[8023-10GEPON] [Channel link model] Update on the http://www.ieee802.org/3/av/public/tools/3av_0801_linkmodel_v2_2_power_budgets.xls
Dear all,
during the
last meeting, I noticed that there was one of the power budget classes missing
in the examples of our power budgets based on the Channel Link Model v2.2.
Attached
please find the updated spreadsheet with all the links created by our PMDs.
Individual
tabs include the following links:
tab: PR-D1
& PXR-D1 + PR-U1 > OLT [PR-D1 & PXR-D1] + ONU [PR-U1] - PR10
downstream
tab: PR-D2
& PXR-D2 + PR-U2 > OLT [PR-D2 & PXR-D2] + ONU [PR-U2] - PR20
downstream
tab: PR-D3
& PXR-D3 + PR-U3 > OLT [PR-D3 & PXR-D3] + ONU [PR-U3] - PR30
downstream
tab: PR-U1 + PR-D1 > ONU [PR-U1] + OLT
[PR-D1] - PR10 upstream
tab: PR-U1
+ PR-D2 > ONU [PR-U1] + OLT [PR-D2] - PR20
upstream
tab: PR-U3 + PR-D3 > ONU [PR-U3] + OLT
[PR-D3] - PR30
upstream
tab: PRX-U3
+ PRX-D3 > ONU [PRX-U3] + OLT [PRX-D3] - PRX30 upstream
(1G)
I do not
present the PRX20 and PRX10 since they are based on the existing PMDs.
All comments
are more than welcome.
Please be
ready to approve the updated sheet with examples at the next meeting.
Best
wishes
PS. Sorry
for a replication - problems with the email
Marek
Hajduczenia (141238)
NOKIA
SIEMENS Networks S.A.
System Architect – COO BBA DSLAM
R&D
Rua
Irmãos Siemens, 1, Ed. 1, Piso 1
Alfragide, 2720-093 Amadora,
Portugal
*
marek.hajduczenia@nsn.com
(+351.21.416.7472 4+351.21.424.2337
3av_0801_linkmodel_v2_2_power_budgets_updated.xls