Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[8023-10GEPON] P802.3av/D2.1 Recirculation Ballot Results



Dear Colleagues,

I am pleased to report that the IEEE 802.3 Working Group recirculation ballot on IEEE Draft P802.3av/D2.1 has closed, with the following results:

Voters                          221
Approve                         122
Disapprove (with comments)       12
Disapprove (without comments)     1
Abstain                          22
Returns                         157

These returns resulted in the following metrics:
Response Rate     71%
Approval Rate     91%
Abstention Rate   14%

The ballot has met the required response rate (>50%), abstention rate (<30%), and approval rate (>75%).


During this ballot period we have received 296 new comments on D2.1. Of these, there are
- 30 TRs
- 95 Ts
- 21 ERs,
- 150 Es

A report containing these comments is available at the following URL:
http://www.ieee802.org/3/av/public/2008_11/3av_0811_comments_d2_1_received.pdf

You will notice that this report also contains 20 unsatisfied negative comments from the initial working group ballot (17 TRs and 3 ERs). These unsatisfied negative comments are numbered beginning with the sequence 20000, and were included in the recirculation ballot.

Our editors are hard at work producing proposed responses to each of the comments.  According to our announced schedule, the proposed responses will be published on or before Monday, November 3rd.

My thanks to everyone who reviewed our draft and gave us constructive feedback.


Glen Kramer
Chair, IEEE P802.3av "10GEPON" Task Force
glen.kramer@xxxxxxxx