Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear all,
attached please find the final report from
Task 3 activities within the ad hoc on higher split ratio.
A short reminder on the specific goals of
this task: examination of the current state of RX/TX/AMP technology along with
estimation of economic and technical aspects of application of various RX/TX/AMP
component configurations, aiming at achieving >= 29 dB budgets required for
proper system operation with 1x64 and 1x128 split ratios with the target
distances of 10 and 20 km.
Any comments and suggestions are more than
welcome. Slide number 2 includes a list of supporters and participants of this
Task. If You want to be also included in this list, please email me. (The names
are sorted alphabetically against the first names).
Best wishes
Marek
Hajduczenia (141238)
|