Bradley
I do not support this change. I think
the PAR and objectives already make it perfectly clear that we are only
defining a PHY.
Bruce
At 08:58 AM 9/24/2003 -0700, Booth,
Bradley wrote:
Greetings,
Howard Frazier has proposed the following modification to the scope
of the 10GBASE-T PAR to help narrow the focus and prevent the interpretation
that the Study Group is planning to make modifications to the MAC, and to
make sure the Study Group is focused on the horizontal structured copper
cabling environment:
Specify a Physical Layer (PHY) for operation at 10
Gb/s
on
horizontal structured copper cabling, using the existing
Media Access Controller, and
with extensions to the appropriate
physical layer management
parameters, of IEEE Std 802.3.
Is there any
feedback on this proposed modification?
Thanks,
Brad Booth
Chair, 10GBASE-T Study Group
Bruce Tolley
Senior Manager, Emerging Technologies
Gigabit Systems Business Unit
Cisco Systems
170 West Tasman Drive
MS SJ B2
San Jose, CA 95134-1706
internet: btolley@cisco.com
ip phone: 408-526-4534
"Don't put your hiking boots in the oven unless you plan on eating
them."
Colin Fletcher, The Complete Walker