliance_with_SA_Model_P&P-Balloted_P&P_Revision_ballot.renamed_zip>>
Compliance_with_SA_Model_P&P-Balloted_P&P_Revision_ballot.renamed_zip