[8023-10GEPON] [Channel link model] Update on the http://www.ieee802.org/3/av/public/tools/3av_0801_linkmodel_v2_2_power_budgets.xls
Dear all,
during the last meeting, I noticed that there was one
of the power budget classes missing in the examples of our power budgets based
on the Channel Link Model v2.2.
Attached please find the updated spreadsheet with all
the links created by our PMDs.
Individual tabs include the following links:
tab: PR-D1 & PXR-D1 + PR-U1 > OLT [PR-D1 &
PXR-D1] + ONU [PR-U1] - PR10 downstream
tab: PR-D2
& PXR-D2 + PR-U2 > OLT [PR-D2 & PXR-D2] + ONU [PR-U2] - PR20
downstream
tab: PR-D3
& PXR-D3 + PR-U3 > OLT [PR-D3 & PXR-D3] + ONU [PR-U3] - PR30
downstream
tab: PR-U1 + PR-D1 > ONU [PR-U1] + OLT
[PR-D1] - PR10 upstream
tab: PR-U1 + PR-D2 >
ONU [PR-U1] + OLT [PR-D2] - PR20 upstream
tab: PR-U3 + PR-D3 > ONU [PR-U3] + OLT
[PR-D3] - PR30
upstream
tab: PRX-U3 + PRX-D3 > ONU [PRX-U3] + OLT
[PRX-D3] - PRX30 upstream (1G)
I do not present the PRX20 and PRX10 since they are
based on the existing PMDs.
All comments are more than welcome.
Please be ready to approve the updated sheet with
examples at the next meeting.
Best wishes
Marek
Hajduczenia (141238)
NOKIA
SIEMENS Networks S.A.
System Architect – COO BBA DSLAM
R&D
Rua
Irmãos Siemens, 1, Ed. 1, Piso 1
Alfragide, 2720-093 Amadora,
Portugal
*
marek.hajduczenia@nsn.com
(+351.21.416.7472 4+351.21.424.2337